Included study
Integration of Overall Equipment Effectiveness and Six Sigma Approach to Minimize Product Defect and Machine Downtime
1Bibliographic record
- Authors
- Filscha Nurprihatin, Glisina Dwinoor Rembulan, Johanes Fernandes Andry, Maulidina Lubis, Ivana Tita Bella Widiwati, Ali Vaezi
- Year
- 2023
- Venue
- Management and Production Engineering Review
- Country
- Indonesia
- Segment
- Grain and oilseed milling
- Process family
- Filling and packaging line
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 122 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
Thimonnier THD800 2 machine is an oil packaging production machine that performs filling and coding.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 13Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Defective pouch from supplierShow verbatim quote (Table 11)Defective pouch from supplier 97 2 | Process defects (scrap and rework) | Share of loss events | 2.00 % | Adjudicated |
Defective pouch from supplierShow verbatim quote (Table 11)Defective pouch from supplier 97 2 | Process defects (scrap and rework) | Number of events | 97.0 units | Adjudicated |
Conveyor PouchConveyor PouchShow verbatim quote (Table 10)Conveyor Pouch 3 | Equipment failure (breakdowns) | Number of events | 3.00 events | Both extractors agreed |
Block SealingBlock SealingShow verbatim quote (Table 10)Block Sealing 1 | Equipment failure (breakdowns) | Number of events | 1.00 events | Both extractors agreed |
Solenoid AirSolenoid AirShow verbatim quote (Table 10)Solenoid Air 2 | Equipment failure (breakdowns) | Number of events | 2.00 events | Both extractors agreed |
Block CodingBlock CodingShow verbatim quote (Table 10)Block Coding 5 | Equipment failure (breakdowns) | Number of events | 5.00 events | Both extractors agreed |
Opening BagOpening BagShow verbatim quote (Table 10)Opening Bag 10 | Equipment failure (breakdowns) | Number of events | 10.0 events | Both extractors agreed |
Loading bagLoading bagShow verbatim quote (Table 10)Loading bag 6 | Equipment failure (breakdowns) | Number of events | 6.00 events | Both extractors agreed |
Dosing PumpDosing PumpShow verbatim quote (Table 10)Dosing Pump 6 | Equipment failure (breakdowns) | Number of events | 6.00 events | Both extractors agreed |
Less Content OilShow verbatim quote (Table 11)Less Content Oil 676 15 | Process defects (scrap and rework) | Share of loss events | 15.0 % | Both extractors agreed |
Less Content OilShow verbatim quote (Table 11)Less Content Oil 676 15 | Process defects (scrap and rework) | Number of events | 676 units | Both extractors agreed |
Air HoseAir HoseShow verbatim quote (Table 10)Air Hose 5 | Equipment failure (breakdowns) | Number of events | 5.00 events | Both extractors agreed |
GripperGripperShow verbatim quote (Table 10)Gripper 12 | Equipment failure (breakdowns) | Number of events | 12.0 events | Both extractors agreed |
Body DefectShow verbatim quote (Table 11)Body Defect 1012 22 | Process defects (scrap and rework) | Share of loss events | 22.0 % | Both extractors agreed |
Body DefectShow verbatim quote (Table 11)Body Defect 1012 22 | Process defects (scrap and rework) | Number of events | 1,012 units | Both extractors agreed |
Seal DefectShow verbatim quote (Table 11)Seal Defect 2555 56 | Process defects (scrap and rework) | Share of loss events | 56.0 % | Both extractors agreed |
Seal DefectShow verbatim quote (Table 11)Seal Defect 2555 56 | Process defects (scrap and rework) | Number of events | 2,555 units | Both extractors agreed |
No CodeShow verbatim quote (Table 11)No Code 192 4 | Process defects (scrap and rework) | Share of loss events | 4.00 % | Both extractors agreed |
No CodeShow verbatim quote (Table 11)No Code 192 4 | Process defects (scrap and rework) | Number of events | 192 units | Both extractors agreed |
—Thimonnier 2 machineShow verbatim quote (Table 5)Average 86 97.1 98.3 82 | none | OEE | 82.0 % | Single extractor |
—Thimonnier 2 machineShow verbatim quote (Table 5)Average 86 97.1 98.3 82 | none | Availability | 86.0 % | Single extractor |
—Thimonnier 2 machineShow verbatim quote (Table 5)Average 86 97.1 98.3 82 | none | Performance | 97.1 % | Single extractor |
—Thimonnier 2 machineShow verbatim quote (Table 5)Average 86 97.1 98.3 82 | none | Quality | 98.3 % | Single extractor |
Total DowntimeThimonnier 2 machineShow verbatim quote (Table 16)Total Downtime 29.48 2.84 | Not classifiable from the report | Lost time | 29.5 h | Single extractor |
Observation units
- Thimonnier 2 machine · Filling · Baseline