Aseptic carton filler subsystem failure
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 5 of the 120 studies that could observe it (limited evidence).
What happens
The aseptic carton filling machine integrates several interdependent subsystems, including the paper web feed and splicer, final folder, photocell web-position sensors, hydraulic unit, electrical control cabinet, hydrogen peroxide sterilization bath and nitrogen dosing circuit, and the longitudinal sealing strip applicator. Wear, contamination, misalignment or component degradation in any of these subsystems interrupts carton forming, sterilization or sealing, stopping the filler until a technician intervenes. Because the subsystems are mechanically and logically coupled, a fault in one often cascades into stoppages or quality excursions in the others.
What is done about it
Apply condition-based and preventive maintenance to each critical subsystem: periodic calibration of photocell sensors, inspection and timely splicing of the paper web, scheduled servicing of the hydraulic and electrical units, routine verification of peroxide bath concentration and nitrogen dosing, and adjustment or replacement of folder and sealing strip components before they drift out of tolerance. Maintain critical spare parts on hand and track fault codes by subsystem to prioritize reliability improvements where failures concentrate.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.7% [0.2–1.8%]
- Expected share of lost time
- 0.4% [0.1–1.0%]
- Share of lost time when present
- 57% [47–67%]
- Studies / units
- 120 / 162
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products0.8% [0.1–2.6%]18 studies
- Soft drinks, bottled water and juices1.2% [0.2–3.3%]44 studies
- Brewing, wine and spirits0.8% [0.1–2.6%]16 studies
- Bakery and pasta0.9% [0.1–3.3%]0 studies
- Meat, poultry and seafood0.9% [0.1–3.0%]6 studies
- Fruit and vegetable processing0.9% [0.1–3.1%]4 studies
- Grain and oilseed milling0.8% [0.1–2.9%]6 studies
- Sugar and confectionery0.9% [0.1–3.2%]3 studies
- Snacks, coffee, tea and other foods0.8% [0.1–2.8%]6 studies
- Animal feed and pet food0.9% [0.1–3.1%]4 studies
- Food manufacturing (unspecified or mixed)0.8% [0.1–3.0%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe aseptic carton filling machine integrates several interdependent subsystems, including the paper web feed and splicer, final folder, photocell web-position sensors, hydraulic unit, electrical control cabinet, hydrogen peroxide sterilization bath and nitrogen dosing circuit, and the longitudinal sealing strip applicator. Wear, contamination, misalignment or component degradation in any of these subsystems interrupts carton forming, sterilization or sealing, stopping the filler until a technician intervenes. Because the subsystems are mechanically and logically coupled, a fault in one often cascades into stoppages or quality excursions in the others.
How it looks in SCADA data
Engineering guidanceMES/SCADA logs show filler machine-state transitions to fault or stopped with alarm codes tagged to the specific subsystem (hydraulic pressure low, electrical trip, photocell blocked, paper splice detected, peroxide concentration out of range, nitrogen flow deviation, folder jam, strip misapplication). Stop counters accumulate against discrete fault categories rather than a single generic code, and downstream capping or packaging stations show starvation while the filler is in fault state.
Countermeasure
Engineering guidanceApply condition-based and preventive maintenance to each critical subsystem: periodic calibration of photocell sensors, inspection and timely splicing of the paper web, scheduled servicing of the hydraulic and electrical units, routine verification of peroxide bath concentration and nitrogen dosing, and adjustment or replacement of folder and sealing strip components before they drift out of tolerance. Maintain critical spare parts on hand and track fault codes by subsystem to prioritize reliability improvements where failures concentrate.
4Sources
- Lost time: 140 dk · as reported: “hazırlık zamanı”
Show verbatim quote
Örneğin; ürün 5’in dolumdaki toplam işlem süresi 528 dakika olup bunun 140 dakikasının hazırlık zamanı olarak kullanıldığı gözlemlenmiştir.
- Share of loss events: 67.0 % · as reported: “kolileme ve dolum makineleri”
Show verbatim quote
en çok iki arıza yaşanan ve toplam arızaların %67’sine sahip kolileme ve dolum makinelerine odaklanılmalıdır.
- Share of loss events: 70.0 % · as reported: “dolum ve kolileme makineleri”
Show verbatim quote
Hat 2’de ise benzer bir şekilde toplam arızaların %70’ine sahip dolum ve kolileme makineleri bakım ve iyileştirme faaliyetleri açısında öncelikli makinelerdir.
- Number of events: 97.0 events · as reported: “Son katlayıcı”
Show verbatim quote
DOLUM Son katlayıcı 97 DOLUM Son katlayıcı 97
- Number of events: 67.0 events · as reported: “Kağıt”
Show verbatim quote
Kağıt 67 Kağıt 68
- Number of events: 65.0 events · as reported: “Hidrolik”
Show verbatim quote
Hidrolik 65 Hidrolik 15
- Number of events: 41.0 events · as reported: “Fotosel”
Show verbatim quote
Fotosel 41 Fotosel 34
- Number of events: 13.0 events · as reported: “Strip”
Show verbatim quote
Strip 13 Strip 2
- Number of events: 8.00 events · as reported: “Servis ünitesi”
Show verbatim quote
Servis ünitesi 8 Servis ünitesi 13
- Number of events: 7.00 events · as reported: “Elektriksel”
Show verbatim quote
Elektriksel 7 Elektriksel 0
- Number of events: 4.00 events · as reported: “Azot”
Show verbatim quote
Azot 4 Azot 4
- Number of events: 2.00 events · as reported: “Peroksit”
Show verbatim quote
Peroksit 2 Peroksit 11
- Share of loss events: 75.0 % · as reported: “son katlayıcı, kağıt ve hidrolik arızaları”
Show verbatim quote
Hat 1’deki dolum makinesinde en çok son katlayıcı arızası yaşanmakta olup duruşların %75’i son katlayıcı, kağıt ve hidrolik arızalarından kaynaklandığı görülmektedir.
- Number of events: 97.0 events · as reported: “Son katlayıcı”
Show verbatim quote
DOLUM Son katlayıcı 97 DOLUM Son katlayıcı 97
- Number of events: 68.0 events · as reported: “Kağıt”
Show verbatim quote
Kağıt 67 Kağıt 68
- Number of events: 15.0 events · as reported: “Hidrolik”
Show verbatim quote
Hidrolik 65 Hidrolik 15
- Number of events: 34.0 events · as reported: “Fotosel”
Show verbatim quote
Fotosel 41 Fotosel 34
- Number of events: 2.00 events · as reported: “Strip”
Show verbatim quote
Strip 13 Strip 2
- Number of events: 13.0 events · as reported: “Servis ünitesi”
Show verbatim quote
Servis ünitesi 8 Servis ünitesi 13
- Number of events: 0 events · as reported: “Elektriksel”
Show verbatim quote
Elektriksel 7 Elektriksel 0
- Number of events: 4.00 events · as reported: “Azot”
Show verbatim quote
Azot 4 Azot 4
- Number of events: 11.0 events · as reported: “Peroksit”
Show verbatim quote
Peroksit 2 Peroksit 11
- Share of loss events: 82.0 % · as reported: “son katlayıcı, kağıt ve fotosel arızaları”
Show verbatim quote
Hat 2 dolum makinesinde ise en çok son katlayıcı arızası yaşanmakta olup duruşların % 82’si son katlayıcı, kağıt ve fotosel arızalarından kaynaklanmaktadır.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceLost time: 120,000 litre · as reported: “Dolum seviyesindeki değişkenlikler”
Show verbatim quote
İncelenen Pareto grafiği sonucunda 120.000 litrelik şurup kaybınınmevcut olan kayıpların %42.1 ini oluşturduğu ve bu kayıplara neden olan dolum seviyesi değişkenliklerinin incelenerek çözüm bulunabilmesi için ekip bu konunun detaylandırılmasına karar vermiştir.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceLost time: 75,000 litre · as reported: “Dolum prosesindeki uygunsuzluklar”
Show verbatim quote
İncelenen Pareto grafiği ile bulunan bu kök nedenin toplamda ortaya çıkan 75.000 litrelik bir kayıp miktarı ile mevcut kayıpların %26.3 ünü oluşturduğu belirlenmiştir.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceLost time: 195,000 litre · as reported: “Dolum esnasında yaşanan kayıplar”
Show verbatim quote
Yapılan analizler sonucunda ortaya çıkan 195.000 litrelik şurup kaybının bu proseste ki yaşanan mevcut kayıpların %68.4 ünü oluşturduğu ve dolum esnasında yaşanan sorunlardan kaynaklandığı çizilen pareto grafiği vasıtası ile ortaya konmuştur.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceShare of lost time: 68.4 % · as reported: “Dolum esnasında yaşanan kayıplar”
Show verbatim quote
...mevcut kayıpların %68.4 ünü oluşturduğu ve dolum esnasında yaşanan sorunlardan kaynaklandığı çizilen pareto grafiği vasıtası ile ortaya konmuştur.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceShare of lost time: 42.1 % · as reported: “Dolum seviyesindeki değişkenlikler”
Show verbatim quote
İncelenen Pareto grafiği sonucunda 120.000 litrelik şurup kaybınınmevcut olan kayıpların %42.1 ini oluşturduğu...
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceShare of lost time: 26.3 % · as reported: “Dolum prosesindeki uygunsuzluklar”
Show verbatim quote
İncelenen Pareto grafiği ile bulunan bu kök nedenin toplamda ortaya çıkan 75.000 litrelik bir kayıp miktarı ile mevcut kayıpların %26.3 ünü oluşturduğu belirlenmiştir.
- An Example Application On Comparison Of Six Sigma And Kaizen From Total Quality Managment Techniquies (2018)Open sourceLost time: 50,000 litre · as reported: “Dolum seviyesindeki değişkenlikler”
Show verbatim quote
Dolum seviyesinde yapılan iyileştirmeler sonucunda bir yıllık süre içersinde dolum seviyesindeki değişkenliklere bağlı olarak oluşan kayıplardan 50.000 litrelik şurup kaybı engellenmesi sağlanmıştır.

