Included study
Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC
1Bibliographic record
- Authors
- Bambang Herry Purnomo, Noer Novijanto, Fikria Silfa Maeline
- Year
- 2023
- Venue
- AGROINTEK
- Country
- Indonesia
- Segment
- Sugar and confectionery
- Process family
- Milling, extraction and separation
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 184 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Salah satu mesin yang digunakan pada proses produksi adalah mesin penggiling kakao yang disebut mesin grinding ICM (impact classifier mill).
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method. | 2 / 2 |
| Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points. | 2 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—Mesin grinding ICMShow verbatim quote (Tabel 10 / Penentuan Nilai OEE)Rata-rata quality rate mesin grinding periode Juli sampai Desember 2021 adalah 83%. | none | Quality | 83.0 % | Both extractors agreed |
—Mesin grinding ICMShow verbatim quote (Tabel 9 / Penentuan Nilai OEE)Rata-rata performance rate periode Juli sampai Desember 2021 yaitu 96%. | none | Performance | 96.0 % | Both extractors agreed |
—Mesin grinding ICMShow verbatim quote (Tabel 8 / Penentuan Nilai OEE)Rata-rata availability rate dari mesin grinding adalah 56 %. | none | Availability | 56.0 % | Both extractors agreed |
—Mesin grinding ICMShow verbatim quote (Tabel 11 / Penentuan Nilai OEE)Berdasarkan Tabel 11 diperoleh bahwa rata-rata nilai OEE bulan Juli hingga Desember 2021 adalah sebesar 45 %. | none | OEE | 45.0 % | Both extractors agreed |
yield atau scrap lossMesin grinding ICMShow verbatim quote (Tabel 6 / Yield/scrap loss)Rata-rata yang dihasilkan scrap loss yaitu 9%. | Start-up losses (reduced yield) | Share of planned time | 9.00 % | Both extractors agreed |
reduced speed lossMesin grinding ICMShow verbatim quote (Tabel 5 / Reduced speed losses)Rata-rata reduced speed losses mesin grinding pada bulan Juli sampai Desember 2021 yaitu 41%. | Reduced speed | Share of planned time | 41.0 % | Both extractors agreed |
set up and adjustmentMesin grinding ICMShow verbatim quote (Tabel 3 / Set up and adjustment losses)Rata-rata waktu set up & adjustment losses pada mesin grinding yaitu sebesar 4%. | Setup and adjustments | Share of planned time | 4.00 % | Both extractors agreed |
breakdownMesin grinding ICMShow verbatim quote (Tabel 2 / Downtime losses)Rata-rata breakdown losses mesin grinding pada periode Juli sampai Desember 2022 adalah 4%. | Equipment failure (breakdowns) | Share of planned time | 4.00 % | Both extractors agreed |
idling and minor stoppagesMesin grinding ICMShow verbatim quote (Tabel 4 / Idling and minor stoppages losses)Rata-rata yang diperoleh dari persentase idling and minor stoppages losses yaitu seebesar 10 %. | Idling and minor stops (micro-stops) | Share of planned time | 10.0 % | Both extractors agreed |
breakdown timeMesin grinding ICMShow verbatim quote (Tabel 1 (Juli))Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05 | Equipment failure (breakdowns) | Lost time | 33.5 jam | Single extractor |
breakdown timeMesin grinding ICMShow verbatim quote (Tabel 1 (Agustus))Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05 | Equipment failure (breakdowns) | Lost time | 28.1 jam | Single extractor |
breakdown timeMesin grinding ICMShow verbatim quote (Tabel 1 (September))Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05 | Equipment failure (breakdowns) | Lost time | 40.9 jam | Single extractor |
breakdown timeMesin grinding ICMShow verbatim quote (Tabel 1 (Oktober))Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05 | Equipment failure (breakdowns) | Lost time | 13.6 jam | Single extractor |
breakdown timeMesin grinding ICMShow verbatim quote (Tabel 1 (November))Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05 | Equipment failure (breakdowns) | Lost time | 26.7 jam | Single extractor |
breakdown timeMesin grinding ICMShow verbatim quote (Tabel 1 (Desember))Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05 | Equipment failure (breakdowns) | Lost time | 14.1 jam | Single extractor |
setup and adjustmentMesin grinding ICMShow verbatim quote (Tabel 1 (Juli))Setup and adjustment (jam) 22 35 12 18 42 17 | Setup and adjustments | Lost time | 22.0 jam | Single extractor |
setup and adjustmentMesin grinding ICMShow verbatim quote (Tabel 1 (Agustus))Setup and adjustment (jam) 22 35 12 18 42 17 | Setup and adjustments | Lost time | 35.0 jam | Single extractor |
setup and adjustmentMesin grinding ICMShow verbatim quote (Tabel 1 (September))Setup and adjustment (jam) 22 35 12 18 42 17 | Setup and adjustments | Lost time | 12.0 jam | Single extractor |
setup and adjustmentMesin grinding ICMShow verbatim quote (Tabel 1 (Oktober))Setup and adjustment (jam) 22 35 12 18 42 17 | Setup and adjustments | Lost time | 18.0 jam | Single extractor |
setup and adjustmentMesin grinding ICMShow verbatim quote (Tabel 1 (November))Setup and adjustment (jam) 22 35 12 18 42 17 | Setup and adjustments | Lost time | 42.0 jam | Single extractor |
setup and adjustmentMesin grinding ICMShow verbatim quote (Tabel 1 (Desember))Setup and adjustment (jam) 22 35 12 18 42 17 | Setup and adjustments | Lost time | 17.0 jam | Single extractor |
planned downtimeMesin grinding ICMShow verbatim quote (Tabel 1 (Juli))Planned downtime (jam) 14 14 14 14 14 14 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 14.0 jam | Single extractor |
Observation units
- Mesin grinding ICM · Milling and grinding · Baseline