Equipment failure (breakdowns)

Boiler breakdown

Equipment failure (breakdowns)AvailabilityUtilities (steam, compressed air, chilled water, power)

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 2 of the 131 studies that could observe it (limited evidence).

What happens

A mechanical, electrical, control or combustion-related fault in the boiler (burner, pump, valve, sensor, refractory or pressure vessel component) causes loss of steam or hot water generation, forcing the unit offline until repaired. Because steam or hot utility supply is shared across the plant, the fault propagates into stoppages of dependent process equipment.

What is done about it

Apply preventive and condition-based maintenance to burner, pumps, valves, water treatment and pressure components, with redundancy or a standby boiler for critical loads. Use trend monitoring of combustion efficiency, water chemistry and vibration to detect degradation before failure and plan interventions during scheduled downtime.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.2–1.9%]
Expected share of lost time
0.4% [0.1–1.1%]
Share of lost time when present
58% [48–69%]
Studies / units
131 / 165
Evidence grade
C

Grade C: 2 to 4 studies, or an interval wider than 0.35.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.8% [0.1–2.8%]13 studies
  • Soft drinks, bottled water and juices
    0.7% [0.1–2.2%]26 studies
  • Brewing, wine and spirits
    0.9% [0.1–2.9%]12 studies
  • Bakery and pasta
    1.1% [0.2–3.4%]25 studies
  • Meat, poultry and seafood
    0.9% [0.1–2.9%]9 studies
  • Fruit and vegetable processing
    0.9% [0.1–3.0%]7 studies
  • Grain and oilseed milling
    1.3% [0.2–4.3%]7 studies
  • Sugar and confectionery
    0.9% [0.1–2.9%]9 studies
  • Snacks, coffee, tea and other foods
    0.8% [0.1–2.8%]5 studies
  • Animal feed and pet food
    0.9% [0.1–3.1%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.9% [0.1–3.0%]11 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

A mechanical, electrical, control or combustion-related fault in the boiler (burner, pump, valve, sensor, refractory or pressure vessel component) causes loss of steam or hot water generation, forcing the unit offline until repaired. Because steam or hot utility supply is shared across the plant, the fault propagates into stoppages of dependent process equipment.

How it looks in SCADA data

Engineering guidance

SCADA shows the boiler state transitioning to fault or stopped with an associated alarm (low water level, flame failure, high pressure trip, pump or fan fault), followed by a drop in steam pressure or flow trend across the utility header. Downstream machines register starvation or forced idle states correlated in time with the boiler fault.

Countermeasure

Engineering guidance

Apply preventive and condition-based maintenance to burner, pumps, valves, water treatment and pressure components, with redundancy or a standby boiler for critical loads. Use trend monitoring of combustion efficiency, water chemistry and vibration to detect degradation before failure and plan interventions during scheduled downtime.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 1.63 Hours/month · as reported: “Set Up”
    Show verbatim quote
    so if we calculate the total set up time in a year we can see the average time of the Sei Mangkei PKS do Set Up per month that is 19.5 / 12 = 1.625 Hours / month.
  2. Share of lost time: 9.17 % · as reported: “breakdown”
    Show verbatim quote
    From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.
  3. Share of lost time: 5.68 % · as reported: “Equipment Failures”
    Show verbatim quote
    After we engineer the calculation of Equipment Failures, we can see that the difference between the real average value of Equipment Failures and the engineering value is 5.675 % - 2.22%, which is 3.455 %.
  4. Lost time: 19.5 Hour · as reported: “Set Up”
    Show verbatim quote
    Total 19.5
  5. Lost time: 18.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    January 2017 18.0 2.0 20.0
  6. Lost time: 2.00 Hour · as reported: “Non-Productive”
    Show verbatim quote
    January 2017 18.0 2.0 20.0
  7. Lost time: 20.0 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    January 2017 18.0 2.0 20.0
  8. Lost time: 42.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    February 2017 42.0 1.5 43.5
  9. Lost time: 1.50 Hour · as reported: “Non-Productive”
    Show verbatim quote
    February 2017 42.0 1.5 43.5
  10. Lost time: 43.5 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    February 2017 42.0 1.5 43.5
  11. Lost time: 19.5 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    March 2017 18.0 1.5 19.5
  12. Lost time: 37.5 Hour · as reported: “Machine Break”
    Show verbatim quote
    April 2017 37.5 3.0 40.5
  13. Lost time: 3.00 Hour · as reported: “Non-Productive”
    Show verbatim quote
    April 2017 37.5 3.0 40.5
  14. Lost time: 40.5 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    April 2017 37.5 3.0 40.5
  15. Lost time: 27.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    May 2017 27.0 1.0 28.0
  16. Lost time: 1.00 Hour · as reported: “Non-Productive”
    Show verbatim quote
    May 2017 27.0 1.0 28.0
  17. Lost time: 28.0 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    May 2017 27.0 1.0 28.0
  18. Lost time: 15.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    June 2017 15.0 1.5 16.5
  19. Lost time: 16.5 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    June 2017 15.0 1.5 16.5
  20. Lost time: 40.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    July 2017 40.0 2.5 42.5
  21. Lost time: 2.50 Hour · as reported: “Non-Productive”
    Show verbatim quote
    July 2017 40.0 2.5 42.5
  22. Lost time: 42.5 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    July 2017 40.0 2.5 42.5
  23. Lost time: 16.5 Hour · as reported: “Machine Break”
    Show verbatim quote
    August 2017 16.5 1.0 17.5
  24. Lost time: 17.5 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    August 2017 16.5 1.0 17.5
  25. Lost time: 13.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    September 2017 13.0 1.0 14.0
  26. Lost time: 14.0 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    September 2017 13.0 1.0 14.0
  27. Lost time: 20.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    October 2017 20.0 3.5 23.5
  28. Lost time: 3.50 Hour · as reported: “Non-Productive”
    Show verbatim quote
    October 2017 20.0 3.5 23.5
  29. Lost time: 23.5 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    October 2017 20.0 3.5 23.5
  30. Lost time: 36.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    November 2017 36.0 1.5 37.5
  31. Lost time: 37.5 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    November 2017 36.0 1.5 37.5
  32. Lost time: 21.0 Hour · as reported: “Machine Break”
    Show verbatim quote
    December 2017 21.0 2.0 23.0
  33. Lost time: 23.0 Hour · as reported: “Total Breakdown”
    Show verbatim quote
    December 2017 21.0 2.0 23.0
  34. Share of planned time: 11.0 % · as reported: “kegagalan”
    Show verbatim quote
    Sistem boiler secara keseluruhan masih ada kemungkinan kegagalan sebesar 11%.