Manual transfer of product trays to cold storage

Setup and adjustmentsAvailabilityWhole line or unspecified equipment

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).

What happens

At the end of a run or during a changeover, operators must physically move trays of finished or semi-finished product from the line to the cold storage area before the next production step or format can start. This manual material-handling task is on the critical path of the transition and adds non-value-adding time to the changeover.

What is done about it

Decouple the tray transfer from the critical changeover path by assigning dedicated logistics personnel or using conveyors, carts or AGVs that can move product to cold storage in parallel with other setup tasks, and standardize the handover sequence so the line can start the next step without waiting for storage to be cleared.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.5% [0.1–1.3%]
Expected share of lost time
0.3% [0.1–0.7%]
Share of lost time when present
57% [45–67%]
Studies / units
127 / 161
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.6% [0.1–2.1%]13 studies
  • Soft drinks, bottled water and juices
    0.5% [0.1–1.7%]26 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.0%]11 studies
  • Bakery and pasta
    0.5% [0.1–1.9%]24 studies
  • Meat, poultry and seafood
    0.6% [0.1–2.1%]9 studies
  • Fruit and vegetable processing
    0.6% [0.1–2.3%]7 studies
  • Grain and oilseed milling
    0.6% [0.1–2.2%]6 studies
  • Sugar and confectionery
    0.6% [0.1–2.2%]9 studies
  • Snacks, coffee, tea and other foods
    0.6% [0.1–2.1%]5 studies
  • Animal feed and pet food
    0.8% [0.1–3.0%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.6% [0.1–2.0%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

At the end of a run or during a changeover, operators must physically move trays of finished or semi-finished product from the line to the cold storage area before the next production step or format can start. This manual material-handling task is on the critical path of the transition and adds non-value-adding time to the changeover.

How it looks in SCADA data

Engineering guidance

The line remains in a changeover or idle state for longer than the logged machine-level setup activities would explain, with no equipment fault or alarm recorded; operator or MES event logs show a manual transfer or logistics task bridging the gap between last-good-unit and first-good-unit timestamps.

Countermeasure

Engineering guidance

Decouple the tray transfer from the critical changeover path by assigning dedicated logistics personnel or using conveyors, carts or AGVs that can move product to cold storage in parallel with other setup tasks, and standardize the handover sequence so the line can start the next step without waiting for storage to be cleared.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Mean event duration: 4.58 min · as reported: “Move trays to cold storage”
    Show verbatim quote
    Move trays to cold storage 4.58 Internal Internal
  2. Lost time: 4.58 min · as reported: “Move trays to cold storage”
    Show verbatim quote
    Move trays to cold storage 4.58