Minor stoppage of milling equipment
In short
It appears in about 2 of every 100 lines studied.
When it appears, it takes on average about 54 % of the line's lost time. Reported by 3 of the 43 studies that could observe it (limited evidence).
What happens
Grinding and polishing machines experience brief interruptions in material flow, caused by small jams, blockages of feed or discharge paths, sensor misreads or momentary mechanical hang-ups in the milling chain. These stoppages are cleared quickly by the operator without needing maintenance intervention, but they repeatedly interrupt the continuous feeding and discharge of grain or kernels through the mill.
What is done about it
Improve feed and discharge path design to reduce jamming points, install sensors and guards that prevent small obstructions from stopping the line, and train operators in rapid clearing procedures. Regular preventive inspection of feed chutes, screens and rollers reduces the frequency of these interruptions.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 1.8% [0.4–4.8%]
- Expected share of lost time
- 1.0% [0.2–2.7%]
- Share of lost time when present
- 54% [41–65%]
- Studies / units
- 43 / 48
- Evidence grade
- C
Grade C: 2 to 4 studies, or an interval wider than 0.35.
2Probability by segment
- Dairy products2.0% [0.2–7.3%]5 studies
- Soft drinks, bottled water and juices2.1% [0.2–8.1%]1 study
- Brewing, wine and spirits2.2% [0.2–7.9%]0 studies
- Bakery and pasta2.1% [0.2–7.5%]0 studies
- Meat, poultry and seafood2.1% [0.3–7.8%]0 studies
- Fruit and vegetable processing2.1% [0.2–7.8%]2 studies
- Grain and oilseed milling2.8% [0.4–8.9%]7 studies
- Sugar and confectionery3.6% [0.6–11.6%]10 studies
- Snacks, coffee, tea and other foods1.9% [0.2–6.2%]5 studies
- Animal feed and pet food2.0% [0.2–6.9%]6 studies
- Food manufacturing (unspecified or mixed)1.9% [0.2–6.7%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceGrinding and polishing machines experience brief interruptions in material flow, caused by small jams, blockages of feed or discharge paths, sensor misreads or momentary mechanical hang-ups in the milling chain. These stoppages are cleared quickly by the operator without needing maintenance intervention, but they repeatedly interrupt the continuous feeding and discharge of grain or kernels through the mill.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show frequent short machine-state transitions to stopped or idle on the grinding or polishing station, each lasting only a few minutes, interspersed with brief operator-reset events and no associated maintenance work order. Feed rate or motor load signals typically drop momentarily and recover without a corresponding fault code, and the frequency of these micro-stops accumulates into a distinct idling counter separate from breakdown stops.
Countermeasure
Engineering guidanceImprove feed and discharge path design to reduce jamming points, install sensors and guards that prevent small obstructions from stopping the line, and train operators in rapid clearing procedures. Regular preventive inspection of feed chutes, screens and rollers reduces the frequency of these interruptions.
4Sources
- Share of lost time: 12.1 % · as reported: “idle and minor stoppages”
Show verbatim quote
Rata-rata kerugian yang terjadi pada setiap mesin yaitu breakdown losses 0,048%, setup and adjustment losses 0,159%, idle and minor stoppages 12,127%, dan reduced speed losses 11,749%.
- Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC (2023)Open sourceShare of planned time: 10.0 % · as reported: “idling and minor stoppages”
Show verbatim quote
Rata-rata yang diperoleh dari persentase idling and minor stoppages losses yaitu seebesar 10 %.
- ANALISIS EFEKTIVITAS MESIN POLES BERAS (RICE POLISHER) MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DAN SIX BIG LOSSES PADA PB TRI HANIFA BERBASIS KONSEP TOTAL PRODUCTIVE MAINTENANCE (TPM) (2026)Open sourceShare of lost time: 10.5 % · as reported: “idling and minor stoppages”
Show verbatim quote
Kerugian terbesar berasal dari reduced speed losses sebesar 51,09% dan idling and minor stoppages sebesar 10,53%.