Cane reception and preparation equipment failure
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 58 % of the line's lost time. Reported by 1 of the 43 studies that could observe it (sparse evidence).
What happens
Mechanical or electrical breakdowns occur in the equipment that unloads, conveys and prepares raw cane before it enters the mills, such as cane carriers, cranes, choppers and shredders. Wear, overload from stones or metal debris, bearing or knife failure, and drive faults interrupt the flow of cane into the milling train.
What is done about it
Apply preventive maintenance and condition monitoring on carriers, cranes, choppers and shredders, install foreign-material detection and removal ahead of the preparation equipment, and keep critical spares and standby drives available to restore cane flow quickly.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.9% [0.2–2.7%]
- Expected share of lost time
- 0.5% [0.1–1.6%]
- Share of lost time when present
- 58% [47–68%]
- Studies / units
- 43 / 48
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products1.1% [0.1–4.4%]5 studies
- Soft drinks, bottled water and juices1.1% [0.1–4.2%]1 study
- Brewing, wine and spirits1.1% [0.1–4.4%]0 studies
- Bakery and pasta1.1% [0.1–4.5%]0 studies
- Meat, poultry and seafood1.1% [0.1–4.6%]0 studies
- Fruit and vegetable processing1.1% [0.1–4.2%]2 studies
- Grain and oilseed milling1.1% [0.1–4.1%]7 studies
- Sugar and confectionery1.4% [0.1–5.1%]10 studies
- Snacks, coffee, tea and other foods1.0% [0.1–3.8%]5 studies
- Animal feed and pet food1.1% [0.1–4.1%]6 studies
- Food manufacturing (unspecified or mixed)1.0% [0.1–3.9%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceMechanical or electrical breakdowns occur in the equipment that unloads, conveys and prepares raw cane before it enters the mills, such as cane carriers, cranes, choppers and shredders. Wear, overload from stones or metal debris, bearing or knife failure, and drive faults interrupt the flow of cane into the milling train.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows motor overload or trip alarms, sudden drop of carrier or shredder speed to zero, extended downtime logged against the cane reception or preparation station, and starvation alarms on the downstream mill feed.
Countermeasure
Engineering guidanceApply preventive maintenance and condition monitoring on carriers, cranes, choppers and shredders, install foreign-material detection and removal ahead of the preparation equipment, and keep critical spares and standby drives available to restore cane flow quickly.
4Sources
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 135 events · as reported: “Cane preparation”
Show verbatim quote
Preparo de cana 135 138,3 246,5 60760,6 51,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 138 min · as reported: “Cane preparation”
Show verbatim quote
Preparo de cana 135 138,3 246,5 60760,6 51,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceNumber of events: 15.0 events · as reported: “Cane reception”
Show verbatim quote
Recepção de cana 15 40,7 64,6 4177,7 15,0
- ESTRATÉGIA DE MANUTENÇÃO EM UMA USINA DE AÇUCAR E ALCOOL UTILIZANDO MODELO ESTATÍSTICO DE CONFIABILIDADE (2024)Open sourceMean event duration: 40.7 min · as reported: “Cane reception”
Show verbatim quote
Recepção de cana 15 40,7 64,6 4177,7 15,0