foratvise
Get Started
Reduced speed

Reduced speed loss (cause not specified)

Reduced speedPerformanceWhole line or unspecified equipment

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 63 % of the line's lost time. Reported by 4 of the 127 studies that could observe it (limited evidence).

What happens

The equipment or line runs below its rated or ideal speed for a sustained period without the underlying physical or organisational reason being identified in the source report; the label simply records the OEE speed-loss category rather than a specific failure mode. Typical hidden drivers include conservative operator settings, minor mechanical wear, material handling constraints or upstream/downstream rate mismatches that are never broken down further.

What is done about it

Disaggregate the generic speed-loss figure by correlating speed trend data with shift, product, operator and upstream/downstream states to identify the dominant driver, then target it specifically (mechanical overhaul, parameter standardisation, line balancing). Establish and enforce a documented standard running speed per product/format so deviations trigger investigation rather than remaining unrecorded.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
1.2% [0.3–2.8%]
Expected share of lost time
0.7% [0.2–1.8%]
Share of lost time when present
63% [51–74%]
Studies / units
127 / 161
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.2% [0.2–4.0%]13 studies
  • Soft drinks, bottled water and juices
    1.1% [0.2–3.3%]26 studies
  • Brewing, wine and spirits
    1.3% [0.2–4.2%]11 studies
  • Bakery and pasta
    1.5% [0.3–4.4%]24 studies
  • Meat, poultry and seafood
    1.3% [0.2–4.4%]9 studies
  • Fruit and vegetable processing
    1.3% [0.2–4.5%]7 studies
  • Grain and oilseed milling
    1.3% [0.2–4.5%]6 studies
  • Sugar and confectionery
    1.2% [0.2–4.0%]9 studies
  • Snacks, coffee, tea and other foods
    1.3% [0.2–4.3%]5 studies
  • Animal feed and pet food
    1.3% [0.2–4.3%]7 studies
  • Food manufacturing (unspecified or mixed)
    2.8% [0.4–9.0%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The equipment or line runs below its rated or ideal speed for a sustained period without the underlying physical or organisational reason being identified in the source report; the label simply records the OEE speed-loss category rather than a specific failure mode. Typical hidden drivers include conservative operator settings, minor mechanical wear, material handling constraints or upstream/downstream rate mismatches that are never broken down further.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows the machine or line in running (automatic) state with no stop or fault alarm active, yet the instantaneous speed or cycle-time signal sits persistently below the programmed ideal rate, producing a gap between theoretical and actual output counters over the shift. No discrete micro-stop or blocking/starvation events accompany the deviation, so it appears as a continuous rate shortfall rather than discrete events.

Countermeasure

Engineering guidance

Disaggregate the generic speed-loss figure by correlating speed trend data with shift, product, operator and upstream/downstream states to identify the dominant driver, then target it specifically (mechanical overhaul, parameter standardisation, line balancing). Establish and enforce a documented standard running speed per product/format so deviations trigger investigation rather than remaining unrecorded.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of planned time: 0 % · as reported: “Reduced Speed Losses”
    Show verbatim quote
    Rata-Rata 0,099271 9,29814 30,74813 0,00000 0,00000 0,13414
  2. Share of lost time: 14.1 % · as reported: “Reduce Speed Losses”
    Show verbatim quote
    Reduce Speed Losses 4.490,67 14,07 3
  3. Lost time: 4,491 min · as reported: “Reduce Speed Losses”
    Show verbatim quote
    Reduce Speed Losses 4.490,67 14,07 3
  4. Share of lost time: 0 % · as reported: “Reduced Speed Losses”
    Show verbatim quote
    Rata-Rata 0,099271 9,29814 30,74813 0,00000 0,00000 0,13414
  5. Share of planned time: 33.6 % · as reported: “reduced speed losses”
    Show verbatim quote
    Pada mesin E dengan nilai efektivitas mesin terendah diketahui pada perhitungan six big losses terdapat dua losses yang paling dominan yaitu pada idling and minor stoppages losses dan reduced speed losses dengan nilai dari masing – masing losses adalah 48,95% dan 33,55%.
  6. Share of lost time: 33.6 % · as reported: “reduced speed losses”
    Show verbatim quote
    pada perhitungan six big losses terdapat dua losses yang paling dominan yaitu pada idling and minor stoppages losses dan reduced speed losses dengan nilai dari masing – masing losses adalah 48,95% dan 33,55%
  7. Share of lost time: 11.7 % · as reported: “reduced speed losses”
    Show verbatim quote
    Rata-rata kerugian yang terjadi pada setiap mesin yaitu breakdown losses 0,048%, setup and adjustment losses 0,159%, idle and minor stoppages 12,127%, dan reduced speed losses 11,749%.
  8. Share of lost time: 0 % · as reported: “Reduced Speed Losses”
    Show verbatim quote
    Reduced Speed Losses 0 0 100
  9. Lost time: 0 min · as reported: “Reduced Speed Losses”
    Show verbatim quote
    Reduced Speed Losses 0 0 100
  10. Share of loss events: 39.0 % · as reported: “Reduce Speed Losses”
    Show verbatim quote
    Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
  11. Share of planned time: 3.82 % · as reported: “Reduce Speed Losses”
    Show verbatim quote
    Reduce Speed Losses with an average proportion of 3.82% and a relative frequency of 39.01%, Downtime Losses with an average of 2.27% and a relative frequency of 28.31%, Defect Losses with an average of 1.58% and a relative frequency of 15.59%, Idle and Minor Stoppage with an average of 1.55% and a relative frequency of 15.85%.
  12. Lost time: 6.30 jam · as reported: “Reduced Speed Losses”
    Show verbatim quote
    Reduced Speed Losses 6,30 45,53 90,14%
  13. Share of planned time: 12.4 % · as reported: “Reduced speed losses”
    Show verbatim quote
    𝑅𝑒𝑑𝑢𝑐𝑒𝑑 𝑠𝑝𝑒𝑒𝑑 𝑙𝑜𝑠𝑠𝑒𝑠𝑠= 12,386 %
  14. Share of lost time: 24.7 % · as reported: “reduced speed losses”
    Show verbatim quote
    Analisis Six Big Losses mengidentifikasi bahwa total kerugian produksi mencapai 34,80%, dengan penyebab dominan berupa reduced speed losses sebesar 24,67%.
  15. Share of lost time: 51.1 % · as reported: “reduced speed losses”
    Show verbatim quote
    Kerugian terbesar berasal dari reduced speed losses sebesar 51,09% dan idling and minor stoppages sebesar 10,53%.
  16. Share of lost time: 6.90 % · as reported: “reduced speed losses”
    Show verbatim quote
    The Six Big Losses analysis indicates that the largest loss is reduced speed losses at 6.9%.