foratvise
Get Started
Included study

Continuous Improvement Using the DMAIC Method to Reduce Technical Breakdown in a Conveyor Tilting Machine

Open source

1Bibliographic record

Authors
Andri Setio, Sunyoto, Sarbini
Year
2026
Venue
International Journal of Research and Innovation in Social Science
Country
Indonesia
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 2 lines · 1 machines
Observation period
365 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
PT. ABC is a packaged-beverage company located in Pasuruan, East Java, Indonesia, established in 2012, with Teh Pucuk Harum (TPH) as its flagship product and a production capacity of up to 90,000 boxes per day.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
top-chain derailment without detectiontop chain
Show verbatim quote (Section 4.3 Analyze / Figure 1)
top-chain derailment without detection was dominant, with five incidents (41.67% of frequency) and a loss contribution of 317 minutes, or 77.32% of total loss, far exceeding other types of failure.
Equipment failure (breakdowns)Share of lost time77.3 %Both extractors agreed
top-chain derailment without detectiontop chain
Show verbatim quote (Section 4.3 Analyze / Figure 1)
top-chain derailment without detection was dominant, with five incidents (41.67% of frequency) and a loss contribution of 317 minutes, or 77.32% of total loss, far exceeding other types of failure.
Equipment failure (breakdowns)Lost time317 minBoth extractors agreed
top-chain derailment without detectiontop chain
Show verbatim quote (Section 4.3 Analyze / Figure 1)
top-chain derailment without detection was dominant, with five incidents (41.67% of frequency) and a loss contribution of 317 minutes, or 77.32% of total loss, far exceeding other types of failure.
Equipment failure (breakdowns)Share of loss events41.7 %Both extractors agreed
—conveyor tilting machine
Show verbatim quote (Table 6)
Machine Availability 99.92% (8,753.17 ÷ 8,760) × 100%
noneAvailability99.9 %Both extractors agreed
—conveyor tilting machine
Show verbatim quote (Table 6)
MTTR 34.17 minutes/incident 410 min ÷ 12 incidents
Equipment failure (breakdowns)Mean event duration34.2 minutes/incidentAdjudicated
—conveyor tilting machine
Show verbatim quote (Section 4.5 Control)
Total production loss decreased by 93.41% (from 410 to 27 minutes), MTBF increased by 148.38%, MTTR decreased by 60.49%, and Machine Availability rose from 99.92% to 99.99%.
Equipment failure (breakdowns)Lost time27.0 minBoth extractors agreed
—conveyor tilting machine
Show verbatim quote (Section 4.5 Control)
MTBF = total uptime (3,623.55 hours) ÷ 2 incidents = 1,811.78 hours/failure; MTTR = 27 minutes ÷ 2 incidents = 13.5 minutes/incident; and Machine Availability = (3,623.55 ÷ 3,624) × 100% = 99.99%
Equipment failure (breakdowns)Mean event duration13.5 minutes/incidentAdjudicated
—conveyor tilting machine
Show verbatim quote (Section 4.5 Control)
MTBF = total uptime (3,623.55 hours) ÷ 2 incidents = 1,811.78 hours/failure; MTTR = 27 minutes ÷ 2 incidents = 13.5 minutes/incident; and Machine Availability = (3,623.55 ÷ 3,624) × 100% = 99.99%
noneAvailability100.0 %Both extractors agreed
—conveyor tilting machine
Show verbatim quote (Section 4.5 Control)
MTBF = total uptime (3,623.55 hours) ÷ 2 incidents = 1,811.78 hours/failure; MTTR = 27 minutes ÷ 2 incidents = 13.5 minutes/incident; and Machine Availability = (3,623.55 ÷ 3,624) × 100% = 99.99%
Equipment failure (breakdowns)Time between events1,812 hours/failureAdjudicated
—conveyor tilting machine
Show verbatim quote (Abstract)
resulting in a total production loss of 410 minutes across 12 incidents during January–December 2025, mainly caused by the absence of an automatic detection system for top-chain derailment.
Equipment failure (breakdowns)Lost time410 minSingle extractor
—conveyor tilting machine
Show verbatim quote (Table 6)
Number of TB incidents 12 incidents Historical data, Jan–Dec 2025
Equipment failure (breakdowns)Number of events12.0 incidentsSingle extractor
—conveyor tilting machine
Show verbatim quote (Table 6)
MTBF 729.43 hours/failure 8,753.17 ÷ 12 incidents
Equipment failure (breakdowns)Time between events729 hours/failureSingle extractor
Top-chain derailmenttop chain
Show verbatim quote (Table 5)
Top-chain derailment (13 min downtime, Shift 3) Detection response < 1 ms via proximity sensor
Equipment failure (breakdowns)Lost time13.0 minSingle extractor
Structural damage to support railsupport rail
Show verbatim quote (Table 5)
Structural damage to support rail (180 min loss) Downtime from structural damage < 30 minutes
Equipment failure (breakdowns)Lost time180 minSingle extractor
Tilting chain repairtilting chain
Show verbatim quote (Table 5)
Tilting chain repair (41 min MTTR) MTTR reduced through faster response time
Equipment failure (breakdowns)Mean event duration41.0 minSingle extractor
Guider-out tilting damageguider
Show verbatim quote (Table 5)
Guider-out tilting damage (29 min) Guider service life monitored via checklist
Equipment failure (breakdowns)Lost time29.0 minSingle extractor
Combined tilting & top-chain failure
Show verbatim quote (Table 5)
Combined tilting & top-chain failure (100 min) Total production loss reduced from the 410-min baseline
Equipment failure (breakdowns)Lost time100 minSingle extractor
—conveyor tilting machine
Show verbatim quote (Table 9)
Number of TB incidents 12 incidents 2 incidents ↓ 83.33%
Equipment failure (breakdowns)Number of events2.00 incidentsSingle extractor
—
Show verbatim quote (Section 4.1 Define)
far exceeding Line 1, which recorded only 132 minutes over the same period.
Equipment failure (breakdowns)Lost time132 minSingle extractor
—
Show verbatim quote (Abstract and Measure phase, page 6)
a DPMO of 83,333
noneDefect rate83,333 DPMOSingle extractor
—
Show verbatim quote (Abstract and Measure phase, page 6)
a Sigma Level of 2.88σ
noneQuality2.88 σSingle extractor
—
Show verbatim quote (Abstract and Measure phase, page 6)
a process capability index (Cp) of 0.96
noneQuality0.960 indexSingle extractor
—
Show verbatim quote (Abstract and Table 9, page 9)
DPMO 83,333 33,333 ↓ 60%
noneDefect rate33,333 DPMOSingle extractor
—
Show verbatim quote (Table 9, page 9)
Sigma Level 2.88 σ 3.33 σ ↑ 0.45 σ
noneQuality3.33 σSingle extractor
—
Show verbatim quote (Table 9, page 9)
Capability Index (Cp) 0.96 (poor) 1.11 (good) ↑ 0.15
noneQuality1.11 indexSingle extractor

Observation units

  • Line 2 tilting machine · Sterilization (retort, UHT) · Baseline
  • Line 2 tilting machine · Sterilization (retort, UHT) · After intervention
  • Line 1 · Whole line or unspecified equipment · Baseline
  • Line 2 Tilting Machine · Conveying and accumulation · Baseline
  • Line 2 Tilting Machine · Conveying and accumulation · After intervention