1Bibliographic record
- Authors
- M. B. Smirnov, Galiya Abdilova
- Year
- 2021
- Venue
- Theory and practice of meat processing
- Country
- Kazakhstan
- Segment
- Meat, poultry and seafood
- Process family
- Forming, baking and cooking
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · — lines · 1 machines
- Observation period
- 1 days
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
In order to identify losses associated with the operation of the equipment, the operation of vacuum filler for stuffing sausages, installed at one of the small company of the city, was studied and analyzed.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—vacuum fillerShow verbatim quote (Figure 6)Current productivity (CP) is equal to CP = PP – SD = 800 kg. – 192 kg. = 608 kg. | none | Throughput | 608 kg | Both extractors agreed |
Readjustment of equipment; Interruptions in the supply of raw materialsvacuum fillerShow verbatim quote (Figure 5)Downtime (Dt) – ПР = 82 min.: Readjustment of equipment; Interruptions in the supply of raw materials. | Not classifiable from the report | Lost time | 82.0 min | Both extractors agreed |
—vacuum fillerShow verbatim quote (Abstract)The availability index is 0.79, the productivity index is 0.76, and the product quality index is 0.95. | none | Availability | 0.790 fraction | Single extractor |
—vacuum fillerShow verbatim quote (Abstract)The availability index is 0.79, the productivity index is 0.76, and the product quality index is 0.95. | none | Performance | 0.760 fraction | Single extractor |
—vacuum fillerShow verbatim quote (Abstract)The availability index is 0.79, the productivity index is 0.76, and the product quality index is 0.95. | none | Quality | 0.950 fraction | Single extractor |
—vacuum fillerShow verbatim quote (Abstract)the overall equipment effectiveness (OEE) accounts for 57% | none | OEE | 57.0 % | Single extractor |
Short breaksvacuum fillerShow verbatim quote (Figure 5)Short breaks (ShB) 2 times per 15 min. – 30 min. | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 30.0 min | Single extractor |
Lunchvacuum fillerShow verbatim quote (Figure 5)Lunch (L) 1 times per 60 min. – 60 min. | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 60.0 min | Single extractor |
Idle operation with short-term stops of the equipment; Running of the equipment at a decreased speedvacuum fillerShow verbatim quote (Figure 6)The loss in speed during the operation of the equipment led to a decrease in productivity by 192 kg., i.е. SD = 192 kg. | Reduced speed | Lost time | 192 kg | Single extractor |
defect productvacuum fillerShow verbatim quote (Figure 7)The losses from defect products caused by the disruption of the production process and the reduction in the production volume amounted to LDP = 30 kg. | Process defects (scrap and rework) | Lost time | 30.0 kg | Single extractor |
Observation units
- Vacuum filler (sausage stuffer) · Filling · Baseline