Included study
Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study
1Bibliographic record
- Authors
- Johan Krisnanto Runtuk
- Year
- 2021
- Venue
- JIE Scientific Journal on Research and Application of Industrial System
- Country
- —
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 92 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
As one of the foods and beverages industry, PT. MNO also focuses on reducing waste in the production process, especially in the filling department.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 11Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
setup time or line preparation timefilling machineShow verbatim quote (Section 1, Introduction)The most significant contribution of planned stoppages is 48% comes from setup time or line preparation time. | Setup and adjustments | Share of lost time | 48.0 % | Single extractor |
cleaning inspection and lubrication processfilling machineShow verbatim quote (Section 1, Introduction)The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance. | Planned downtime (scheduled maintenance, breaks, no demand) | Share of lost time | 34.0 % | Single extractor |
operational stoppagesfilling machineShow verbatim quote (Section 1, Introduction)The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance. | Not classifiable from the report | Share of lost time | 19.0 % | Single extractor |
meals or breakfilling machineShow verbatim quote (Section 1, Introduction)The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance. | Planned downtime (scheduled maintenance, breaks, no demand) | Share of lost time | 3.00 % | Single extractor |
change over timefilling machineShow verbatim quote (Section 1, Introduction)The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance. | Setup and adjustments | Share of lost time | 2.00 % | Single extractor |
planned maintenancefilling machineShow verbatim quote (Section 1, Introduction)The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance. | Planned downtime (scheduled maintenance, breaks, no demand) | Share of lost time | 1.00 % | Single extractor |
planned stoppagesfilling machineShow verbatim quote (Section 1, Introduction)Based on the whole company manufacturing process, the highest number of waiting waste occurs in filling machines, especially for the planned stoppages with 67% compared with the 33% for the unplanned stoppages. | Not classifiable from the report | Share of lost time | 67.0 % | Single extractor |
unplanned stoppagesfilling machineShow verbatim quote (Section 1, Introduction)Based on the whole company manufacturing process, the highest number of waiting waste occurs in filling machines, especially for the planned stoppages with 67% compared with the 33% for the unplanned stoppages. | Not classifiable from the report | Share of lost time | 33.0 % | Single extractor |
—filling machineShow verbatim quote (Section 3.1, Table 2)The total time needed to conduct the setup activities in the filling machine is 34 minutes, with eight different activities. | Setup and adjustments | Lost time | 34.0 minutes | Single extractor |
—filling machineShow verbatim quote (Section 3.2)The availability rates from April and June 2016 are 86% and 89%. | none | Availability | 86.0 % | Single extractor |
—filling machineShow verbatim quote (Section 3.2)The performance rate from May and June 2016 is 88% and 88%. | none | Performance | 88.0 % | Single extractor |
—filling machineShow verbatim quote (Section 3.2)The quality rate for the entire month from May and June 2016 is 100%. | none | Quality | 100 % | Single extractor |
—filling machineShow verbatim quote (Section 3.2)Then, the OEE rates are 76% and 78% from May until June 2016. | none | OEE | 76.0 % | Single extractor |
—filling machineShow verbatim quote (Section 3.1, Table 4)Table 4 shows that the setup activities, which means the activities done when the machine stops, are reduced from 13 minutes to 10 minutes. | Setup and adjustments | Lost time | 10.0 minutes | Single extractor |
—filling machineShow verbatim quote (Section 3.2)The availability rates from April and June 2016 are 86% and 89%. | none | Availability | 89.0 % | Single extractor |
—filling machineShow verbatim quote (Section 3.2)The performance rate from May and June 2016 is 88% and 88%. | none | Performance | 88.0 % | Single extractor |
—filling machineShow verbatim quote (Section 3.2)The quality rate for the entire month from May and June 2016 is 100%. | none | Quality | 100 % | Single extractor |
—filling machineShow verbatim quote (Section 3.2)Then, the OEE rates are 76% and 78% from May until June 2016. | none | OEE | 78.0 % | Single extractor |
Setup timefilling machineShow verbatim quote (Page 5, Section 3.1, SMED and 5S)Before the improvement of Single Minute Exchange of Dies (SMED), the actual setup activities are eight activities in total with 34 minutes to finish the setup activities | Setup and adjustments | Lost time | 34.0 min | Single extractor |
Checking Metal Detectormetal detectorShow verbatim quote (Table 2, Page 6)Record Counter Metal Detector 0:00:00 0:01:00 0:01:00; Verified positive sample metal detector 0:01:00 0:02:00 0:01:00 | Setup and adjustments | Lost time | 2.00 min | Single extractor |
Cleaning Environmentfilling machineShow verbatim quote (Table 2, Page 6, Activity group B)Take Cleaning Tools 0:02:00 0:04:00 0:02:00; Cleaning floor below the machine 0:04:00 0:07:00 0:03:00; Tidy Up Cleaning Tools 0:07:00 0:09:00 0:02:00 | Setup and adjustments | Lost time | 7.00 min | Single extractor |
Cut Open Reworkfilling machineShow verbatim quote (Table 2, Page 6, Activity group G)Cut Open Rework 0:28:00 0:31:00 0:03:00 | Setup and adjustments | Lost time | 3.00 min | Single extractor |
SHO Updateshift handover documentationShow verbatim quote (Table 2, Page 6, Activity group H)SHO Update 0:31:00 0:34:00 0:03:00 | Setup and adjustments | Lost time | 3.00 min | Single extractor |
Observation units
- Filling Machine · Filling · Baseline
- Filling Machine · Filling · After intervention