Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ)
1Bibliographic record
- Authors
- Sigit Priyono, Machfud Machfud, Agus Maulana
- Year
- 2019
- Venue
- Jurnal Aplikasi Bisnis dan Manajemen
- Country
- Indonesia
- Segment
- Sugar and confectionery
- Process family
- Concentration and drying
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · — machines
- Observation period
- 181 days
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
PT. XYZ merupakan salah satu perusahaan gula rafinasi terbesar di Indonesia.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
normal wear and teardryer-coolerShow verbatim quote (Analisis Permasalahan di Area Kerja Kritis)Penyebab terjadinya kerusakan mesin terbesar adalah kategori normal wear and tear sebanyak 39% dari total kerusakan yang terjadi di area kerja kritis. | Equipment failure (breakdowns) | Share of loss events | 39.0 % | Both extractors agreed |
—dryer-coolerShow verbatim quote (Penetapan Area Kerja Kritis)Total breakdown = 377,38 jam, MTTR = 14,5 jam dan MTBF = 161,3 Jam. | Equipment failure (breakdowns) | Time between events | 161 jam | Both extractors agreed |
—dryer-coolerShow verbatim quote (Penetapan Area Kerja Kritis)Total breakdown = 377,38 jam, MTTR = 14,5 jam dan MTBF = 161,3 Jam. | Equipment failure (breakdowns) | Mean event duration | 14.5 jam | Both extractors agreed |
—dryer-coolerShow verbatim quote (Penetapan Area Kerja Kritis)Total breakdown = 377,38 jam, MTTR = 14,5 jam dan MTBF = 161,3 Jam. | Equipment failure (breakdowns) | Lost time | 377 jam | Both extractors agreed |
—Show verbatim quote (Hasil - Pilar Quality Maintenance)Hasil perhitungan menghasilkan nilai quality rate secara rata-rata semester 1 adalah 98,7% dan sudah mendekati nilai standar yang ditargetkan. | none | Quality | 98.7 % | Both extractors agreed |
—Show verbatim quote (Hasil - Pilar Planned Maintenance)Performance rate pabrik gula PT. XYZ secara rata-rata semester 1 adalah 69%. | none | Performance | 69.0 % | Both extractors agreed |
—Show verbatim quote (Hasil - OEE dan Yield / Pilar Planned Maintenance)Availability secara rata-rata di semester 1 nilainya adalah 82%. | none | Availability | 82.0 % | Both extractors agreed |
lack of cleaning, loose tension, dan lack of lubricationdryer-coolerShow verbatim quote (Analisis Permasalahan di Area Kerja Kritis)Penyebab kerusakan kedua sebesar 29% (lack of cleaning, loose tension, dan lack of lubrication) bisa diatasi jika program autonomous maintenance dijalankan. | Equipment failure (breakdowns) | Share of loss events | 29.0 % | Both extractors agreed |
—Show verbatim quote (Tabel 2)OEE (%) 66,84 63,26 62,26 55,27 48,35 42,33 56,44 | none | OEE | 56.4 % | Single extractor |
—Show verbatim quote (Tabel 2)Yield (%) 95,71 94,42 95,37 96,42 94,28 93,29 94,32 | none | Yield | 94.3 % | Single extractor |
breakdown (PM01)Show verbatim quote (Gambar 4)Kejadian break down masih terjadi sejumlah 151 kejadian dengan durasi rata-rata 5,5 jam dalam periode tersebut. | Equipment failure (breakdowns) | Number of events | 151 events | Single extractor |
breakdown (PM01)Show verbatim quote (Gambar 4)Kejadian break down masih terjadi sejumlah 151 kejadian dengan durasi rata-rata 5,5 jam dalam periode tersebut. | Equipment failure (breakdowns) | Mean event duration | 5.50 jam | Single extractor |
condition based maintenance (PM02)Show verbatim quote (Gambar 4)Kegiatan PM 02 memerlukan waktu rata-rata 13,6 jam. | Planned downtime (scheduled maintenance, breaks, no demand) | Mean event duration | 13.6 jam | Single extractor |
planned maintenance (PM03) tidak dilaksanakanShow verbatim quote (Gambar 4)Gambar 4 menunjukkan bahwa ada 517 aktivitas PM 03 yang direncanakan, tetapi tidak dilaksanakan karena tidak adanya material consumable, peralatan, teknisi atau ditunda karena pabrik tidak bisa berhenti. | Planned downtime (scheduled maintenance, breaks, no demand) | Number of events | 517 activities | Single extractor |
planned maintenance (PM03)Show verbatim quote (Gambar 4)Data ini menunjukkan juga bahwa rata-rata waktu yang dibutuhkan untuk melakukan PM03 hanya 37 menit. | Planned downtime (scheduled maintenance, breaks, no demand) | Mean event duration | 37.0 min | Single extractor |
normal wear and tearShow verbatim quote (Gambar 5)Kerusakan mesin 80,44% terjadi karena adanya kerusakan komponen yang masuk kategori normal wear and tear atau aus karena umur pakainya. | Equipment failure (breakdowns) | Share of loss events | 80.4 % | Single extractor |
Observation units
- Area kerja dryer-cooler · Drying · Baseline
- Pabrik gula PT. XYZ (whole plant) · Whole line or unspecified equipment · Baseline