foratvise
Get Started
Start-up losses (reduced yield)

Boiler startup warm-up yield loss

Start-up losses (reduced yield)QualityUtilities (steam, compressed air, chilled water, power)

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 48 % of the line's lost time. Reported by 1 of the 131 studies that could observe it (sparse evidence).

What happens

When the boiler is started after a shutdown or stop, it must ramp up pressure and temperature before it can deliver steam of the quality and stability needed by downstream processes; during this warm-up phase feedwater, condensate and initial steam are blown down, vented or diverted because they do not meet the required specification. The resulting loss of water, energy and, indirectly, product output is charged to the startup period rather than to stable production.

What is done about it

Standardize and optimize the startup sequence with staged pre-heating and ramp rates, use thermal storage or accumulators to buffer demand during warm-up, improve feedwater conditioning to shorten the out-of-spec period, and schedule starts to minimize the number of cold startups per shift or campaign.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.5% [0.1–1.3%]
Expected share of lost time
0.2% [0.0–0.7%]
Share of lost time when present
48% [29–66%]
Studies / units
131 / 165
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.5% [0.1–2.1%]13 studies
  • Soft drinks, bottled water and juices
    0.5% [0.0–1.7%]26 studies
  • Brewing, wine and spirits
    0.5% [0.0–2.0%]12 studies
  • Bakery and pasta
    0.5% [0.0–1.8%]25 studies
  • Meat, poultry and seafood
    0.5% [0.0–2.0%]9 studies
  • Fruit and vegetable processing
    0.6% [0.0–2.2%]7 studies
  • Grain and oilseed milling
    0.8% [0.1–3.2%]7 studies
  • Sugar and confectionery
    0.5% [0.0–2.0%]9 studies
  • Snacks, coffee, tea and other foods
    0.5% [0.0–2.2%]5 studies
  • Animal feed and pet food
    0.5% [0.1–2.1%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.5% [0.0–2.1%]11 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

When the boiler is started after a shutdown or stop, it must ramp up pressure and temperature before it can deliver steam of the quality and stability needed by downstream processes; during this warm-up phase feedwater, condensate and initial steam are blown down, vented or diverted because they do not meet the required specification. The resulting loss of water, energy and, indirectly, product output is charged to the startup period rather than to stable production.

How it looks in SCADA data

Engineering guidance

SCADA/MES trends show a startup ramp in boiler pressure and temperature signals, extended blowdown or vent valve open times, steam quality or conductivity readings outside normal band until stabilization, a dedicated startup-state timer, and downstream equipment held in standby or starved state while waiting for steam availability.

Countermeasure

Engineering guidance

Standardize and optimize the startup sequence with staged pre-heating and ramp rates, use thermal storage or accumulators to buffer demand during warm-up, improve feedwater conditioning to shorten the out-of-spec period, and schedule starts to minimize the number of cold startups per shift or campaign.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 10.5 % · as reported: “scrap/yield losses”
    Show verbatim quote
    From the analysis of the six big losses, it is known that the causes of the low OEE value are reduced speed losses by 79.01%, breakdown by 9.17%, idling minor stoppages 0.62%, setup and adjustment 0.67%, scrap/yield losses 10.51% and rework losses 0%.