Included study
Using Lean Manufacturing Approach for Improvement in Food Manufacturing: Case Study from Egypt
1Bibliographic record
- Authors
- Noha A. Mostafa, Karim Ahmed
- Year
- 2024
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Egypt
- Segment
- Meat, poultry and seafood
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
The processed meat production line was selected for the study as it has the largest market share.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Install new plastic packagesfiller machineShow verbatim quote (Table 1)Install new plastic packages 2 min 17 min Internal | Setup and adjustments | Lost time | 2.00 min | Both extractors agreed |
Transport die to the machinefiller machineShow verbatim quote (Table 1)Transport die to the machine 2 min 4 min External | Setup and adjustments | Lost time | 2.00 min | Both extractors agreed |
Check on first piecefiller machineShow verbatim quote (Table 1)Check on first piece 0.5 min 17.5 min External | Setup and adjustments | Lost time | 0.500 min | Both extractors agreed |
Program the machinefiller machineShow verbatim quote (Table 1)Program the machine 5 min 15 min Internal | Setup and adjustments | Lost time | 5.00 min | Both extractors agreed |
Change machine diefiller machineShow verbatim quote (Table 1)Change machine die 6 min 10 min Internal | Setup and adjustments | Lost time | 6.00 min | Both extractors agreed |
Search for new diefiller machineShow verbatim quote (Table 1)Search for new die 2 min 2 min External | Setup and adjustments | Lost time | 2.00 min | Both extractors agreed |
Documentationfiller machineShow verbatim quote (Table 1)Documentation 0.5 min 18 min External | Setup and adjustments | Lost time | 0.500 min | Both extractors agreed |
Total waiting timeShow verbatim quote (Section 4.1)The total processing time was 1619 minutes, the total waiting time was 53 minutes, and the total lead time was 1672 minutes. | Not classifiable from the report | Lost time | 53.0 min | Both extractors agreed |
Total time of setupfiller machineShow verbatim quote (Table 3)Initial 18 11 | Setup and adjustments | Lost time | 18.0 min | Single extractor |
Internal tasks timefiller machineShow verbatim quote (Table 3)Initial 18 11 | Setup and adjustments | Lost time | 11.0 min | Single extractor |
Change machine diefiller machineShow verbatim quote (Section 4.2.1)The total changeover time is 18 min and changing the die takes almost 33% of this time while programming the machine takes 27%. | Setup and adjustments | Share of lost time | 33.0 % | Single extractor |
Program the machinefiller machineShow verbatim quote (Section 4.2.1)The total changeover time is 18 min and changing the die takes almost 33% of this time while programming the machine takes 27%. | Setup and adjustments | Share of lost time | 27.0 % | Single extractor |
Transportation timeShow verbatim quote (Abstract)For the automated line, a reduction from 10 to 5 min was achieved which represents improvement by 50% in the transportation time. | Not classifiable from the report | Lost time | 10.0 min | Single extractor |
Unpacking cycle timeShow verbatim quote (Section 4.3)This led to reduce the unpacking cycle time to 8 min instead of 12 min. | Not classifiable from the report | Lost time | 12.0 min | Single extractor |
—filling machineShow verbatim quote (Page 7, Section 4.2.1)The total changeover time is 18 min and changing the die takes almost 33% of this time while programming the machine takes 27%. | Setup and adjustments | Lost time | 18.0 min | Single extractor |
—Show verbatim quote (Section 4.1 Current state VSM, Page 5)the total lead time was 1672 minutes | none | Throughput | 1,672 min | Single extractor |
—Show verbatim quote (Section 4.1 Current state VSM, Page 5)The total processing time was 1619 minutes | none | Throughput | 1,619 min | Single extractor |
—unpackingShow verbatim quote (Section 4.3 Mapping Future State, Page 10)This led to reducing the unpacking cycle time to 8 min instead of 12 min. | none | Throughput | 12.0 min | Single extractor |
—automated conveyor transportShow verbatim quote (Abstract, Page 1)For the automated line, a reduction from 10 to 5 min was achieved which represents improvement by 50% in the transportation time. | none | Throughput | 10.0 min | Single extractor |
—filling machineShow verbatim quote (Abstract, Page 1)After applying Single Minute Exchange of die, it was found that changeover time was reduced from 18 to 11 min | Setup and adjustments | Lost time | 11.0 min | Single extractor |
Search for new diefilling machineShow verbatim quote (Table 2, Page 8)Search for new die | 2 min | 2 min | External | Setup and adjustments | Lost time | 2.00 min | Single extractor |
Transport die to the machinefilling machineShow verbatim quote (Table 2, Page 8)Transport die to the machine | 2 min | 4 min | External | Setup and adjustments | Lost time | 2.00 min | Single extractor |
Change machine diefilling machineShow verbatim quote (Table 2, Page 8)Change machine die | 2 min | 6 min | Internal | Setup and adjustments | Lost time | 2.00 min | Single extractor |
Programming machinefilling machineShow verbatim quote (Table 2, Page 8)Programming machine | 1 min | 8 min | Internal | Setup and adjustments | Lost time | 1.00 min | Single extractor |
Install new plastic packagesfilling machineShow verbatim quote (Table 2, Page 8)Install new plastic packages | 2 min | 10 min | Internal | Setup and adjustments | Lost time | 2.00 min | Single extractor |
Check on first piecefilling machineShow verbatim quote (Table 2, Page 8)Check on first piece | 0.5 min | 10.5 min | External | Setup and adjustments | Lost time | 0.500 min | Single extractor |
Documentation papersfilling machineShow verbatim quote (Table 2, Page 8)Documentation papers | 0.5 min | 11 min | External | Setup and adjustments | Lost time | 0.500 min | Single extractor |
—Show verbatim quote (Section 4.3 Mapping Future State, Page 10)The new total processing time is 1615 minutes, the new total waiting time is 48 minutes, and the new total lead time was 1663 minutes. | Not classifiable from the report | Lost time | 48.0 min | Single extractor |
—Show verbatim quote (Section 4.3 Mapping Future State, Page 10)the new total lead time was 1663 minutes | none | Throughput | 1,663 min | Single extractor |
—Show verbatim quote (Section 4.3 Mapping Future State, Page 10)The new total processing time is 1615 minutes | none | Throughput | 1,615 min | Single extractor |
—unpackingShow verbatim quote (Section 4.3 Mapping Future State, Page 10)This led to reducing the unpacking cycle time to 8 min instead of 12 min. | none | Throughput | 8.00 min | Single extractor |
—automated conveyor transportShow verbatim quote (Abstract, Page 1)For the automated line, a reduction from 10 to 5 min was achieved which represents improvement by 50% in the transportation time. | none | Throughput | 5.00 min | Single extractor |
Observation units
- Filler machine · Filling · Baseline
- Processed meat production line · Whole line or unspecified equipment · Baseline
- Automated material handling line · Conveying and accumulation · Baseline
- Raw meat unpacking area · Whole line or unspecified equipment · Baseline
- Processed meat production line · Whole line or unspecified equipment · After intervention