Boiler breakdown
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 58 % of the line's lost time. Reported by 2 of the 131 studies that could observe it (limited evidence).
What happens
A mechanical, electrical, control or combustion-related fault in the boiler (burner, pump, valve, sensor, refractory or pressure vessel component) causes loss of steam or hot water generation, forcing the unit offline until repaired. Because steam or hot utility supply is shared across the plant, the fault propagates into stoppages of dependent process equipment.
What is done about it
Apply preventive and condition-based maintenance to burner, pumps, valves, water treatment and pressure components, with redundancy or a standby boiler for critical loads. Use trend monitoring of combustion efficiency, water chemistry and vibration to detect degradation before failure and plan interventions during scheduled downtime.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.8% [0.2–1.9%]
- Expected share of lost time
- 0.4% [0.1–1.1%]
- Share of lost time when present
- 58% [48–69%]
- Studies / units
- 131 / 165
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products0.8% [0.1–2.8%]13 studies
- Soft drinks, bottled water and juices0.7% [0.1–2.2%]26 studies
- Brewing, wine and spirits0.9% [0.1–2.9%]12 studies
- Bakery and pasta1.1% [0.2–3.4%]25 studies
- Meat, poultry and seafood0.9% [0.1–2.9%]9 studies
- Fruit and vegetable processing0.9% [0.1–3.0%]7 studies
- Grain and oilseed milling1.3% [0.2–4.3%]7 studies
- Sugar and confectionery0.9% [0.1–2.9%]9 studies
- Snacks, coffee, tea and other foods0.8% [0.1–2.8%]5 studies
- Animal feed and pet food0.9% [0.1–3.1%]7 studies
- Food manufacturing (unspecified or mixed)0.9% [0.1–3.0%]11 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceA mechanical, electrical, control or combustion-related fault in the boiler (burner, pump, valve, sensor, refractory or pressure vessel component) causes loss of steam or hot water generation, forcing the unit offline until repaired. Because steam or hot utility supply is shared across the plant, the fault propagates into stoppages of dependent process equipment.
How it looks in SCADA data
Engineering guidanceSCADA shows the boiler state transitioning to fault or stopped with an associated alarm (low water level, flame failure, high pressure trip, pump or fan fault), followed by a drop in steam pressure or flow trend across the utility header. Downstream machines register starvation or forced idle states correlated in time with the boiler fault.
Countermeasure
Engineering guidanceApply preventive and condition-based maintenance to burner, pumps, valves, water treatment and pressure components, with redundancy or a standby boiler for critical loads. Use trend monitoring of combustion efficiency, water chemistry and vibration to detect degradation before failure and plan interventions during scheduled downtime.
4Sources
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 1.63 Hours/month · as reported: “Set Up”
Show verbatim quote
so if we calculate the total set up time in a year we can see the average time of the Sei Mangkei PKS do Set Up per month that is 19.5 / 12 = 1.625 Hours / month.
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceShare of lost time: 9.17 % · as reported: “breakdown”
Show verbatim quote
From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceShare of lost time: 5.68 % · as reported: “Equipment Failures”
Show verbatim quote
After we engineer the calculation of Equipment Failures, we can see that the difference between the real average value of Equipment Failures and the engineering value is 5.675 % - 2.22%, which is 3.455 %.
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 19.5 Hour · as reported: “Set Up”
Show verbatim quote
Total 19.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 18.0 Hour · as reported: “Machine Break”
Show verbatim quote
January 2017 18.0 2.0 20.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 2.00 Hour · as reported: “Non-Productive”
Show verbatim quote
January 2017 18.0 2.0 20.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 20.0 Hour · as reported: “Total Breakdown”
Show verbatim quote
January 2017 18.0 2.0 20.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 42.0 Hour · as reported: “Machine Break”
Show verbatim quote
February 2017 42.0 1.5 43.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 1.50 Hour · as reported: “Non-Productive”
Show verbatim quote
February 2017 42.0 1.5 43.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 43.5 Hour · as reported: “Total Breakdown”
Show verbatim quote
February 2017 42.0 1.5 43.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 19.5 Hour · as reported: “Total Breakdown”
Show verbatim quote
March 2017 18.0 1.5 19.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 37.5 Hour · as reported: “Machine Break”
Show verbatim quote
April 2017 37.5 3.0 40.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 3.00 Hour · as reported: “Non-Productive”
Show verbatim quote
April 2017 37.5 3.0 40.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 40.5 Hour · as reported: “Total Breakdown”
Show verbatim quote
April 2017 37.5 3.0 40.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 27.0 Hour · as reported: “Machine Break”
Show verbatim quote
May 2017 27.0 1.0 28.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 1.00 Hour · as reported: “Non-Productive”
Show verbatim quote
May 2017 27.0 1.0 28.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 28.0 Hour · as reported: “Total Breakdown”
Show verbatim quote
May 2017 27.0 1.0 28.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 15.0 Hour · as reported: “Machine Break”
Show verbatim quote
June 2017 15.0 1.5 16.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 16.5 Hour · as reported: “Total Breakdown”
Show verbatim quote
June 2017 15.0 1.5 16.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 40.0 Hour · as reported: “Machine Break”
Show verbatim quote
July 2017 40.0 2.5 42.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 2.50 Hour · as reported: “Non-Productive”
Show verbatim quote
July 2017 40.0 2.5 42.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 42.5 Hour · as reported: “Total Breakdown”
Show verbatim quote
July 2017 40.0 2.5 42.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 16.5 Hour · as reported: “Machine Break”
Show verbatim quote
August 2017 16.5 1.0 17.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 17.5 Hour · as reported: “Total Breakdown”
Show verbatim quote
August 2017 16.5 1.0 17.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 13.0 Hour · as reported: “Machine Break”
Show verbatim quote
September 2017 13.0 1.0 14.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 14.0 Hour · as reported: “Total Breakdown”
Show verbatim quote
September 2017 13.0 1.0 14.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 20.0 Hour · as reported: “Machine Break”
Show verbatim quote
October 2017 20.0 3.5 23.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 3.50 Hour · as reported: “Non-Productive”
Show verbatim quote
October 2017 20.0 3.5 23.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 23.5 Hour · as reported: “Total Breakdown”
Show verbatim quote
October 2017 20.0 3.5 23.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 36.0 Hour · as reported: “Machine Break”
Show verbatim quote
November 2017 36.0 1.5 37.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 37.5 Hour · as reported: “Total Breakdown”
Show verbatim quote
November 2017 36.0 1.5 37.5
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 21.0 Hour · as reported: “Machine Break”
Show verbatim quote
December 2017 21.0 2.0 23.0
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceLost time: 23.0 Hour · as reported: “Total Breakdown”
Show verbatim quote
December 2017 21.0 2.0 23.0
- Analyisis Of Boiler Reliability Maintenance System With Availability Ratio At PT. XXX (2024)Open sourceShare of planned time: 11.0 % · as reported: “kegagalan”
Show verbatim quote
Sistem boiler secara keseluruhan masih ada kemungkinan kegagalan sebesar 11%.