Electrical fault in filling/weighing equipment
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 58 % of the line's lost time. Reported by 2 of the 120 studies that could observe it (limited evidence).
What happens
A fault in motors, drives, control relays, wiring or power supply interrupts normal operation of the filler or scale, causing the machine to stop until the electrical circuit or component is restored. This may also manifest as loss of calibration signal integrity in load cells or sensors, which the control system interprets as a fault condition.
What is done about it
Implement preventive electrical maintenance including periodic inspection of wiring, contacts and drives, scheduled recalibration and verification of weighing/load-cell circuits, and use of surge protection or redundant power supplies to reduce fault recurrence.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.8% [0.2–1.8%]
- Expected share of lost time
- 0.4% [0.1–1.1%]
- Share of lost time when present
- 58% [47–68%]
- Studies / units
- 120 / 162
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products0.8% [0.1–2.8%]18 studies
- Soft drinks, bottled water and juices0.9% [0.1–2.6%]44 studies
- Brewing, wine and spirits1.2% [0.2–3.8%]16 studies
- Bakery and pasta0.9% [0.1–3.3%]0 studies
- Meat, poultry and seafood0.9% [0.1–3.0%]6 studies
- Fruit and vegetable processing0.9% [0.1–3.3%]4 studies
- Grain and oilseed milling0.9% [0.1–3.0%]6 studies
- Sugar and confectionery0.9% [0.1–3.2%]3 studies
- Snacks, coffee, tea and other foods0.9% [0.1–3.0%]6 studies
- Animal feed and pet food0.9% [0.1–3.1%]4 studies
- Food manufacturing (unspecified or mixed)0.8% [0.1–2.7%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceA fault in motors, drives, control relays, wiring or power supply interrupts normal operation of the filler or scale, causing the machine to stop until the electrical circuit or component is restored. This may also manifest as loss of calibration signal integrity in load cells or sensors, which the control system interprets as a fault condition.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show an unplanned stop state with an electrical or fault alarm code tagged to the filler or scale, often preceded by erratic sensor or load-cell readings, voltage/current fluctuations, or communication dropouts; the stop duration is irregular and ends only after a maintenance reset or repair event is logged.
Countermeasure
Engineering guidanceImplement preventive electrical maintenance including periodic inspection of wiring, contacts and drives, scheduled recalibration and verification of weighing/load-cell circuits, and use of surge protection or redundant power supplies to reduce fault recurrence.
4Sources
- Share of loss events: 67.0 % · as reported: “Scale calibration and electrical failures”
Show verbatim quote
os problemas com a balança representavam 67 % das paradas na enchedora, e destes problemas, os elétricos representavam 98 % das paradas
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceTime between events: 171 h · as reported: “electrical failure”
Show verbatim quote
Furthermore, the mechanical MTBF increased from 98.74 h to 117.25 h, while the electrical MTBF increased from 144.31 h to 170.55 h.
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceMean event duration: 5.17 h · as reported: “electrical failure”
Show verbatim quote
the electrical MTTR decreased from 7.20 h to 5.17 h
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceTime between events: 144 h · as reported: “electrical failure”
Show verbatim quote
Furthermore, the mechanical MTBF increased from 98.74 h to 117.25 h, while the electrical MTBF increased from 144.31 h to 170.55 h.
- Proposal to Improve the Operational Availability of the Canning Machine in a Craft Brewery through the Application of Work Study, SMED, and Planned Maintenance (2026)Open sourceMean event duration: 7.20 h · as reported: “electrical failure”
Show verbatim quote
the electrical MTTR decreased from 7.20 h to 5.17 h