foratvise
Get Started
Equipment failure (breakdowns)

Filler product bowl malfunction

Equipment failure (breakdowns)AvailabilityFilling

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 0 of the 120 studies that could observe it (sparse evidence).

What happens

The product bowl that feeds product to the filling heads develops a mechanical or sensor fault (level sensor, valve, seal, agitator or drive) that disrupts the supply of product to the filler. This either stops the filler outright or leaves product flowing in an inconsistent, non-uniform state so that the fill delivered to each container is incorrect.

What is done about it

Apply preventive maintenance to the bowl's level sensors, seals, agitator and drive, and recalibrate the level control loop so product supply to the filling valves remains stable. Inspect and replace worn components during scheduled stops and add condition monitoring on the bowl subsystem to catch degradation before it causes a stop or a fill defect.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.4% [0.1–1.1%]
Expected share of lost time
0.2% [0.0–0.7%]
Share of lost time when present
57% [46–67%]
Studies / units
120 / 162
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.4% [0.0–1.7%]18 studies
  • Soft drinks, bottled water and juices
    0.4% [0.0–1.4%]44 studies
  • Brewing, wine and spirits
    0.4% [0.0–1.7%]16 studies
  • Bakery and pasta
    0.5% [0.0–1.8%]0 studies
  • Meat, poultry and seafood
    0.5% [0.0–1.6%]6 studies
  • Fruit and vegetable processing
    0.5% [0.0–1.9%]4 studies
  • Grain and oilseed milling
    0.5% [0.0–1.8%]6 studies
  • Sugar and confectionery
    0.5% [0.0–1.7%]3 studies
  • Snacks, coffee, tea and other foods
    0.5% [0.0–1.8%]6 studies
  • Animal feed and pet food
    0.5% [0.0–1.8%]4 studies
  • Food manufacturing (unspecified or mixed)
    0.4% [0.0–1.7%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The product bowl that feeds product to the filling heads develops a mechanical or sensor fault (level sensor, valve, seal, agitator or drive) that disrupts the supply of product to the filler. This either stops the filler outright or leaves product flowing in an inconsistent, non-uniform state so that the fill delivered to each container is incorrect.

How it looks in SCADA data

Engineering guidance

Level or pressure alarms on the bowl precede filler stopped-state events, with the filler fault code pointing to the bowl/hopper subsystem rather than the dosing valves themselves. Fill-weight or fill-volume trend data shows drift or out-of-tolerance readings time-correlated with bowl low/high level or agitator fault flags, and upstream/downstream conveyors show starvation or blocking consistent with the filler stop.

Countermeasure

Engineering guidance

Apply preventive maintenance to the bowl's level sensors, seals, agitator and drive, and recalibrate the level control loop so product supply to the filling valves remains stable. Inspect and replace worn components during scheduled stops and add condition monitoring on the bowl subsystem to catch degradation before it causes a stop or a fill defect.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 165 min · as reported: “product bowl”
    Show verbatim quote
    product bowl 1 165 112 3516 100 100
  2. Number of events: 1.00 events · as reported: “product bowl”
    Show verbatim quote
    product bowl 1 165 112 3516 100 100
  3. Lost time: 30.0 kg · as reported: “defect product”
    Show verbatim quote
    The losses from defect products caused by the disruption of the production process and the reduction in the production volume amounted to LDP = 30 kg.
  4. Specific energy: 213 Wh/1000 Bottles · as reported: “Production”
    Show verbatim quote
    Production 119 4290.2 117 212.8 121 581.6