In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 3 of the 76 studies that could observe it (limited evidence).

What happens

Switching the forming machine from one product or package format to another requires stopping production to remove and refit moulds, tooling or forming parts, reset dimensional and process parameters, and verify the first good units before resuming the run. The elapsed time between the last good unit of the previous format and the first good unit of the new one is lost to production.

What is done about it

Apply SMED methodology to separate internal from external setup activities, standardize and pre-stage tooling, use quick-change fixtures and locating features, and document a repeatable sequence so the forming machine can be reset with minimal stopped time.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
1.3% [0.3–3.2%]
Expected share of lost time
0.7% [0.2–1.9%]
Share of lost time when present
58% [46–68%]
Studies / units
76 / 96
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    2.1% [0.3–7.4%]5 studies
  • Soft drinks, bottled water and juices
    1.3% [0.2–4.5%]11 studies
  • Brewing, wine and spirits
    1.6% [0.2–6.0%]0 studies
  • Bakery and pasta
    1.6% [0.3–4.7%]25 studies
  • Meat, poultry and seafood
    1.5% [0.2–5.2%]3 studies
  • Fruit and vegetable processing
    1.5% [0.2–5.1%]3 studies
  • Grain and oilseed milling
    1.5% [0.2–5.2%]0 studies
  • Sugar and confectionery
    1.9% [0.3–6.4%]8 studies
  • Snacks, coffee, tea and other foods
    1.4% [0.2–4.6%]7 studies
  • Animal feed and pet food
    1.4% [0.2–4.7%]6 studies
  • Food manufacturing (unspecified or mixed)
    1.4% [0.2–4.6%]8 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Switching the forming machine from one product or package format to another requires stopping production to remove and refit moulds, tooling or forming parts, reset dimensional and process parameters, and verify the first good units before resuming the run. The elapsed time between the last good unit of the previous format and the first good unit of the new one is lost to production.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows a sustained non-running machine state tagged as changeover or setup, bracketed by the end of the prior production order and the start of the new one, with no fault alarms active; associated counters for mould or tooling changes and operator login events to the changeover procedure typically coincide with the stop.

Countermeasure

Engineering guidance

Apply SMED methodology to separate internal from external setup activities, standardize and pre-stage tooling, use quick-change fixtures and locating features, and document a repeatable sequence so the forming machine can be reset with minimal stopped time.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Mean event duration: 210 min · as reported: “changeover (selected type, average, long-run)”
    Show verbatim quote
    The new changeover time was even lower than the project goal, but in the long run, the time was 210 minutes. This time is kept without any major problems.
  2. Number of events: 58.0 events/year · as reported: “changeover (selected type, annual frequency)”
    Show verbatim quote
    At a frequency of 58 changeovers per year and with a given number of operators and wage rates, the annual savings would be 91 thousand. CZK.
  3. Mean event duration: 244 min · as reported: “changeover (selected type, average)”
    Show verbatim quote
    The project team decided on the main goal of the project, which was to reduce the time of the selected sort by 10% of the average changeover time, from 244 minutes to 220 minutes.
  4. Mean event duration: 185 min · as reported: “changeover (most frequent type)”
    Show verbatim quote
    Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step.
  5. Mean event duration: 240 min · as reported: “changeover (selected type for SMED project)”
    Show verbatim quote
    Of these types of changeovers, the fourth longest changeover was the most frequent (which would take 185 minutes), but the longest and second most frequent type of changeover (240 minutes) was eventually chosen by project team for the next step.
  6. Mean event duration: 194 min · as reported: “changeover (selected type, average, first re-measurement)”
    Show verbatim quote
    The average throw time dropped from 244 minutes to 194 minutes (Figure 7) and the target was met.
  7. Mean event duration: 4.00 min · as reported: “Exchange of molds”
    Show verbatim quote
    Exchange of molds: 0:04:00
  8. Mean event duration: 7.00 min · as reported: “Forming of molds”
    Show verbatim quote
    Forming of molds: 0:07:00
  9. Lost time: 280 min · as reported: “Total duration of mold change”
    Show verbatim quote
    From the data collection of the total duration of mold change times, a total of 280 minutes on average was obtained, and the times of internal activities, 254 min, and external activities, 26 min.
  10. Lost time: 82.0 min · as reported: “format changeovers (changing from circular to rectangular cookies)”
    Show verbatim quote
    It was documented that the setup time averages 1.37 hours per day (82 minutes), consuming a significant portion of the available shift time.
  11. Number of events: 10.0 events/week · as reported: “operational interruptions during mold changeover”
    Show verbatim quote
    As-Is interruptions: 10 per week → 1 per week
  12. Number of events: 1.00 events/week · as reported: “operational interruptions during mold changeover”
    Show verbatim quote
    Week 5: 1 interruption
  13. Number of events: 5.00 events/week · as reported: “operational interruptions during mold changeover”
    Show verbatim quote
    Week 1: 5 interruptions
  14. Number of events: 3.00 events/week · as reported: “operational interruptions during mold changeover”
    Show verbatim quote
    Weeks 2, 3, and 4 stabilized at three interruptions each, showing improved workflow continuity and reduced operational stops.