In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 59 % of the line's lost time. Reported by 1 of the 86 studies that could observe it (sparse evidence).
What happens
Product or containers require a finite travel time on conveyors or transfer paths between successive stations of the line, and this transit interval is counted as line time even though no processing occurs. The loss appears when conveyor layout, distance, or accumulation buffers make this transport interval long relative to the processing cycle, effectively idling downstream equipment while material is in transit.
What is done about it
Redesign conveyor layout to shorten transport paths and align conveyor speeds with upstream and downstream cycle times, adding buffering or accumulation sections where needed to decouple transit time from processing rate. Line balancing studies and relocation of equipment to reduce travel distance are the typical engineering response.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.7% [0.1–1.9%]
- Expected share of lost time
- 0.4% [0.1–1.2%]
- Share of lost time when present
- 59% [49–71%]
- Studies / units
- 86 / 112
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.7% [0.1–2.6%]11 studies
- Soft drinks, bottled water and juices0.6% [0.1–2.3%]28 studies
- Brewing, wine and spirits0.7% [0.1–2.5%]12 studies
- Bakery and pasta0.8% [0.1–3.0%]0 studies
- Meat, poultry and seafood1.1% [0.1–4.4%]5 studies
- Fruit and vegetable processing0.8% [0.1–3.0%]4 studies
- Grain and oilseed milling0.8% [0.1–3.1%]4 studies
- Sugar and confectionery0.8% [0.1–3.1%]4 studies
- Snacks, coffee, tea and other foods0.8% [0.1–3.0%]4 studies
- Animal feed and pet food0.8% [0.1–3.0%]5 studies
- Food manufacturing (unspecified or mixed)0.8% [0.1–2.9%]9 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceProduct or containers require a finite travel time on conveyors or transfer paths between successive stations of the line, and this transit interval is counted as line time even though no processing occurs. The loss appears when conveyor layout, distance, or accumulation buffers make this transport interval long relative to the processing cycle, effectively idling downstream equipment while material is in transit.
How it looks in SCADA data
Engineering guidanceLogs show a distinct conveying or transit machine-state with a duration that does not correspond to any processing alarm, often paired with downstream starvation (waiting-for-material) states and upstream blocking states. No fault code is raised, and the pattern recurs cyclically with the line's material flow rather than as discrete stoppage events.
Countermeasure
Engineering guidanceRedesign conveyor layout to shorten transport paths and align conveyor speeds with upstream and downstream cycle times, adding buffering or accumulation sections where needed to decouple transit time from processing rate. Line balancing studies and relocation of equipment to reduce travel distance are the typical engineering response.
4Sources
- Using Lean Manufacturing Approach for Improvement in Food Manufacturing: Case Study from Egypt (2024)Open sourceLost time: 10.0 min · as reported: “Transportation time”
Show verbatim quote
For the automated line, a reduction from 10 to 5 min was achieved which represents improvement by 50% in the transportation time.