Included study
Evaluasi Kinerja Mesin Giling Menggunakan Metode OEE dalam Upaya Pengurangan Six Big Losses di PT PG Candi Baru Sidoarjo
1Bibliographic record
- Authors
- Mohammad Tathmainul Qulub, Achmad Misbah
- Year
- 2025
- Venue
- Jurnal Serambi Engineering
- DOI
- —
- Country
- Indonesia
- Segment
- Sugar and confectionery
- Process family
- Milling, extraction and separation
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · 1 machines
- Observation period
- 184 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Objek penelitian adalah mesin deflektor fibrizer yang merupakan unit awal pada stasiun penggilingan tebu.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 2 / Section 3, Analisis Nilai Performance)hasil perhitungan menunjukkan nilai rata-rata Performance mesin giling selama periode pengamatan adalah 100%. | none | Performance | 100 % | Both extractors agreed |
—Show verbatim quote (Table 3 / Section 3, Analisis Nilai Quality)hasil perhitungan menunjukkan nilai rata-rata Quality mesin giling selama periode Mei hingga Oktober 2024 sebesar 97%. | none | Quality | 97.0 % | Both extractors agreed |
—Show verbatim quote (Table 1 / Section 3, Analisis Nilai Availability)hasil perhitungan menunjukkan nilai rata-rata availability mesin giling selama tahun 2024 sebesar 99%, yang telah melampaui standar world class ≥90%. | none | Availability | 99.0 % | Both extractors agreed |
—Show verbatim quote (Table 4 / Section 3, Analisis nilai OEE)hasil perhitungan Overall Equipment Effectiveness (OEE) pada mesin deflektor fibrizer selama periode Mei hingga Oktober 2024 menunjukkan nilai rata-rata sebesar 96%. | none | OEE | 96.0 % | Both extractors agreed |
—Show verbatim quote (Section 3, Analisis Six Big Losses)Urutan ketiga adalah setup and adjustment losses dengan nilai rata-rata kerugian sekitar 23%. | Setup and adjustments | Share of lost time | 23.0 % | Both extractors agreed |
—Show verbatim quote (Section 3, Analisis Six Big Losses)Equipment failure berkontribusi sekitar 23% terhadap total six big losses. | Equipment failure (breakdowns) | Share of lost time | 23.0 % | Both extractors agreed |
—Show verbatim quote (Section 3, Analisis Six Big Losses)Yield Losses ini menyumbang sekitar 54% dari total kerugian yang terjadi sepanjang periode pengamatan. | Start-up losses (reduced yield) | Share of lost time | 54.0 % | Both extractors agreed |
Equipment FailureDeflector FibrizerShow verbatim quote (Tabel 5. Analisis six big losses mesin giling tahun 2024)Jumlah 5,94 5,94 0,00 0,00 0,00 16,20 | Equipment failure (breakdowns) | Lost time | 5.94 h | Single extractor |
Setup and AdjustmentDeflector FibrizerShow verbatim quote (Tabel 5. Analisis six big losses mesin giling tahun 2024)Jumlah 5,94 5,94 0,00 0,00 0,00 16,20 | Setup and adjustments | Lost time | 5.94 h | Single extractor |
Idling and Minor StoppagesDeflector FibrizerShow verbatim quote (Tabel 5. Analisis six big losses mesin giling tahun 2024)Jumlah 5,94 5,94 0,00 0,00 0,00 16,20 | Idling and minor stops (micro-stops) | Lost time | 0 h | Single extractor |
Reduce SpeedDeflector FibrizerShow verbatim quote (Tabel 5. Analisis six big losses mesin giling tahun 2024)Jumlah 5,94 5,94 0,00 0,00 0,00 16,20 | Reduced speed | Lost time | 0 h | Single extractor |
Process Rework LossDeflector FibrizerShow verbatim quote (Tabel 5. Analisis six big losses mesin giling tahun 2024)Jumlah 5,94 5,94 0,00 0,00 0,00 16,20 | Process defects (scrap and rework) | Lost time | 0 h | Single extractor |
Yield LossesDeflector FibrizerShow verbatim quote (Tabel 5. Analisis six big losses mesin giling tahun 2024)Jumlah 5,94 5,94 0,00 0,00 0,00 16,20 | Start-up losses (reduced yield) | Lost time | 16.2 h | Single extractor |
Observation units
- Mesin Giling (Deflektor Fibrizer) · Milling and grinding · Baseline
- Deflector Fibrizer · Milling and grinding · Baseline