Equipment failure (breakdowns)

Cane reception and preparation equipment failure

Equipment failure (breakdowns)AvailabilityMilling and grinding

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 58 % of the line's lost time. Reported by 1 of the 43 studies that could observe it (sparse evidence).

What happens

Mechanical or electrical breakdowns occur in the equipment that unloads, conveys and prepares raw cane before it enters the mills, such as cane carriers, cranes, choppers and shredders. Wear, overload from stones or metal debris, bearing or knife failure, and drive faults interrupt the flow of cane into the milling train.

What is done about it

Apply preventive maintenance and condition monitoring on carriers, cranes, choppers and shredders, install foreign-material detection and removal ahead of the preparation equipment, and keep critical spares and standby drives available to restore cane flow quickly.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.9% [0.2–2.7%]
Expected share of lost time
0.5% [0.1–1.6%]
Share of lost time when present
58% [47–68%]
Studies / units
43 / 48
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.1% [0.1–4.4%]5 studies
  • Soft drinks, bottled water and juices
    1.1% [0.1–4.2%]1 study
  • Brewing, wine and spirits
    1.1% [0.1–4.4%]0 studies
  • Bakery and pasta
    1.1% [0.1–4.5%]0 studies
  • Meat, poultry and seafood
    1.1% [0.1–4.6%]0 studies
  • Fruit and vegetable processing
    1.1% [0.1–4.2%]2 studies
  • Grain and oilseed milling
    1.1% [0.1–4.1%]7 studies
  • Sugar and confectionery
    1.4% [0.1–5.1%]10 studies
  • Snacks, coffee, tea and other foods
    1.0% [0.1–3.8%]5 studies
  • Animal feed and pet food
    1.1% [0.1–4.1%]6 studies
  • Food manufacturing (unspecified or mixed)
    1.0% [0.1–3.9%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Mechanical or electrical breakdowns occur in the equipment that unloads, conveys and prepares raw cane before it enters the mills, such as cane carriers, cranes, choppers and shredders. Wear, overload from stones or metal debris, bearing or knife failure, and drive faults interrupt the flow of cane into the milling train.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows motor overload or trip alarms, sudden drop of carrier or shredder speed to zero, extended downtime logged against the cane reception or preparation station, and starvation alarms on the downstream mill feed.

Countermeasure

Engineering guidance

Apply preventive maintenance and condition monitoring on carriers, cranes, choppers and shredders, install foreign-material detection and removal ahead of the preparation equipment, and keep critical spares and standby drives available to restore cane flow quickly.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Number of events: 135 events · as reported: “Cane preparation”
    Show verbatim quote
    Preparo de cana 135 138,3 246,5 60760,6 51,0
  2. Mean event duration: 138 min · as reported: “Cane preparation”
    Show verbatim quote
    Preparo de cana 135 138,3 246,5 60760,6 51,0
  3. Number of events: 15.0 events · as reported: “Cane reception”
    Show verbatim quote
    Recepção de cana 15 40,7 64,6 4177,7 15,0
  4. Mean event duration: 40.7 min · as reported: “Cane reception”
    Show verbatim quote
    Recepção de cana 15 40,7 64,6 4177,7 15,0