Peningkatan overall equipment effectiveness (OEE) mesin grinding pada produksi cokelat bubuk di PT ABC

Open source

1Bibliographic record

Authors
Bambang Herry Purnomo, Noer Novijanto, Fikria Silfa Maeline
Year
2023
Venue
AGROINTEK
Country
Indonesia
Segment
Sugar and confectionery
Process family
Milling, extraction and separation
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
184 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
Salah satu mesin yang digunakan pada proses produksi adalah mesin penggiling kakao yang disebut mesin grinding ICM (impact classifier mill).

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 14Low risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—Mesin grinding ICM
Show verbatim quote (Tabel 10 / Penentuan Nilai OEE)
Rata-rata quality rate mesin grinding periode Juli sampai Desember 2021 adalah 83%.
noneQuality83.0 %Both extractors agreed
—Mesin grinding ICM
Show verbatim quote (Tabel 9 / Penentuan Nilai OEE)
Rata-rata performance rate periode Juli sampai Desember 2021 yaitu 96%.
nonePerformance96.0 %Both extractors agreed
—Mesin grinding ICM
Show verbatim quote (Tabel 8 / Penentuan Nilai OEE)
Rata-rata availability rate dari mesin grinding adalah 56 %.
noneAvailability56.0 %Both extractors agreed
—Mesin grinding ICM
Show verbatim quote (Tabel 11 / Penentuan Nilai OEE)
Berdasarkan Tabel 11 diperoleh bahwa rata-rata nilai OEE bulan Juli hingga Desember 2021 adalah sebesar 45 %.
noneOEE45.0 %Both extractors agreed
yield atau scrap lossMesin grinding ICM
Show verbatim quote (Tabel 6 / Yield/scrap loss)
Rata-rata yang dihasilkan scrap loss yaitu 9%.
Start-up losses (reduced yield)Share of planned time9.00 %Both extractors agreed
reduced speed lossMesin grinding ICM
Show verbatim quote (Tabel 5 / Reduced speed losses)
Rata-rata reduced speed losses mesin grinding pada bulan Juli sampai Desember 2021 yaitu 41%.
Reduced speedShare of planned time41.0 %Both extractors agreed
set up and adjustmentMesin grinding ICM
Show verbatim quote (Tabel 3 / Set up and adjustment losses)
Rata-rata waktu set up & adjustment losses pada mesin grinding yaitu sebesar 4%.
Setup and adjustmentsShare of planned time4.00 %Both extractors agreed
breakdownMesin grinding ICM
Show verbatim quote (Tabel 2 / Downtime losses)
Rata-rata breakdown losses mesin grinding pada periode Juli sampai Desember 2022 adalah 4%.
Equipment failure (breakdowns)Share of planned time4.00 %Both extractors agreed
idling and minor stoppagesMesin grinding ICM
Show verbatim quote (Tabel 4 / Idling and minor stoppages losses)
Rata-rata yang diperoleh dari persentase idling and minor stoppages losses yaitu seebesar 10 %.
Idling and minor stops (micro-stops)Share of planned time10.0 %Both extractors agreed
breakdown timeMesin grinding ICM
Show verbatim quote (Tabel 1 (Juli))
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
Equipment failure (breakdowns)Lost time33.5 jamSingle extractor
breakdown timeMesin grinding ICM
Show verbatim quote (Tabel 1 (Agustus))
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
Equipment failure (breakdowns)Lost time28.1 jamSingle extractor
breakdown timeMesin grinding ICM
Show verbatim quote (Tabel 1 (September))
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
Equipment failure (breakdowns)Lost time40.9 jamSingle extractor
breakdown timeMesin grinding ICM
Show verbatim quote (Tabel 1 (Oktober))
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
Equipment failure (breakdowns)Lost time13.6 jamSingle extractor
breakdown timeMesin grinding ICM
Show verbatim quote (Tabel 1 (November))
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
Equipment failure (breakdowns)Lost time26.7 jamSingle extractor
breakdown timeMesin grinding ICM
Show verbatim quote (Tabel 1 (Desember))
Breakdown time (jam) 33,5 28,07 40,87 13,58 26,73 14,05
Equipment failure (breakdowns)Lost time14.1 jamSingle extractor
setup and adjustmentMesin grinding ICM
Show verbatim quote (Tabel 1 (Juli))
Setup and adjustment (jam) 22 35 12 18 42 17
Setup and adjustmentsLost time22.0 jamSingle extractor
setup and adjustmentMesin grinding ICM
Show verbatim quote (Tabel 1 (Agustus))
Setup and adjustment (jam) 22 35 12 18 42 17
Setup and adjustmentsLost time35.0 jamSingle extractor
setup and adjustmentMesin grinding ICM
Show verbatim quote (Tabel 1 (September))
Setup and adjustment (jam) 22 35 12 18 42 17
Setup and adjustmentsLost time12.0 jamSingle extractor
setup and adjustmentMesin grinding ICM
Show verbatim quote (Tabel 1 (Oktober))
Setup and adjustment (jam) 22 35 12 18 42 17
Setup and adjustmentsLost time18.0 jamSingle extractor
setup and adjustmentMesin grinding ICM
Show verbatim quote (Tabel 1 (November))
Setup and adjustment (jam) 22 35 12 18 42 17
Setup and adjustmentsLost time42.0 jamSingle extractor
setup and adjustmentMesin grinding ICM
Show verbatim quote (Tabel 1 (Desember))
Setup and adjustment (jam) 22 35 12 18 42 17
Setup and adjustmentsLost time17.0 jamSingle extractor
planned downtimeMesin grinding ICM
Show verbatim quote (Tabel 1 (Juli))
Planned downtime (jam) 14 14 14 14 14 14
Planned downtime (scheduled maintenance, breaks, no demand)Lost time14.0 jamSingle extractor

Observation units

  • Mesin grinding ICM · Milling and grinding · Baseline