Dryer equipment malfunction and downtime
In short
It appears in about 4 of every 100 lines studied.
When it appears, it takes on average about 58 % of the line's lost time. Reported by 4 of the 28 studies that could observe it (limited evidence).
What happens
Mechanical, electrical or pneumatic components of the dryer (fans, burners, conveyors, bearings, heating elements) wear out or fail, causing the machine to stop unexpectedly or requiring extended preparation and warm-up before stable operation is reached. While the dryer is down or not yet at operating temperature, product can be left under- or over-dried, producing drying losses in addition to the lost machine time.
What is done about it
Implement condition-based and preventive maintenance on critical dryer components, keep critical spare parts available, and standardize startup/preparation procedures to shorten warm-up time and stabilize drying conditions faster. Monitor key process variables to detect degradation trends before they cause unplanned stops or out-of-spec drying.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 3.6% [0.9–9.2%]
- Expected share of lost time
- 2.1% [0.5–5.4%]
- Share of lost time when present
- 58% [48–69%]
- Studies / units
- 28 / 32
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products3.8% [0.5–12.6%]5 studies
- Soft drinks, bottled water and juices4.1% [0.5–14.3%]1 study
- Brewing, wine and spirits4.3% [0.5–15.1%]0 studies
- Bakery and pasta4.4% [0.5–15.3%]0 studies
- Meat, poultry and seafood4.2% [0.5–14.4%]0 studies
- Fruit and vegetable processing4.0% [0.5–13.2%]2 studies
- Grain and oilseed milling6.2% [0.7–22.4%]1 study
- Sugar and confectionery5.1% [0.8–15.2%]4 studies
- Snacks, coffee, tea and other foods5.2% [0.7–16.7%]4 studies
- Animal feed and pet food5.4% [0.7–18.0%]4 studies
- Food manufacturing (unspecified or mixed)3.7% [0.5–12.0%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceMechanical, electrical or pneumatic components of the dryer (fans, burners, conveyors, bearings, heating elements) wear out or fail, causing the machine to stop unexpectedly or requiring extended preparation and warm-up before stable operation is reached. While the dryer is down or not yet at operating temperature, product can be left under- or over-dried, producing drying losses in addition to the lost machine time.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows the dryer state switching from running to fault or idle with associated alarm codes, prolonged preparation/warm-up state durations before the first good batch, and process variables such as air temperature, airflow or burner status deviating from setpoint just before the stop. Moisture content readings or quality checks taken around these events often drift outside specification.
Countermeasure
Engineering guidanceImplement condition-based and preventive maintenance on critical dryer components, keep critical spare parts available, and standardize startup/preparation procedures to shorten warm-up time and stabilize drying conditions faster. Monitor key process variables to detect degradation trends before they cause unplanned stops or out-of-spec drying.
4Sources
- KajianKehilangan Hasil Pada Pengeringan dan Penggilingan Padi di Lahan Pasang Surut Sumatera Selatan (2012)Open sourceDefect rate: 7.13 % · as reported: “loss during drying (box dryer)”
Show verbatim quote
Lost during drying was 2.77 for sun drying compared to 7.13% with box dryer.
- KajianKehilangan Hasil Pada Pengeringan dan Penggilingan Padi di Lahan Pasang Surut Sumatera Selatan (2012)Open sourceDefect rate: 2.77 % · as reported: “loss during drying (sun drying)”
Show verbatim quote
Lost during drying was 2.77 for sun drying compared to 7.13% with box dryer.
- IMPACT OF FACILITY MAINTENANCE SYSTEM ON PRODUCT PHYSICAL LOSSES IN A POULTRY FEED MILL UNIT (2011)Open sourceLost time: 0.598 Kg.h-1 · as reported: “Drying sector (corn grains)”
Show verbatim quote
Drying 34 0.018 ± 0.003 0.598 ± 0.102 Kg 1.33
- Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ) (2019)Open sourceShare of loss events: 39.0 % · as reported: “normal wear and tear”
Show verbatim quote
Penyebab terjadinya kerusakan mesin terbesar adalah kategori normal wear and tear sebanyak 39% dari total kerusakan yang terjadi di area kerja kritis.
- Analysis of the Effectiveness of Fluidized Bed Dryer in Black Tea Processing Using the OEE Approach (2025)Open sourceLost time: 30.5 hours · as reported: “Machine Preparation Time”
Show verbatim quote
January 30.5 24.5 689 96
- Analysis of the Effectiveness of Fluidized Bed Dryer in Black Tea Processing Using the OEE Approach (2025)Open sourceLost time: 33.3 hours · as reported: “Machine Preparation Time”
Show verbatim quote
March 33.33 10.67 700 98
- Analysis of the Effectiveness of Fluidized Bed Dryer in Black Tea Processing Using the OEE Approach (2025)Open sourceLost time: 29.0 hours · as reported: “Machine Preparation Time”
Show verbatim quote
April 29 0 691 100
- Analysis of the Effectiveness of Fluidized Bed Dryer in Black Tea Processing Using the OEE Approach (2025)Open sourceLost time: 24.5 hours · as reported: “Machine Downtime”
Show verbatim quote
January 30.5 24.5 689 96
- Analysis of the Effectiveness of Fluidized Bed Dryer in Black Tea Processing Using the OEE Approach (2025)Open sourceLost time: 0 hours · as reported: “Machine Downtime”
Show verbatim quote
February 30.5 0 641.5 100
- Analysis of the Effectiveness of Fluidized Bed Dryer in Black Tea Processing Using the OEE Approach (2025)Open sourceLost time: 10.7 hours · as reported: “Machine Downtime”
Show verbatim quote
March 33.33 10.67 700 98
- Analysis of the Effectiveness of Fluidized Bed Dryer in Black Tea Processing Using the OEE Approach (2025)Open sourceLost time: 245 hours · as reported: “unexpected downtime”
Show verbatim quote
along with 245 hours of unexpected downtime in January, indicated losses caused by restart delays and reactive maintenance.