Production Management Model Based on Lean Manufacturing Tools and SLP to Increase Productivity in a Meatball (BARF) Plant

Open source

1Bibliographic record

Authors
Maria Clara Orellana Vazconez, Fabiana Almendra Villa Huamaní, Rafael Mauricio Villanueva Flores, Roberto Alexander Minaya Villavicencio
Year
2026
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Animal feed and pet food
Process family
Mixing and formulation
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
manual_logs
Intervention
Show the setting as described by the study
Currently, the plant yields 3 batches daily and operates at a labor productivity rate of 8.29 kg/man-hour.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 6High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only selected causes are reported and the total is unknown.0 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Table 1)
Productivity 3 batches 4 batches +1 batch
noneThroughput3.00 batches/dayBoth extractors agreed
Waiting time for dietary supplement
Show verbatim quote (Table 1)
Waiting time for dietary supplement 11.06 min 1.95 min -9.11 min
Organizational or external stops (material or personnel shortage, utilities outage)Lost time11.1 minAdjudicated
Search time due to lack of visual control
Show verbatim quote (Table 1)
Search time due to lack of visual control 5.77 min 2.77 min -3.00 min
Not classifiable from the reportLost time5.77 minAdjudicated
Search time due to lack of visual control
Show verbatim quote (Table 1)
Search time due to lack of visual control 5.77 min 2.77 min -3.00 min
Not classifiable from the reportLost time2.77 minAdjudicated
—
Show verbatim quote (Table 1)
Productivity 3 batches 4 batches +1 batch
noneThroughput4.00 batches/dayBoth extractors agreed
Waiting time for dietary supplement
Show verbatim quote (Table 1)
Waiting time for dietary supplement 11.06 min 1.95 min -9.11 min
Organizational or external stops (material or personnel shortage, utilities outage)Lost time1.95 minAdjudicated
Travel time
Show verbatim quote (Table 1)
Travel time 3.48 min 2.03 min -1.45 min
Not classifiable from the reportLost time3.48 minAdjudicated
Total cleaning time
Show verbatim quote (Table 1)
Total cleaning time 123.38 min 102.16 min -21.22 min
Setup and adjustmentsLost time123 minBoth extractors agreed
Total cleaning time
Show verbatim quote (Table 1)
Total cleaning time 123.38 min 102.16 min -21.22 min
Setup and adjustmentsLost time102 minBoth extractors agreed
Total pre cleaning time
Show verbatim quote (Table 1)
Total pre cleaning time 17.41 min 14.41 min -3.00 min
Setup and adjustmentsLost time17.4 minSingle extractor
Wait for supervisor confirmation
Show verbatim quote (Table 7)
Wait for supervisor confirmation 3.00 Internal Eliminated
Setup and adjustmentsMean event duration3.00 minSingle extractor
Move trays to cold storagecold storage
Show verbatim quote (Table 7)
Move trays to cold storage 4.58 Internal Internal
Setup and adjustmentsMean event duration4.58 minSingle extractor
Go to cleaning room
Show verbatim quote (Table 7)
Go to cleaning room 0.89 Internal External
Setup and adjustmentsMean event duration0.890 minSingle extractor
Search and transfer utensils to the area
Show verbatim quote (Table 7)
Search and transfer utensils to the area 2.81 Internal External
Setup and adjustmentsMean event duration2.81 minSingle extractor
Prepare detergent/disinfectant solution
Show verbatim quote (Table 7)
Prepare detergent/disinfectant solution 2.09 Internal External
Setup and adjustmentsMean event duration2.09 minSingle extractor
Disassemble parts of inactive equipment
Show verbatim quote (Table 7)
Disassemble parts of inactive equipment 4.04 Internal External
Setup and adjustmentsMean event duration4.04 minSingle extractor
Total pre cleaning time
Show verbatim quote (Table 1)
Total pre cleaning time 17.41 min 14.41 min -3.00 min
Setup and adjustmentsLost time14.4 minSingle extractor
Travel time
Show verbatim quote (Table 1)
Travel time 3.48 min 2.03 min -1.45 min
Not classifiable from the reportLost time2.03 minSingle extractor
Wait for supervisor confirmation
Show verbatim quote (Table 7)
Wait for supervisor confirmation 3.00
Setup and adjustmentsLost time3.00 minSingle extractor
Move trays to cold storage
Show verbatim quote (Table 7)
Move trays to cold storage 4.58
Setup and adjustmentsLost time4.58 minSingle extractor
Go to cleaning room
Show verbatim quote (Table 7)
Go to cleaning room 0.89
Setup and adjustmentsLost time0.890 minSingle extractor
Search and transfer utensils to the area
Show verbatim quote (Table 7)
Search and transfer utensils to the area 2.81
Setup and adjustmentsLost time2.81 minSingle extractor
Prepare detergent/disinfectant solution
Show verbatim quote (Table 7)
Prepare detergent/disinfectant solution 2.09
Setup and adjustmentsLost time2.09 minSingle extractor
Disassemble parts of inactive equipment
Show verbatim quote (Table 7)
Disassemble parts of inactive equipment 4.04
Setup and adjustmentsLost time4.04 minSingle extractor

Observation units

  • BARF meatball production line · Whole line or unspecified equipment · Baseline
  • BARF meatball production line · Whole line or unspecified equipment · After intervention
  • BARF meatball processing line · Whole line or unspecified equipment · Baseline