Included study
Determining Mocaf Production Quantity Using Sugeno's Fuzzy Model: Analyzing Slicing Machine Effectiveness and Raw Material Forecasting in SMEs
1Bibliographic record
- Authors
- Sesar Husen Santosa, Agung Prayudha Hidayat, Ridwan Siskandar Siskandar
- Year
- 2025
- Venue
- JURNAL TEKNIK INDUSTRI
- Country
- Indonesia
- Segment
- Fruit and vegetable processing
- Process family
- Milling, extraction and separation
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · 1 machines
- Observation period
- 84 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
The Mocaf flour SME has three machines in the production process: a cassava slicing machine, a smoothing machine, and a flour filtering machine.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—cassava slicing machineShow verbatim quote (Results section, after Table 3)Based on the results of the Availability, Performance, and Quality yield analysis, it was found that the OEE value of the cassava slicing machine was 0.71 (71%). | none | OEE | 71.0 % | Both extractors agreed |
—cassava slicing machineShow verbatim quote (Results section, Quality Yield calculation)Qy = 0,99 (99%) | none | Quality | 99.0 % | Both extractors agreed |
—cassava slicing machineShow verbatim quote (Results section, Availability calculation)Av = 0,91 (91%) | none | Availability | 91.0 % | Both extractors agreed |
—cassava slicing machineShow verbatim quote (Results section, Performance calculation)Pf = 0,78 (78 %) | none | Performance | 78.0 % | Both extractors agreed |
Planned Downtimecassava slicing machineShow verbatim quote (Table 1)Total 17507,14 2880 180,00 237 1,32 1,98 2700 2463 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 180 Minutes | Single extractor |
Unplanned Downtimecassava slicing machineShow verbatim quote (Table 1)Total 17507,14 2880 180,00 237 1,32 1,98 2700 2463 | Equipment failure (breakdowns) | Lost time | 237 Minutes | Single extractor |
—cassava slicing machineShow verbatim quote (Table 1, Page 5)Loading Time = Production Time – Planned Dt = 2880 – 180 = 2700 Minutes | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 180 min | Single extractor |
—cassava slicing machineShow verbatim quote (Page 6)Operating time decreased due to unplanned downtime of 237 minutes in 12 production periods. | Not classifiable from the report | Lost time | 237 min | Single extractor |
Observation units
- Cassava slicing machine · Cutting, slicing and deboning · Baseline

