foratvise
Get Started
Included study

Enhancing Machinery Availability in a Food Company: An Integrated Approach Using TPM, SMED, and RCM Methodologies

Open source

1Bibliographic record

Authors
Sair Castañeda, Sharon Rodriguez, Orkun Yildiz, Duilio Aranda, José C. Alvarez
Year
2024
Venue
Social Science Research Network
Country
Peru
Segment
Sugar and confectionery
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 2 machines
Observation period
60 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The company under study belongs to the food industry in Lima, Peru. It has five production lines: Chocolate Line, Confectionery, Instant Products, Cereals and Milling.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Inconsistencies above 10 percentage points, or OEE factors above 100%.0 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Conclusion)
resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance)
Equipment failure (breakdowns)Mean event duration8.72 hBoth extractors agreed
—
Show verbatim quote (Conclusion)
resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance)
Equipment failure (breakdowns)Time between events34.9 hBoth extractors agreed
—
Show verbatim quote (Discussion (Section 5))
availability increases by 12.10%; initially, this parameter presented a percentage of 79.06%, and after the implementation, a value equal to 89.37% was obtained.
noneAvailability89.4 %Both extractors agreed
—
Show verbatim quote (Conclusion)
resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance)
Equipment failure (breakdowns)Mean event duration7.72 hBoth extractors agreed
—
Show verbatim quote (Conclusion)
resulting in the optimization of the values of the MTBF MTTR indicators from 29.23 to 34.94 and from 7.72 to 8.72, respectively, with the application of the first pillar of TPM (Autonomous Maintenance)
Equipment failure (breakdowns)Time between events29.2 hBoth extractors agreed
—
Show verbatim quote (Section 4.1)
a gap in machinery availability has been identified, with the company under study reporting a value of 79.06%; however, the industry reflects that the value is acceptable greater than 90%.
noneAvailability79.1 %Both extractors agreed
—
Show verbatim quote (Section 3.3.3)
Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%); and it is intended to reach an equal value of 85.02%
noneQuality95.2 %Both extractors agreed
—
Show verbatim quote (Section 3.3.3)
Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%); and it is intended to reach an equal value of 85.02%
nonePerformance94.9 %Both extractors agreed
—
Show verbatim quote (Table 1)
OEE 78.05% 90.00% 11.95 pp
noneOEE78.1 %Both extractors agreed
Internal activities time (final)
Show verbatim quote (Section 4.3.2 Phase 4)
At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively.
Setup and adjustmentsLost time25.6 minBoth extractors agreed
Hours of preventive maintenance (scheduled), Month 2
Show verbatim quote (Table 7)
Month 2 12.00 20.00 8.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time12.0 hBoth extractors agreed
Hours of preventive maintenance (scheduled), Month 1
Show verbatim quote (Table 7)
Month 1 14.00 25.00 11.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time14.0 hBoth extractors agreed
Hours of factual preventive maintenance, Month 2
Show verbatim quote (Table 7)
Month 2 12.00 20.00 8.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time20.0 hBoth extractors agreed
Hours of factual preventive maintenance, Month 1
Show verbatim quote (Table 7)
Month 1 14.00 25.00 11.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time25.0 hBoth extractors agreed
—
Show verbatim quote (Section 3.3.3)
Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%); and it is intended to reach an equal value of 85.02%
noneOEE70.5 %Single extractor
—
Show verbatim quote (Section 3.3.3)
Currently, there is 70.48% and its parameters of availability (78.05%), performance (94.86%) and quality (95.19%); and it is intended to reach an equal value of 85.02%
noneAvailability78.1 %Single extractor
Average Monthly installation time (2021)
Show verbatim quote (Table 8)
Month 1 31.17 22 18.5 41%
Setup and adjustmentsLost time31.2 not reportedSingle extractor
Total production time of changeover activities
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsLost time148 minSingle extractor
Internal activities
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsNumber of events15.0 eventsSingle extractor
External activities
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsNumber of events23.0 eventsSingle extractor
Internal activities time
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsLost time63.2 minSingle extractor
External activities time
Show verbatim quote (Table 4)
147.54 15 23 63.22 84.32
Setup and adjustmentsLost time84.3 minSingle extractor
Pilot test average monthly installation time
Show verbatim quote (Table 8)
Month 1 31.17 22 18.5 41%
Setup and adjustmentsLost time18.5 not reportedSingle extractor
Final process time after SMED implementation
Show verbatim quote (Section 4.3.2 Phase 4)
At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively.
Setup and adjustmentsLost time106 minSingle extractor
External activities (final)
Show verbatim quote (Section 4.3.2 Phase 4)
At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively.
Setup and adjustmentsNumber of events25.0 eventsSingle extractor
External activities time (final)
Show verbatim quote (Section 4.3.2 Phase 4)
At the end of the activities, a final process time of 105.69 minutes was obtained, with eight internal and 25 external activities, each with a time of 25.62 and 80.07 minutes, respectively.
Setup and adjustmentsLost time80.1 minSingle extractor
Extra hours, Month 1
Show verbatim quote (Table 7)
Month 1 14.00 25.00 11.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time11.0 hSingle extractor
Extra hours, Month 2
Show verbatim quote (Table 7)
Month 2 12.00 20.00 8.00
Planned downtime (scheduled maintenance, breaks, no demand)Lost time8.00 hSingle extractor
Breakdowns in the Machinery
Show verbatim quote (Table 9)
Breakdowns in the Machinery | 12.20% | 39.25%
Equipment failure (breakdowns)Share of loss events12.2 %Single extractor
Breakdowns due to human errors in calibration or operation
Show verbatim quote (Table 9)
Breakdowns due to human errors in calibration or operation | 8.47% | 38.38%
Idling and minor stops (micro-stops)Share of loss events8.47 %Single extractor

Observation units

  • Confectionery line · Whole line or unspecified equipment · After intervention