Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant
1Bibliographic record
- Authors
- Maria Clara Orellana Vazconez, Fabiana Almendra Villa Huamaní, Rafael Mauricio Villanueva Flores, Roberto Alexander Minaya Villavicencio
- Year
- 2026
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Animal feed and pet food
- Process family
- Mixing and formulation
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Currently, the plant yields 3 batches daily and operates at a labor productivity rate of 8.29 kg/man-hour.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 6High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown. | 0 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Show verbatim quote (Table 1)Productivity 3 batches 4 batches +1 batch | none | Throughput | 3.00 batches/day | Both extractors agreed |
Waiting time for dietary supplementShow verbatim quote (Table 1)Waiting time for dietary supplement 11.06 min 1.95 min -9.11 min | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 11.1 min | Adjudicated |
Search time due to lack of visual controlShow verbatim quote (Table 1)Search time due to lack of visual control 5.77 min 2.77 min -3.00 min | Not classifiable from the report | Lost time | 5.77 min | Adjudicated |
Search time due to lack of visual controlShow verbatim quote (Table 1)Search time due to lack of visual control 5.77 min 2.77 min -3.00 min | Not classifiable from the report | Lost time | 2.77 min | Adjudicated |
—Show verbatim quote (Table 1)Productivity 3 batches 4 batches +1 batch | none | Throughput | 4.00 batches/day | Both extractors agreed |
Waiting time for dietary supplementShow verbatim quote (Table 1)Waiting time for dietary supplement 11.06 min 1.95 min -9.11 min | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 1.95 min | Adjudicated |
Travel timeShow verbatim quote (Table 1)Travel time 3.48 min 2.03 min -1.45 min | Not classifiable from the report | Lost time | 3.48 min | Adjudicated |
Total cleaning timeShow verbatim quote (Table 1)Total cleaning time 123.38 min 102.16 min -21.22 min | Setup and adjustments | Lost time | 123 min | Both extractors agreed |
Total cleaning timeShow verbatim quote (Table 1)Total cleaning time 123.38 min 102.16 min -21.22 min | Setup and adjustments | Lost time | 102 min | Both extractors agreed |
Total pre cleaning timeShow verbatim quote (Table 1)Total pre cleaning time 17.41 min 14.41 min -3.00 min | Setup and adjustments | Lost time | 17.4 min | Single extractor |
Wait for supervisor confirmationShow verbatim quote (Table 7)Wait for supervisor confirmation 3.00 Internal Eliminated | Setup and adjustments | Mean event duration | 3.00 min | Single extractor |
Move trays to cold storagecold storageShow verbatim quote (Table 7)Move trays to cold storage 4.58 Internal Internal | Setup and adjustments | Mean event duration | 4.58 min | Single extractor |
Go to cleaning roomShow verbatim quote (Table 7)Go to cleaning room 0.89 Internal External | Setup and adjustments | Mean event duration | 0.890 min | Single extractor |
Search and transfer utensils to the areaShow verbatim quote (Table 7)Search and transfer utensils to the area 2.81 Internal External | Setup and adjustments | Mean event duration | 2.81 min | Single extractor |
Prepare detergent/disinfectant solutionShow verbatim quote (Table 7)Prepare detergent/disinfectant solution 2.09 Internal External | Setup and adjustments | Mean event duration | 2.09 min | Single extractor |
Disassemble parts of inactive equipmentShow verbatim quote (Table 7)Disassemble parts of inactive equipment 4.04 Internal External | Setup and adjustments | Mean event duration | 4.04 min | Single extractor |
Total pre cleaning timeShow verbatim quote (Table 1)Total pre cleaning time 17.41 min 14.41 min -3.00 min | Setup and adjustments | Lost time | 14.4 min | Single extractor |
Travel timeShow verbatim quote (Table 1)Travel time 3.48 min 2.03 min -1.45 min | Not classifiable from the report | Lost time | 2.03 min | Single extractor |
Wait for supervisor confirmationShow verbatim quote (Table 7)Wait for supervisor confirmation 3.00 | Setup and adjustments | Lost time | 3.00 min | Single extractor |
Move trays to cold storageShow verbatim quote (Table 7)Move trays to cold storage 4.58 | Setup and adjustments | Lost time | 4.58 min | Single extractor |
Go to cleaning roomShow verbatim quote (Table 7)Go to cleaning room 0.89 | Setup and adjustments | Lost time | 0.890 min | Single extractor |
Search and transfer utensils to the areaShow verbatim quote (Table 7)Search and transfer utensils to the area 2.81 | Setup and adjustments | Lost time | 2.81 min | Single extractor |
Prepare detergent/disinfectant solutionShow verbatim quote (Table 7)Prepare detergent/disinfectant solution 2.09 | Setup and adjustments | Lost time | 2.09 min | Single extractor |
Disassemble parts of inactive equipmentShow verbatim quote (Table 7)Disassemble parts of inactive equipment 4.04 | Setup and adjustments | Lost time | 4.04 min | Single extractor |
Observation units
- BARF meatball production line · Whole line or unspecified equipment · Baseline
- BARF meatball production line · Whole line or unspecified equipment · After intervention
- BARF meatball processing line · Whole line or unspecified equipment · Baseline