Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei
1Bibliographic record
- Authors
- Sihombing, Alfrieldo Josua
- Year
- 2022
- Venue
- Journal Basic Science and Technology
- DOI
- —
- Country
- Indonesia
- Segment
- Grain and oilseed milling
- Process family
- Slaughter, cutting and primary processing
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 365 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
Boilers have a very important role in the continuity of the performance of a palm oil mill, in other words, it can be said as the heart of a palm oil mill.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—BoilerShow verbatim quote (Conclusion)During the January-December 2017 period, the average Overall Equipment Effectiveness (OEE) at Sei Mangkei PKS was 39.08 % where the OEE value was far from the predetermined standard value of 85 % (according to JIPM world class benchmark standards). | none | OEE | 39.1 % | Both extractors agreed |
Set UpBoilerShow verbatim quote (Section 3.1.b)so if we calculate the total set up time in a year we can see the average time of the Sei Mangkei PKS do Set Up per month that is 19.5 / 12 = 1.625 Hours / month. | Setup and adjustments | Lost time | 1.63 Hours/month | Both extractors agreed |
rework lossesBoilerShow verbatim quote (Conclusion)From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%. | Process defects (scrap and rework) | Share of lost time | 0 % | Both extractors agreed |
scrap/yield lossesBoilerShow verbatim quote (Conclusion)From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%. | Start-up losses (reduced yield) | Share of lost time | 10.5 % | Adjudicated |
setup and adjustmentBoilerShow verbatim quote (Conclusion)From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%. | Setup and adjustments | Share of lost time | 0.670 % | Both extractors agreed |
idling minor stoppagesBoilerShow verbatim quote (Conclusion)From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%. | Idling and minor stops (micro-stops) | Share of lost time | 0.620 % | Both extractors agreed |
breakdownBoilerShow verbatim quote (Conclusion)From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%. | Equipment failure (breakdowns) | Share of lost time | 9.17 % | Both extractors agreed |
reduced speed lossesBoilerShow verbatim quote (Conclusion)From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%. | Reduced speed | Share of lost time | 79.0 % | Both extractors agreed |
Equipment FailuresBoilerShow verbatim quote (Section 3.3.b)After we engineer the calculation of Equipment Failures, we can see that the difference between the real average value of Equipment Failures and the engineering value is 5.675 % - 2.22%, which is 3.455 %. | Equipment failure (breakdowns) | Share of lost time | 5.68 % | Single extractor |
Set UpBoilerShow verbatim quote (Table 4)Total 19.5 | Setup and adjustments | Lost time | 19.5 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)January 2017 18.0 2.0 20.0 | Equipment failure (breakdowns) | Lost time | 18.0 Hour | Single extractor |
Non-ProductiveBoilerShow verbatim quote (Table 2)January 2017 18.0 2.0 20.0 | Idling and minor stops (micro-stops) | Lost time | 2.00 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)January 2017 18.0 2.0 20.0 | Equipment failure (breakdowns) | Lost time | 20.0 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)February 2017 42.0 1.5 43.5 | Equipment failure (breakdowns) | Lost time | 42.0 Hour | Single extractor |
Non-ProductiveBoilerShow verbatim quote (Table 2)February 2017 42.0 1.5 43.5 | Idling and minor stops (micro-stops) | Lost time | 1.50 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)February 2017 42.0 1.5 43.5 | Equipment failure (breakdowns) | Lost time | 43.5 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)March 2017 18.0 1.5 19.5 | Equipment failure (breakdowns) | Lost time | 19.5 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)April 2017 37.5 3.0 40.5 | Equipment failure (breakdowns) | Lost time | 37.5 Hour | Single extractor |
Non-ProductiveBoilerShow verbatim quote (Table 2)April 2017 37.5 3.0 40.5 | Idling and minor stops (micro-stops) | Lost time | 3.00 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)April 2017 37.5 3.0 40.5 | Equipment failure (breakdowns) | Lost time | 40.5 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)May 2017 27.0 1.0 28.0 | Equipment failure (breakdowns) | Lost time | 27.0 Hour | Single extractor |
Non-ProductiveBoilerShow verbatim quote (Table 2)May 2017 27.0 1.0 28.0 | Idling and minor stops (micro-stops) | Lost time | 1.00 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)May 2017 27.0 1.0 28.0 | Equipment failure (breakdowns) | Lost time | 28.0 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)June 2017 15.0 1.5 16.5 | Equipment failure (breakdowns) | Lost time | 15.0 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)June 2017 15.0 1.5 16.5 | Equipment failure (breakdowns) | Lost time | 16.5 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)July 2017 40.0 2.5 42.5 | Equipment failure (breakdowns) | Lost time | 40.0 Hour | Single extractor |
Non-ProductiveBoilerShow verbatim quote (Table 2)July 2017 40.0 2.5 42.5 | Idling and minor stops (micro-stops) | Lost time | 2.50 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)July 2017 40.0 2.5 42.5 | Equipment failure (breakdowns) | Lost time | 42.5 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)August 2017 16.5 1.0 17.5 | Equipment failure (breakdowns) | Lost time | 16.5 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)August 2017 16.5 1.0 17.5 | Equipment failure (breakdowns) | Lost time | 17.5 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)September 2017 13.0 1.0 14.0 | Equipment failure (breakdowns) | Lost time | 13.0 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)September 2017 13.0 1.0 14.0 | Equipment failure (breakdowns) | Lost time | 14.0 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)October 2017 20.0 3.5 23.5 | Equipment failure (breakdowns) | Lost time | 20.0 Hour | Single extractor |
Non-ProductiveBoilerShow verbatim quote (Table 2)October 2017 20.0 3.5 23.5 | Idling and minor stops (micro-stops) | Lost time | 3.50 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)October 2017 20.0 3.5 23.5 | Equipment failure (breakdowns) | Lost time | 23.5 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)November 2017 36.0 1.5 37.5 | Equipment failure (breakdowns) | Lost time | 36.0 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)November 2017 36.0 1.5 37.5 | Equipment failure (breakdowns) | Lost time | 37.5 Hour | Single extractor |
Machine BreakBoilerShow verbatim quote (Table 2)December 2017 21.0 2.0 23.0 | Equipment failure (breakdowns) | Lost time | 21.0 Hour | Single extractor |
Total BreakdownBoilerShow verbatim quote (Table 2)December 2017 21.0 2.0 23.0 | Equipment failure (breakdowns) | Lost time | 23.0 Hour | Single extractor |
Observation units
- Boiler Line I · Utilities (steam, compressed air, chilled water, power) · Baseline