Scheduled cleaning, inspection and lubrication of the filler

planned downtimeFilling

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 120 studies that could observe it (sparse evidence).

What happens

The filling machine is taken offline on a scheduled basis so operators or maintenance staff can clean the equipment and surrounding area, visually inspect components, and apply lubrication to moving parts as part of routine autonomous or preventive maintenance. This is a planned activity rather than a reaction to a fault, and it is often bundled with changeover cleaning when it falls close to a product or format change.</p>

What is done about it

Standardize cleaning, inspection and lubrication tasks into checklists embedded in an autonomous maintenance or total productive maintenance program, and schedule them during low-demand windows or combine them efficiently with planned changeovers. Applying single-minute exchange of die principles to separate internal and external tasks can shorten the time the filler remains stopped for these routine activities.</p>

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.6% [0.1–1.5%]
Expected share of lost time
0.3% [0.1–0.9%]
Share of lost time when present
56% [45–67%]
Studies / units
120 / 162
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.6% [0.1–2.1%]18 studies
  • Soft drinks, bottled water and juices
    0.5% [0.1–1.7%]44 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.2%]16 studies
  • Bakery and pasta
    0.7% [0.1–2.5%]0 studies
  • Meat, poultry and seafood
    0.6% [0.1–2.3%]6 studies
  • Fruit and vegetable processing
    0.7% [0.1–2.5%]4 studies
  • Grain and oilseed milling
    0.7% [0.1–2.5%]6 studies
  • Sugar and confectionery
    0.7% [0.1–2.4%]3 studies
  • Snacks, coffee, tea and other foods
    0.6% [0.1–2.2%]6 studies
  • Animal feed and pet food
    0.7% [0.1–2.4%]4 studies
  • Food manufacturing (unspecified or mixed)
    0.9% [0.1–3.3%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The filling machine is taken offline on a scheduled basis so operators or maintenance staff can clean the equipment and surrounding area, visually inspect components, and apply lubrication to moving parts as part of routine autonomous or preventive maintenance. This is a planned activity rather than a reaction to a fault, and it is often bundled with changeover cleaning when it falls close to a product or format change.</p>

How it looks in SCADA data

Engineering guidance

The line logs a planned stop or maintenance machine state with a regular, recurring pattern rather than isolated fault alarms, and the stop reason code typically references cleaning, inspection or lubrication rather than a specific failure. Duration tends to be consistent across occurrences and no abnormal sensor trends precede the stop, distinguishing it from unplanned equipment failure.</p>

Countermeasure

Engineering guidance

Standardize cleaning, inspection and lubrication tasks into checklists embedded in an autonomous maintenance or total productive maintenance program, and schedule them during low-demand windows or combine them efficiently with planned changeovers. Applying single-minute exchange of die principles to separate internal and external tasks can shorten the time the filler remains stopped for these routine activities.</p>

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 34.0 % · as reported: “cleaning inspection and lubrication process”
    Show verbatim quote
    The next is 34% of cleaning inspection and lubrication process, 19% of operational stoppages, 3% of meals or break, 2% of change over time, and the last 1% of planned maintenance.
  2. Lost time: 7.00 min · as reported: “Cleaning Environment”
    Show verbatim quote
    Take Cleaning Tools 0:02:00 0:04:00 0:02:00; Cleaning floor below the machine 0:04:00 0:07:00 0:03:00; Tidy Up Cleaning Tools 0:07:00 0:09:00 0:02:00