Combined breakdown and changeover downtime

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 0 of the 127 studies that could observe it (sparse evidence).

What happens

The label aggregates two physically distinct sources of line stoppage, unplanned equipment breakdowns and planned product or format changeovers, into a single reported figure without separating repair time from setup and adjustment time. This lumping can arise from how the primary study's data collection system records or reports downtime, mixing maintenance-driven stops with scheduled transition stops under one umbrella metric.

What is done about it

Introduce separate state codes and timestamped event logging in the control or MES system to distinguish unplanned maintenance stops from planned changeover and adjustment stops, enabling independent tracking and improvement of each. Where disaggregation of historical data is not possible, flag the metric for review and request future data collection that separates breakdown and changeover reason codes.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.4% [0.1–1.1%]
Expected share of lost time
0.2% [0.0–0.6%]
Share of lost time when present
57% [45–68%]
Studies / units
127 / 161
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.4% [0.0–1.6%]13 studies
  • Soft drinks, bottled water and juices
    0.4% [0.0–1.4%]26 studies
  • Brewing, wine and spirits
    0.4% [0.0–1.6%]11 studies
  • Bakery and pasta
    0.4% [0.0–1.5%]24 studies
  • Meat, poultry and seafood
    0.4% [0.0–1.7%]9 studies
  • Fruit and vegetable processing
    0.4% [0.0–1.7%]7 studies
  • Grain and oilseed milling
    0.4% [0.0–1.7%]6 studies
  • Sugar and confectionery
    0.4% [0.0–1.6%]9 studies
  • Snacks, coffee, tea and other foods
    0.4% [0.0–1.6%]5 studies
  • Animal feed and pet food
    0.4% [0.0–1.5%]7 studies
  • Food manufacturing (unspecified or mixed)
    0.4% [0.0–1.6%]10 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The label aggregates two physically distinct sources of line stoppage, unplanned equipment breakdowns and planned product or format changeovers, into a single reported figure without separating repair time from setup and adjustment time. This lumping can arise from how the primary study's data collection system records or reports downtime, mixing maintenance-driven stops with scheduled transition stops under one umbrella metric.

How it looks in SCADA data

Engineering guidance

In SCADA/MES logs this appears as a single downtime bucket or shift report entry that cannot be disaggregated into discrete fault-code stops versus changeover-state durations, often because the historian lacks separate state codes for repair versus setup or because manual logging merged both events. Analysts typically see a composite non-running time total with no corresponding alarm trail or changeover-start/end markers to split it.

Countermeasure

Engineering guidance

Introduce separate state codes and timestamped event logging in the control or MES system to distinguish unplanned maintenance stops from planned changeover and adjustment stops, enabling independent tracking and improvement of each. Where disaggregation of historical data is not possible, flag the metric for review and request future data collection that separates breakdown and changeover reason codes.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of planned time: 12.8 % · as reported: “breakdown time and changeover time”
    Show verbatim quote
    The waste of breakdown time and changeover time together accounted for 12.8% of production time.