Equipment installation time during changeover
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 0 of the 127 studies that could observe it (sparse evidence).
What happens
Production stops while new tooling, modules, or line equipment are physically mounted, connected and aligned before the next run can begin. This installation work is a required step within the changeover sequence and adds non-productive time on top of the strict product-to-product switch, especially when new or pilot equipment must be fitted into the existing line.
What is done about it
Standardize installation procedures with pre-staged modules, quick-connect fixtures and checklists to shorten mounting and alignment steps, and plan installation work during scheduled non-production windows whenever possible. Track installation time as a distinct changeover sub-component to identify design or logistics improvements that reduce it over successive installations.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.3% [0.1–1.0%]
- Expected share of lost time
- 0.2% [0.0–0.6%]
- Share of lost time when present
- 56% [44–67%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.5%]13 studies
- Soft drinks, bottled water and juices0.4% [0.0–1.3%]26 studies
- Brewing, wine and spirits0.4% [0.0–1.5%]11 studies
- Bakery and pasta0.4% [0.0–1.4%]24 studies
- Meat, poultry and seafood0.4% [0.0–1.6%]9 studies
- Fruit and vegetable processing0.4% [0.0–1.5%]7 studies
- Grain and oilseed milling0.4% [0.0–1.5%]6 studies
- Sugar and confectionery0.4% [0.0–1.5%]9 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.5%]5 studies
- Animal feed and pet food0.4% [0.0–1.4%]7 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.5%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceProduction stops while new tooling, modules, or line equipment are physically mounted, connected and aligned before the next run can begin. This installation work is a required step within the changeover sequence and adds non-productive time on top of the strict product-to-product switch, especially when new or pilot equipment must be fitted into the existing line.
How it looks in SCADA data
Engineering guidanceMES/SCADA shows an extended changeover or downtime state with no production counts, often logged under a maintenance or engineering work order rather than a standard format-change code; the line state duration is longer and more variable than routine changeovers and recurs on a monthly or project basis rather than per batch.
Countermeasure
Engineering guidanceStandardize installation procedures with pre-staged modules, quick-connect fixtures and checklists to shorten mounting and alignment steps, and plan installation work during scheduled non-production windows whenever possible. Track installation time as a distinct changeover sub-component to identify design or logistics improvements that reduce it over successive installations.
4Sources
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceLost time: 31.2 not reported · as reported: “Average Monthly installation time (2021)”
Show verbatim quote
Month 1 31.17 22 18.5 41%
- Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies (2024)Open sourceLost time: 18.5 not reported · as reported: “Pilot test average monthly installation time”
Show verbatim quote
Month 1 31.17 22 18.5 41%