Cut-open rework of filled packages at changeover
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 0 of the 120 studies that could observe it (sparse evidence).
What happens
During a product or format changeover on the filling machine, packages that were filled before the line settings were finalised or that remain as work-in-process do not meet specification and cannot be sold as finished goods. An operator manually cuts these packages open to recover the contained product, which is returned to the process as rework, and this manual recovery task adds non-productive time to the changeover.
What is done about it
Reduce the volume of work-in-process carried through a changeover by improving line sequencing and shutdown timing, and provide a dedicated, ergonomic station or semi-automated opener for package recovery so the task runs in parallel with, rather than inside, the changeover window. Standardise the rework-return procedure and train operators so the recovery step is executed consistently and quickly.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.3% [0.1–1.0%]
- Expected share of lost time
- 0.2% [0.0–0.6%]
- Share of lost time when present
- 56% [43–67%]
- Studies / units
- 120 / 162
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.4%]18 studies
- Soft drinks, bottled water and juices0.3% [0.0–1.2%]44 studies
- Brewing, wine and spirits0.4% [0.0–1.5%]16 studies
- Bakery and pasta0.4% [0.0–1.6%]0 studies
- Meat, poultry and seafood0.4% [0.0–1.5%]6 studies
- Fruit and vegetable processing0.4% [0.0–1.7%]4 studies
- Grain and oilseed milling0.4% [0.0–1.6%]6 studies
- Sugar and confectionery0.4% [0.0–1.6%]3 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.6%]6 studies
- Animal feed and pet food0.4% [0.0–1.5%]4 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.5%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceDuring a product or format changeover on the filling machine, packages that were filled before the line settings were finalised or that remain as work-in-process do not meet specification and cannot be sold as finished goods. An operator manually cuts these packages open to recover the contained product, which is returned to the process as rework, and this manual recovery task adds non-productive time to the changeover.
How it looks in SCADA data
Engineering guidanceThe filling machine state log shows an extended setup or changeover duration beyond the nominal changeover time, with the machine in a non-running manual-intervention state and no fault or stop alarm raised. Downstream counters show no good-unit output while upstream or batching systems may record a rework or return-to-process transaction tied to the same time window.
Countermeasure
Engineering guidanceReduce the volume of work-in-process carried through a changeover by improving line sequencing and shutdown timing, and provide a dedicated, ergonomic station or semi-automated opener for package recovery so the task runs in parallel with, rather than inside, the changeover window. Standardise the rework-return procedure and train operators so the recovery step is executed consistently and quickly.
4Sources
- Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study (2021)Open sourceLost time: 3.00 min · as reported: “Cut Open Rework”
Show verbatim quote
Cut Open Rework 0:28:00 0:31:00 0:03:00