In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 0 of the 120 studies that could observe it (sparse evidence).

What happens

When the buffer or bright tank feeding the filler runs low or empty, the line must switch supply to a full tank; this requires closing and opening valves, re-priming lines, verifying product quality or carbonation, and stabilizing flow before filling can resume. The manual coordination between tank cellar and filling line, plus any required flushing or CIP of transfer lines, extends the time between the last good bottle on the old tank and the first good bottle on the new one.

What is done about it

Schedule tank changeovers proactively based on level trending so the switch occurs during a planned pause, automate the valve sequencing and line priming to reduce manual steps, and maintain adequate buffer capacity or a parallel tank so the filler can continue running from an alternate source while the depleted tank is refilled.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.3% [0.1–1.0%]
Expected share of lost time
0.2% [0.0–0.6%]
Share of lost time when present
56% [44–67%]
Studies / units
120 / 162
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.4% [0.0–1.4%]18 studies
  • Soft drinks, bottled water and juices
    0.3% [0.0–1.1%]44 studies
  • Brewing, wine and spirits
    0.4% [0.0–1.5%]16 studies
  • Bakery and pasta
    0.4% [0.0–1.5%]0 studies
  • Meat, poultry and seafood
    0.4% [0.0–1.5%]6 studies
  • Fruit and vegetable processing
    0.4% [0.0–1.5%]4 studies
  • Grain and oilseed milling
    0.4% [0.0–1.5%]6 studies
  • Sugar and confectionery
    0.4% [0.0–1.6%]3 studies
  • Snacks, coffee, tea and other foods
    0.4% [0.0–1.5%]6 studies
  • Animal feed and pet food
    0.4% [0.0–1.5%]4 studies
  • Food manufacturing (unspecified or mixed)
    0.4% [0.0–1.5%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

When the buffer or bright tank feeding the filler runs low or empty, the line must switch supply to a full tank; this requires closing and opening valves, re-priming lines, verifying product quality or carbonation, and stabilizing flow before filling can resume. The manual coordination between tank cellar and filling line, plus any required flushing or CIP of transfer lines, extends the time between the last good bottle on the old tank and the first good bottle on the new one.

How it looks in SCADA data

Engineering guidance

Filler state log shows a changeover or standby state aligned with tank-level alarms (low level on the depleting BBT) and valve position changes on the supply manifold; filler speed drops to zero while upstream tank transfer or CIP cycle is logged, with the filler remaining idle until flow and pressure signals stabilize.

Countermeasure

Engineering guidance

Schedule tank changeovers proactively based on level trending so the switch occurs during a planned pause, automate the valve sequencing and line priming to reduce manual steps, and maintain adequate buffer capacity or a parallel tank so the filler can continue running from an alternate source while the depleted tank is refilled.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 8.00 min · as reported: “BBT change over delay”
    Show verbatim quote
    BBT change over delay 3 0 5 0 0 0 8 0.55
  2. Share of lost time: 0.550 % · as reported: “BBT change over delay”
    Show verbatim quote
    BBT change over delay 3 0 5 0 0 0 8 0.55