Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study

Open source

1Bibliographic record

Authors
Johan Krisnanto Runtuk
Year
2021
Venue
JIE Scientific Journal on Research and Application of Industrial System
Country
—
Segment
Food manufacturing (unspecified or mixed)
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
92 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
As one of the foods and beverages industry, PT. MNO also focuses on reducing waste in the production process, especially in the filling department.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
setup time or line preparation timefilling machine
Show verbatim quote (Section 1, Introduction)
The most significant contribution of planned stoppages is 48% comes from setup time or line preparation time.
Setup and adjustmentsShare of lost time48.0 %Single extractor
cleaning inspection and lubrication processfilling machine
Show verbatim quote (Section 1, Introduction)
The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time34.0 %Single extractor
operational stoppagesfilling machine
Show verbatim quote (Section 1, Introduction)
The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
Not classifiable from the reportShare of lost time19.0 %Single extractor
meals or breakfilling machine
Show verbatim quote (Section 1, Introduction)
The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time3.00 %Single extractor
change over timefilling machine
Show verbatim quote (Section 1, Introduction)
The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
Setup and adjustmentsShare of lost time2.00 %Single extractor
planned maintenancefilling machine
Show verbatim quote (Section 1, Introduction)
The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
Planned downtime (scheduled maintenance, breaks, no demand)Share of lost time1.00 %Single extractor
planned stoppagesfilling machine
Show verbatim quote (Section 1, Introduction)
Based on the whole company manufacturing process, the highest number of waiting waste occurs in filling machines, especially for the planned stoppages with 67% compared with the 33% for the unplanned stoppages.
Not classifiable from the reportShare of lost time67.0 %Single extractor
unplanned stoppagesfilling machine
Show verbatim quote (Section 1, Introduction)
Based on the whole company manufacturing process, the highest number of waiting waste occurs in filling machines, especially for the planned stoppages with 67% compared with the 33% for the unplanned stoppages.
Not classifiable from the reportShare of lost time33.0 %Single extractor
—filling machine
Show verbatim quote (Section 3.1, Table 2)
The total time needed to conduct the setup activities in the filling machine is 34 minutes, with eight different activities.
Setup and adjustmentsLost time34.0 minutesSingle extractor
—filling machine
Show verbatim quote (Section 3.2)
The availability rates from April and June 2016 are 86% and 89%.
noneAvailability86.0 %Single extractor
—filling machine
Show verbatim quote (Section 3.2)
The performance rate from May and June 2016 is 88% and 88%.
nonePerformance88.0 %Single extractor
—filling machine
Show verbatim quote (Section 3.2)
The quality rate for the entire month from May and June 2016 is 100%.
noneQuality100 %Single extractor
—filling machine
Show verbatim quote (Section 3.2)
Then, the OEE rates are 76% and 78% from May until June 2016.
noneOEE76.0 %Single extractor
—filling machine
Show verbatim quote (Section 3.1, Table 4)
Table 4 shows that the setup activities, which means the activities done when the machine stops, are reduced from 13 minutes to 10 minutes.
Setup and adjustmentsLost time10.0 minutesSingle extractor
—filling machine
Show verbatim quote (Section 3.2)
The availability rates from April and June 2016 are 86% and 89%.
noneAvailability89.0 %Single extractor
—filling machine
Show verbatim quote (Section 3.2)
The performance rate from May and June 2016 is 88% and 88%.
nonePerformance88.0 %Single extractor
—filling machine
Show verbatim quote (Section 3.2)
The quality rate for the entire month from May and June 2016 is 100%.
noneQuality100 %Single extractor
—filling machine
Show verbatim quote (Section 3.2)
Then, the OEE rates are 76% and 78% from May until June 2016.
noneOEE78.0 %Single extractor
Setup timefilling machine
Show verbatim quote (Page 5, Section 3.1, SMED and 5S)
Before the improvement of Single Minute Exchange of Dies (SMED), the actual setup activities are eight activities in total with 34 minutes to finish the setup activities
Setup and adjustmentsLost time34.0 minSingle extractor
Checking Metal Detectormetal detector
Show verbatim quote (Table 2, Page 6)
Record Counter Metal Detector 0:00:00 0:01:00 0:01:00; Verified positive sample metal detector 0:01:00 0:02:00 0:01:00
Setup and adjustmentsLost time2.00 minSingle extractor
Cleaning Environmentfilling machine
Show verbatim quote (Table 2, Page 6, Activity group B)
Take Cleaning Tools 0:02:00 0:04:00 0:02:00; Cleaning floor below the machine 0:04:00 0:07:00 0:03:00; Tidy Up Cleaning Tools 0:07:00 0:09:00 0:02:00
Setup and adjustmentsLost time7.00 minSingle extractor
Cut Open Reworkfilling machine
Show verbatim quote (Table 2, Page 6, Activity group G)
Cut Open Rework 0:28:00 0:31:00 0:03:00
Setup and adjustmentsLost time3.00 minSingle extractor
SHO Updateshift handover documentation
Show verbatim quote (Table 2, Page 6, Activity group H)
SHO Update 0:31:00 0:34:00 0:03:00
Setup and adjustmentsLost time3.00 minSingle extractor

Observation units

  • Filling Machine · Filling · Baseline
  • Filling Machine · Filling · After intervention