foratvise
Get Started
Included study

Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei

Open source

1Bibliographic record

Authors
Sihombing, Alfrieldo Josua
Year
2022
Venue
Journal Basic Science and Technology
DOI
—
Country
Indonesia
Segment
Grain and oilseed milling
Process family
Slaughter, cutting and primary processing
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
365 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
Boilers have a very important role in the continuity of the performance of a palm oil mill, in other words, it can be said as the heart of a palm oil mill.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Boiler
Show verbatim quote (Conclusion)
During the January-December 2017 period, the average Overall Equipment Effectiveness (OEE) at Sei Mangkei PKS was 39.08 % where the OEE value was far from the predetermined standard value of 85 % (according to JIPM world class benchmark standards).
noneOEE39.1 %Both extractors agreed
Set UpBoiler
Show verbatim quote (Section 3.1.b)
so if we calculate the total set up time in a year we can see the average time of the Sei Mangkei PKS do Set Up per month that is 19.5 / 12 = 1.625 Hours / month.
Setup and adjustmentsLost time1.63 Hours/monthBoth extractors agreed
rework lossesBoiler
Show verbatim quote (Conclusion)
From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.
Process defects (scrap and rework)Share of lost time0 %Both extractors agreed
scrap/yield lossesBoiler
Show verbatim quote (Conclusion)
From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.
Start-up losses (reduced yield)Share of lost time10.5 %Adjudicated
setup and adjustmentBoiler
Show verbatim quote (Conclusion)
From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.
Setup and adjustmentsShare of lost time0.670 %Both extractors agreed
idling minor stoppagesBoiler
Show verbatim quote (Conclusion)
From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.
Idling and minor stops (micro-stops)Share of lost time0.620 %Both extractors agreed
breakdownBoiler
Show verbatim quote (Conclusion)
From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.
Equipment failure (breakdowns)Share of lost time9.17 %Both extractors agreed
reduced speed lossesBoiler
Show verbatim quote (Conclusion)
From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.
Reduced speedShare of lost time79.0 %Both extractors agreed
Equipment FailuresBoiler
Show verbatim quote (Section 3.3.b)
After we engineer the calculation of Equipment Failures, we can see that the difference between the real average value of Equipment Failures and the engineering value is 5.675 % - 2.22%, which is 3.455 %.
Equipment failure (breakdowns)Share of lost time5.68 %Single extractor
Set UpBoiler
Show verbatim quote (Table 4)
Total 19.5
Setup and adjustmentsLost time19.5 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
January 2017 18.0 2.0 20.0
Equipment failure (breakdowns)Lost time18.0 HourSingle extractor
Non-ProductiveBoiler
Show verbatim quote (Table 2)
January 2017 18.0 2.0 20.0
Idling and minor stops (micro-stops)Lost time2.00 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
January 2017 18.0 2.0 20.0
Equipment failure (breakdowns)Lost time20.0 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
February 2017 42.0 1.5 43.5
Equipment failure (breakdowns)Lost time42.0 HourSingle extractor
Non-ProductiveBoiler
Show verbatim quote (Table 2)
February 2017 42.0 1.5 43.5
Idling and minor stops (micro-stops)Lost time1.50 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
February 2017 42.0 1.5 43.5
Equipment failure (breakdowns)Lost time43.5 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
March 2017 18.0 1.5 19.5
Equipment failure (breakdowns)Lost time19.5 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
April 2017 37.5 3.0 40.5
Equipment failure (breakdowns)Lost time37.5 HourSingle extractor
Non-ProductiveBoiler
Show verbatim quote (Table 2)
April 2017 37.5 3.0 40.5
Idling and minor stops (micro-stops)Lost time3.00 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
April 2017 37.5 3.0 40.5
Equipment failure (breakdowns)Lost time40.5 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
May 2017 27.0 1.0 28.0
Equipment failure (breakdowns)Lost time27.0 HourSingle extractor
Non-ProductiveBoiler
Show verbatim quote (Table 2)
May 2017 27.0 1.0 28.0
Idling and minor stops (micro-stops)Lost time1.00 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
May 2017 27.0 1.0 28.0
Equipment failure (breakdowns)Lost time28.0 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
June 2017 15.0 1.5 16.5
Equipment failure (breakdowns)Lost time15.0 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
June 2017 15.0 1.5 16.5
Equipment failure (breakdowns)Lost time16.5 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
July 2017 40.0 2.5 42.5
Equipment failure (breakdowns)Lost time40.0 HourSingle extractor
Non-ProductiveBoiler
Show verbatim quote (Table 2)
July 2017 40.0 2.5 42.5
Idling and minor stops (micro-stops)Lost time2.50 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
July 2017 40.0 2.5 42.5
Equipment failure (breakdowns)Lost time42.5 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
August 2017 16.5 1.0 17.5
Equipment failure (breakdowns)Lost time16.5 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
August 2017 16.5 1.0 17.5
Equipment failure (breakdowns)Lost time17.5 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
September 2017 13.0 1.0 14.0
Equipment failure (breakdowns)Lost time13.0 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
September 2017 13.0 1.0 14.0
Equipment failure (breakdowns)Lost time14.0 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
October 2017 20.0 3.5 23.5
Equipment failure (breakdowns)Lost time20.0 HourSingle extractor
Non-ProductiveBoiler
Show verbatim quote (Table 2)
October 2017 20.0 3.5 23.5
Idling and minor stops (micro-stops)Lost time3.50 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
October 2017 20.0 3.5 23.5
Equipment failure (breakdowns)Lost time23.5 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
November 2017 36.0 1.5 37.5
Equipment failure (breakdowns)Lost time36.0 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
November 2017 36.0 1.5 37.5
Equipment failure (breakdowns)Lost time37.5 HourSingle extractor
Machine BreakBoiler
Show verbatim quote (Table 2)
December 2017 21.0 2.0 23.0
Equipment failure (breakdowns)Lost time21.0 HourSingle extractor
Total BreakdownBoiler
Show verbatim quote (Table 2)
December 2017 21.0 2.0 23.0
Equipment failure (breakdowns)Lost time23.0 HourSingle extractor

Observation units

  • Boiler Line I · Utilities (steam, compressed air, chilled water, power) · Baseline