When it appears, it takes on average about 56 % of the line's lost time. Reported by 0 of the 131 studies that could observe it (sparse evidence).
What happens
Time is lost while the boiler is taken offline and reconfigured or retuned between operating modes, fuel sources or pressure/temperature setpoints, including the warm-up needed to restore stable steam supply. No single component fails; the loss is the planned sequence of valve, burner and control adjustments required to reach target steam conditions.
What is done about it
Standardize boiler start-up and mode-change procedures with predefined setpoint ramps, use parallel or standby boiler capacity to cover the transition, and apply checklists or automated sequencing to shorten adjustment time between operating conditions.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.3% [0.1–0.9%]
- Expected share of lost time
- 0.2% [0.0–0.5%]
- Share of lost time when present
- 56% [43–66%]
- Studies / units
- 131 / 165
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.4%]13 studies
- Soft drinks, bottled water and juices0.3% [0.0–1.3%]26 studies
- Brewing, wine and spirits0.4% [0.0–1.5%]12 studies
- Bakery and pasta0.4% [0.0–1.4%]25 studies
- Meat, poultry and seafood0.4% [0.0–1.6%]9 studies
- Fruit and vegetable processing0.4% [0.0–1.5%]7 studies
- Grain and oilseed milling0.4% [0.0–1.5%]7 studies
- Sugar and confectionery0.4% [0.0–1.4%]9 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.5%]5 studies
- Animal feed and pet food0.4% [0.0–1.6%]7 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.5%]11 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceTime is lost while the boiler is taken offline and reconfigured or retuned between operating modes, fuel sources or pressure/temperature setpoints, including the warm-up needed to restore stable steam supply. No single component fails; the loss is the planned sequence of valve, burner and control adjustments required to reach target steam conditions.
How it looks in SCADA data
Engineering guidanceSCADA shows an extended boiler state transition or standby-to-run ramp with steam pressure and temperature trending toward setpoint, burner modulation and feedwater flow changing stepwise, and downstream steam-consuming operations recording starvation or reduced throughput during the ramp.
Countermeasure
Engineering guidanceStandardize boiler start-up and mode-change procedures with predefined setpoint ramps, use parallel or standby boiler capacity to cover the transition, and apply checklists or automated sequencing to shorten adjustment time between operating conditions.
4Sources
- Productivity Analysis And Engineering Of Oil Palm Factory Productivity Process On Boiler Work Effectiveness At PTPN III PKS Sei Mangkei (2022)Open sourceShare of lost time: 0.670 % · as reported: “setup and adjustment”
Show verbatim quote
From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.