Maintenance System Analysis Using the Total Productive Maintenance (TPM) Method
1Bibliographic record
- Authors
- Yusril Ananta, Bayu Ilham Pradana
- Year
- 2025
- Venue
- Jurnal Management Risiko dan Keuangan
- DOI
- —
- Country
- Indonesia
- Segment
- Sugar and confectionery
- Process family
- Milling, extraction and separation
- Study type
- Single case study
- Extraction scope
- Abstract only
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
This study aims to analyze the maintenance system of the mill station at PG Krebet Baru Unit of PT PG Rajawali I, evaluate its effectiveness, and provide recommendations for improving machinery and production equipment maintenance based on the Total Productive Maintenance (TPM) method.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 5High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—mill stationShow verbatim quote (Abstract)The OEE value reached 98.53%, with availability at 99.17%, performance efficiency at 99.97%, and quality rate at 99.38%. | none | Quality | 99.4 % | Both extractors agreed |
—mill stationShow verbatim quote (Abstract)The OEE value reached 98.53%, with availability at 99.17%, performance efficiency at 99.97%, and quality rate at 99.38%. | none | Performance | 100.0 % | Both extractors agreed |
—mill stationShow verbatim quote (Abstract)The OEE value reached 98.53%, with availability at 99.17%, performance efficiency at 99.97%, and quality rate at 99.38%. | none | Availability | 99.2 % | Both extractors agreed |
—mill stationShow verbatim quote (Abstract)The OEE value reached 98.53%, with availability at 99.17%, performance efficiency at 99.97%, and quality rate at 99.38%. | none | OEE | 98.5 % | Both extractors agreed |
reduced speed lossesmill stationShow verbatim quote (Abstract)The Six Big Losses analysis indicates that the largest loss is reduced speed losses at 6.9%. | Reduced speed | Share of lost time | 6.90 % | Both extractors agreed |
Observation units
- Mill station · Milling and grinding · Baseline