Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ)

Open source

1Bibliographic record

Authors
Sigit Priyono, Machfud Machfud, Agus Maulana
Year
2019
Venue
Jurnal Aplikasi Bisnis dan Manajemen
Country
Indonesia
Segment
Sugar and confectionery
Process family
Concentration and drying
Study type
Single case study
Extraction scope
Full text
Size
1 plants · — lines · — machines
Observation period
181 days
Data collection
maintenance_records
Intervention
Show the setting as described by the study
PT. XYZ merupakan salah satu perusahaan gula rafinasi terbesar di Indonesia.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
normal wear and teardryer-cooler
Show verbatim quote (Analisis Permasalahan di Area Kerja Kritis)
Penyebab terjadinya kerusakan mesin terbesar adalah kategori normal wear and tear sebanyak 39% dari total kerusakan yang terjadi di area kerja kritis.
Equipment failure (breakdowns)Share of loss events39.0 %Both extractors agreed
—dryer-cooler
Show verbatim quote (Penetapan Area Kerja Kritis)
Total breakdown = 377,38 jam, MTTR = 14,5 jam dan MTBF = 161,3 Jam.
Equipment failure (breakdowns)Time between events161 jamBoth extractors agreed
—dryer-cooler
Show verbatim quote (Penetapan Area Kerja Kritis)
Total breakdown = 377,38 jam, MTTR = 14,5 jam dan MTBF = 161,3 Jam.
Equipment failure (breakdowns)Mean event duration14.5 jamBoth extractors agreed
—dryer-cooler
Show verbatim quote (Penetapan Area Kerja Kritis)
Total breakdown = 377,38 jam, MTTR = 14,5 jam dan MTBF = 161,3 Jam.
Equipment failure (breakdowns)Lost time377 jamBoth extractors agreed
—
Show verbatim quote (Hasil - Pilar Quality Maintenance)
Hasil perhitungan menghasilkan nilai quality rate secara rata-rata semester 1 adalah 98,7% dan sudah mendekati nilai standar yang ditargetkan.
noneQuality98.7 %Both extractors agreed
—
Show verbatim quote (Hasil - Pilar Planned Maintenance)
Performance rate pabrik gula PT. XYZ secara rata-rata semester 1 adalah 69%.
nonePerformance69.0 %Both extractors agreed
—
Show verbatim quote (Hasil - OEE dan Yield / Pilar Planned Maintenance)
Availability secara rata-rata di semester 1 nilainya adalah 82%.
noneAvailability82.0 %Both extractors agreed
lack of cleaning, loose tension, dan lack of lubricationdryer-cooler
Show verbatim quote (Analisis Permasalahan di Area Kerja Kritis)
Penyebab kerusakan kedua sebesar 29% (lack of cleaning, loose tension, dan lack of lubrication) bisa diatasi jika program autonomous maintenance dijalankan.
Equipment failure (breakdowns)Share of loss events29.0 %Both extractors agreed
—
Show verbatim quote (Tabel 2)
OEE (%) 66,84 63,26 62,26 55,27 48,35 42,33 56,44
noneOEE56.4 %Single extractor
—
Show verbatim quote (Tabel 2)
Yield (%) 95,71 94,42 95,37 96,42 94,28 93,29 94,32
noneYield94.3 %Single extractor
breakdown (PM01)
Show verbatim quote (Gambar 4)
Kejadian break down masih terjadi sejumlah 151 kejadian dengan durasi rata-rata 5,5 jam dalam periode tersebut.
Equipment failure (breakdowns)Number of events151 eventsSingle extractor
breakdown (PM01)
Show verbatim quote (Gambar 4)
Kejadian break down masih terjadi sejumlah 151 kejadian dengan durasi rata-rata 5,5 jam dalam periode tersebut.
Equipment failure (breakdowns)Mean event duration5.50 jamSingle extractor
condition based maintenance (PM02)
Show verbatim quote (Gambar 4)
Kegiatan PM 02 memerlukan waktu rata-rata 13,6 jam.
Planned downtime (scheduled maintenance, breaks, no demand)Mean event duration13.6 jamSingle extractor
planned maintenance (PM03) tidak dilaksanakan
Show verbatim quote (Gambar 4)
Gambar 4 menunjukkan bahwa ada 517 aktivitas PM 03 yang direncanakan, tetapi tidak dilaksanakan karena tidak adanya material consumable, peralatan, teknisi atau ditunda karena pabrik tidak bisa berhenti.
Planned downtime (scheduled maintenance, breaks, no demand)Number of events517 activitiesSingle extractor
planned maintenance (PM03)
Show verbatim quote (Gambar 4)
Data ini menunjukkan juga bahwa rata-rata waktu yang dibutuhkan untuk melakukan PM03 hanya 37 menit.
Planned downtime (scheduled maintenance, breaks, no demand)Mean event duration37.0 minSingle extractor
normal wear and tear
Show verbatim quote (Gambar 5)
Kerusakan mesin 80,44% terjadi karena adanya kerusakan komponen yang masuk kategori normal wear and tear atau aus karena umur pakainya.
Equipment failure (breakdowns)Share of loss events80.4 %Single extractor

Observation units

  • Area kerja dryer-cooler · Drying · Baseline
  • Pabrik gula PT. XYZ (whole plant) · Whole line or unspecified equipment · Baseline