Integration of Overall Equipment Effectiveness and Six Sigma Approach to Minimize Product Defect and Machine Downtime

Open source

1Bibliographic record

Authors
Filscha Nurprihatin, Glisina Dwinoor Rembulan, Johanes Fernandes Andry, Maulidina Lubis, Ivana Tita Bella Widiwati, Ali Vaezi
Year
2023
Venue
Management and Production Engineering Review
Country
Indonesia
Segment
Grain and oilseed milling
Process family
Filling and packaging line
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
122 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
Thimonnier THD800 2 machine is an oil packaging production machine that performs filling and coding.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Defective pouch from supplier
Show verbatim quote (Table 11)
Defective pouch from supplier 97 2
Process defects (scrap and rework)Share of loss events2.00 %Adjudicated
Defective pouch from supplier
Show verbatim quote (Table 11)
Defective pouch from supplier 97 2
Process defects (scrap and rework)Number of events97.0 unitsAdjudicated
Conveyor PouchConveyor Pouch
Show verbatim quote (Table 10)
Conveyor Pouch 3
Equipment failure (breakdowns)Number of events3.00 eventsBoth extractors agreed
Block SealingBlock Sealing
Show verbatim quote (Table 10)
Block Sealing 1
Equipment failure (breakdowns)Number of events1.00 eventsBoth extractors agreed
Solenoid AirSolenoid Air
Show verbatim quote (Table 10)
Solenoid Air 2
Equipment failure (breakdowns)Number of events2.00 eventsBoth extractors agreed
Block CodingBlock Coding
Show verbatim quote (Table 10)
Block Coding 5
Equipment failure (breakdowns)Number of events5.00 eventsBoth extractors agreed
Opening BagOpening Bag
Show verbatim quote (Table 10)
Opening Bag 10
Equipment failure (breakdowns)Number of events10.0 eventsBoth extractors agreed
Loading bagLoading bag
Show verbatim quote (Table 10)
Loading bag 6
Equipment failure (breakdowns)Number of events6.00 eventsBoth extractors agreed
Dosing PumpDosing Pump
Show verbatim quote (Table 10)
Dosing Pump 6
Equipment failure (breakdowns)Number of events6.00 eventsBoth extractors agreed
Less Content Oil
Show verbatim quote (Table 11)
Less Content Oil 676 15
Process defects (scrap and rework)Share of loss events15.0 %Both extractors agreed
Less Content Oil
Show verbatim quote (Table 11)
Less Content Oil 676 15
Process defects (scrap and rework)Number of events676 unitsBoth extractors agreed
Air HoseAir Hose
Show verbatim quote (Table 10)
Air Hose 5
Equipment failure (breakdowns)Number of events5.00 eventsBoth extractors agreed
GripperGripper
Show verbatim quote (Table 10)
Gripper 12
Equipment failure (breakdowns)Number of events12.0 eventsBoth extractors agreed
Body Defect
Show verbatim quote (Table 11)
Body Defect 1012 22
Process defects (scrap and rework)Share of loss events22.0 %Both extractors agreed
Body Defect
Show verbatim quote (Table 11)
Body Defect 1012 22
Process defects (scrap and rework)Number of events1,012 unitsBoth extractors agreed
Seal Defect
Show verbatim quote (Table 11)
Seal Defect 2555 56
Process defects (scrap and rework)Share of loss events56.0 %Both extractors agreed
Seal Defect
Show verbatim quote (Table 11)
Seal Defect 2555 56
Process defects (scrap and rework)Number of events2,555 unitsBoth extractors agreed
No Code
Show verbatim quote (Table 11)
No Code 192 4
Process defects (scrap and rework)Share of loss events4.00 %Both extractors agreed
No Code
Show verbatim quote (Table 11)
No Code 192 4
Process defects (scrap and rework)Number of events192 unitsBoth extractors agreed
—Thimonnier 2 machine
Show verbatim quote (Table 5)
Average 86 97.1 98.3 82
noneOEE82.0 %Single extractor
—Thimonnier 2 machine
Show verbatim quote (Table 5)
Average 86 97.1 98.3 82
noneAvailability86.0 %Single extractor
—Thimonnier 2 machine
Show verbatim quote (Table 5)
Average 86 97.1 98.3 82
nonePerformance97.1 %Single extractor
—Thimonnier 2 machine
Show verbatim quote (Table 5)
Average 86 97.1 98.3 82
noneQuality98.3 %Single extractor
Total DowntimeThimonnier 2 machine
Show verbatim quote (Table 16)
Total Downtime 29.48 2.84
Not classifiable from the reportLost time29.5 hSingle extractor

Observation units

  • Thimonnier 2 machine · Filling · Baseline