Defective incoming pouch from supplier
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 48 % of the line's lost time. Reported by 0 of the 120 studies that could observe it (sparse evidence).
What happens
Empty pouches arrive from the supplier with latent defects such as pinholes, weak or misaligned seals, deformed spouts or printing flaws that are not detected before filling. When these pouches are filled and sealed, the pre-existing defect leads to leakage, bursting, poor seal integrity or cosmetic rejection at inspection, even though the filling equipment itself is operating correctly.
What is done about it
Strengthen incoming quality control with sampling inspection or automated vision checks of empty pouches before filling, and track defect rates by supplier and lot to trigger corrective action or lot rejection. Formalize supplier specifications and audits, and establish feedback loops so recurring defect patterns are escalated to the pouch supplier for root-cause correction.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.4% [0.1–1.1%]
- Expected share of lost time
- 0.2% [0.0–0.5%]
- Share of lost time when present
- 48% [36–60%]
- Studies / units
- 120 / 162
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.6%]18 studies
- Soft drinks, bottled water and juices0.4% [0.0–1.4%]44 studies
- Brewing, wine and spirits0.4% [0.0–1.6%]16 studies
- Bakery and pasta0.5% [0.0–1.9%]0 studies
- Meat, poultry and seafood0.4% [0.0–1.5%]6 studies
- Fruit and vegetable processing0.4% [0.0–1.7%]4 studies
- Grain and oilseed milling0.4% [0.0–1.8%]6 studies
- Sugar and confectionery0.5% [0.0–1.8%]3 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.7%]6 studies
- Animal feed and pet food0.4% [0.0–1.7%]4 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.7%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceEmpty pouches arrive from the supplier with latent defects such as pinholes, weak or misaligned seals, deformed spouts or printing flaws that are not detected before filling. When these pouches are filled and sealed, the pre-existing defect leads to leakage, bursting, poor seal integrity or cosmetic rejection at inspection, even though the filling equipment itself is operating correctly.
How it looks in SCADA data
Engineering guidanceMES/quality data show elevated reject counts at checkweigher or vision inspection stations with defect codes pointing to pouch integrity (leak, seal, print) rather than filler faults, while filler machine states remain in normal run with no equipment alarms. Rejects often cluster by supplier batch or pouch lot rather than by time of day or shift.
Countermeasure
Engineering guidanceStrengthen incoming quality control with sampling inspection or automated vision checks of empty pouches before filling, and track defect rates by supplier and lot to trigger corrective action or lot rejection. Formalize supplier specifications and audits, and establish feedback loops so recurring defect patterns are escalated to the pouch supplier for root-cause correction.
4Sources
- Integration of Overall Equipment Effectiveness and Six Sigma Approach to Minimize Product Defect and Machine Downtime (2023)Open sourceShare of loss events: 2.00 % · as reported: “Defective pouch from supplier”
Show verbatim quote
Defective pouch from supplier 97 2
- Integration of Overall Equipment Effectiveness and Six Sigma Approach to Minimize Product Defect and Machine Downtime (2023)Open sourceNumber of events: 97.0 units · as reported: “Defective pouch from supplier”
Show verbatim quote
Defective pouch from supplier 97 2

