Using Lean Manufacturing Approach for Improvement in Food Manufacturing: Case Study from Egypt

Open source

1Bibliographic record

Authors
Noha A. Mostafa, Karim Ahmed
Year
2024
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Egypt
Segment
Meat, poultry and seafood
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
The processed meat production line was selected for the study as it has the largest market share.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Install new plastic packagesfiller machine
Show verbatim quote (Table 1)
Install new plastic packages 2 min 17 min Internal
Setup and adjustmentsLost time2.00 minBoth extractors agreed
Transport die to the machinefiller machine
Show verbatim quote (Table 1)
Transport die to the machine 2 min 4 min External
Setup and adjustmentsLost time2.00 minBoth extractors agreed
Check on first piecefiller machine
Show verbatim quote (Table 1)
Check on first piece 0.5 min 17.5 min External
Setup and adjustmentsLost time0.500 minBoth extractors agreed
Program the machinefiller machine
Show verbatim quote (Table 1)
Program the machine 5 min 15 min Internal
Setup and adjustmentsLost time5.00 minBoth extractors agreed
Change machine diefiller machine
Show verbatim quote (Table 1)
Change machine die 6 min 10 min Internal
Setup and adjustmentsLost time6.00 minBoth extractors agreed
Search for new diefiller machine
Show verbatim quote (Table 1)
Search for new die 2 min 2 min External
Setup and adjustmentsLost time2.00 minBoth extractors agreed
Documentationfiller machine
Show verbatim quote (Table 1)
Documentation 0.5 min 18 min External
Setup and adjustmentsLost time0.500 minBoth extractors agreed
Total waiting time
Show verbatim quote (Section 4.1)
The total processing time was 1619 minutes, the total waiting time was 53 minutes, and the total lead time was 1672 minutes.
Not classifiable from the reportLost time53.0 minBoth extractors agreed
Total time of setupfiller machine
Show verbatim quote (Table 3)
Initial 18 11
Setup and adjustmentsLost time18.0 minSingle extractor
Internal tasks timefiller machine
Show verbatim quote (Table 3)
Initial 18 11
Setup and adjustmentsLost time11.0 minSingle extractor
Change machine diefiller machine
Show verbatim quote (Section 4.2.1)
The total changeover time is 18 min and changing the die takes almost 33% of this time while programming the machine takes 27%.
Setup and adjustmentsShare of lost time33.0 %Single extractor
Program the machinefiller machine
Show verbatim quote (Section 4.2.1)
The total changeover time is 18 min and changing the die takes almost 33% of this time while programming the machine takes 27%.
Setup and adjustmentsShare of lost time27.0 %Single extractor
Transportation time
Show verbatim quote (Abstract)
For the automated line, a reduction from 10 to 5 min was achieved which represents improvement by 50% in the transportation time.
Not classifiable from the reportLost time10.0 minSingle extractor
Unpacking cycle time
Show verbatim quote (Section 4.3)
This led to reduce the unpacking cycle time to 8 min instead of 12 min.
Not classifiable from the reportLost time12.0 minSingle extractor
—filling machine
Show verbatim quote (Page 7, Section 4.2.1)
The total changeover time is 18 min and changing the die takes almost 33% of this time while programming the machine takes 27%.
Setup and adjustmentsLost time18.0 minSingle extractor
—
Show verbatim quote (Section 4.1 Current state VSM, Page 5)
the total lead time was 1672 minutes
noneThroughput1,672 minSingle extractor
—
Show verbatim quote (Section 4.1 Current state VSM, Page 5)
The total processing time was 1619 minutes
noneThroughput1,619 minSingle extractor
—unpacking
Show verbatim quote (Section 4.3 Mapping Future State, Page 10)
This led to reducing the unpacking cycle time to 8 min instead of 12 min.
noneThroughput12.0 minSingle extractor
—automated conveyor transport
Show verbatim quote (Abstract, Page 1)
For the automated line, a reduction from 10 to 5 min was achieved which represents improvement by 50% in the transportation time.
noneThroughput10.0 minSingle extractor
—filling machine
Show verbatim quote (Abstract, Page 1)
After applying Single Minute Exchange of die, it was found that changeover time was reduced from 18 to 11 min
Setup and adjustmentsLost time11.0 minSingle extractor
Search for new diefilling machine
Show verbatim quote (Table 2, Page 8)
Search for new die | 2 min | 2 min | External
Setup and adjustmentsLost time2.00 minSingle extractor
Transport die to the machinefilling machine
Show verbatim quote (Table 2, Page 8)
Transport die to the machine | 2 min | 4 min | External
Setup and adjustmentsLost time2.00 minSingle extractor
Change machine diefilling machine
Show verbatim quote (Table 2, Page 8)
Change machine die | 2 min | 6 min | Internal
Setup and adjustmentsLost time2.00 minSingle extractor
Programming machinefilling machine
Show verbatim quote (Table 2, Page 8)
Programming machine | 1 min | 8 min | Internal
Setup and adjustmentsLost time1.00 minSingle extractor
Install new plastic packagesfilling machine
Show verbatim quote (Table 2, Page 8)
Install new plastic packages | 2 min | 10 min | Internal
Setup and adjustmentsLost time2.00 minSingle extractor
Check on first piecefilling machine
Show verbatim quote (Table 2, Page 8)
Check on first piece | 0.5 min | 10.5 min | External
Setup and adjustmentsLost time0.500 minSingle extractor
Documentation papersfilling machine
Show verbatim quote (Table 2, Page 8)
Documentation papers | 0.5 min | 11 min | External
Setup and adjustmentsLost time0.500 minSingle extractor
—
Show verbatim quote (Section 4.3 Mapping Future State, Page 10)
The new total processing time is 1615 minutes, the new total waiting time is 48 minutes, and the new total lead time was 1663 minutes.
Not classifiable from the reportLost time48.0 minSingle extractor
—
Show verbatim quote (Section 4.3 Mapping Future State, Page 10)
the new total lead time was 1663 minutes
noneThroughput1,663 minSingle extractor
—
Show verbatim quote (Section 4.3 Mapping Future State, Page 10)
The new total processing time is 1615 minutes
noneThroughput1,615 minSingle extractor
—unpacking
Show verbatim quote (Section 4.3 Mapping Future State, Page 10)
This led to reducing the unpacking cycle time to 8 min instead of 12 min.
noneThroughput8.00 minSingle extractor
—automated conveyor transport
Show verbatim quote (Abstract, Page 1)
For the automated line, a reduction from 10 to 5 min was achieved which represents improvement by 50% in the transportation time.
noneThroughput5.00 minSingle extractor

Observation units

  • Filler machine · Filling · Baseline
  • Processed meat production line · Whole line or unspecified equipment · Baseline
  • Automated material handling line · Conveying and accumulation · Baseline
  • Raw meat unpacking area · Whole line or unspecified equipment · Baseline
  • Processed meat production line · Whole line or unspecified equipment · After intervention