Waste Management and Operational Efficiency Improvement in Cake and Pastry Factory Through Adapting DMAIC Methodology

Open source

1Bibliographic record

Authors
Kaouther Ghacham, Shoug Ghanem Alshawi, Raghad Muhammed Aljaloud, Malath Abdulkarim Alrawdhan, Munerah Saleh Alrudhyan, Lial Hamad Almari
Year
2026
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Saudi Arabia
Segment
Bakery and pasta
Process family
Forming, baking and cooking
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 3 lines · 9 machines
Observation period
300 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
This study focuses on reducing waste and enhancing operations in a bun production line within a leading bakery manufacturer that has over 40 years of experience in the fast-food and baking industry and is ranked among the top 50 most valuable brands in Saudi Arabia.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 12Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Recomputed totals, shares and OEE factors agree with the reported values within 2 percentage points.2 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
time waste
Show verbatim quote (Section 5.2.3 Solutions Execution)
Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives.
Not classifiable from the reportShare of planned time8.76 %Both extractors agreed
—
Show verbatim quote (Section 5.2.3 Solutions Execution)
Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives.
noneOEE55.4 %Both extractors agreed
DividerDivider
Show verbatim quote (Section 5.1.2 Time Waste / Figure 4)
Divider exhibits the highest probability of failure in the upcoming month, indicated by the most significant number of recorded breakdowns (30 incidents). The high failure frequency combined with moderate repair time (MTTR = 42.1 minutes).
Equipment failure (breakdowns)Mean event duration42.1 minBoth extractors agreed
DividerDivider
Show verbatim quote (Section 5.1.2 Time Waste / Figure 4)
Divider exhibits the highest probability of failure in the upcoming month, indicated by the most significant number of recorded breakdowns (30 incidents). The high failure frequency combined with moderate repair time (MTTR = 42.1 minutes).
Equipment failure (breakdowns)Number of events30.0 eventsBoth extractors agreed
ProoferProofer
Show verbatim quote (Section 5.1.2 Time Waste / Figure 4)
Proofer, with a recorded 27 failures, has the longest average MTTR (121.22) and reliability at only 4.25%, underscoring its substantial impact on unplanned downtime.
Equipment failure (breakdowns)Mean event duration121 minBoth extractors agreed
prooferProofer
Show verbatim quote (Figure 2 / Section 4.2)
Analysis of breakdown sources in Figure 2 showed that the proofer was the most critical contributor with 55 hours lost across 28 incidents, followed by power interruption during the Eid al-Fitr season.
Equipment failure (breakdowns)Number of events28.0 eventsBoth extractors agreed
prooferProofer
Show verbatim quote (Figure 2 / Section 4.2)
Analysis of breakdown sources in Figure 2 showed that the proofer was the most critical contributor with 55 hours lost across 28 incidents, followed by power interruption during the Eid al-Fitr season.
Equipment failure (breakdowns)Lost time55.0 hBoth extractors agreed
Power Interruption
Show verbatim quote (Section 5.1.2 Time Waste)
The Power Interruption category only happened twice; it had a high MTTR of 913.5 minutes, which brought the reliability down to 79.22%.
Organizational or external stops (material or personnel shortage, utilities outage)Mean event duration914 minBoth extractors agreed
breakdowns
Show verbatim quote (Section 4.2 Measure Phase)
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
Equipment failure (breakdowns)Share of planned time3.03 %Both extractors agreed
breakdowns
Show verbatim quote (Section 4.2 Measure Phase)
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
Equipment failure (breakdowns)Lost time205 hBoth extractors agreed
breakdowns
Show verbatim quote (Section 4.2 Measure Phase)
Over the course of ten months in 2024, 187 breakdowns resulted in 204.75 hours of downtime (3.032% of production time), an acceptable rate that requires ongoing monitoring, particularly for trends that persist.
Equipment failure (breakdowns)Number of events187 eventsBoth extractors agreed
—
Show verbatim quote (Section 4.2 Measure Phase)
The 2024 performance yielded a 98.55% yield with an 82% automation level, but moderate technology utilization was observed, indicating untapped potential and weak process control that require further investigation.
noneYield98.6 %Both extractors agreed
—
Show verbatim quote (Section 5.1.4)
Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%.
noneOEE48.6 %Both extractors agreed
—
Show verbatim quote (Section 5.1.4)
Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%.
noneQuality68.2 %Both extractors agreed
—
Show verbatim quote (Section 5.1.4)
Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%.
nonePerformance87.0 %Both extractors agreed
—
Show verbatim quote (Section 5.1.4)
Results showed an Availability of 82.41%, a Performance of 87%, and a Quality rate of 68.18%, leading to an overall OEE of 48.64% and indicating potential for improvement, as world-class OEE values typically exceed 85%.
noneAvailability82.4 %Both extractors agreed
breakdown time and changeover time
Show verbatim quote (Section 4.2 Measure Phase)
The waste of breakdown time and changeover time together accounted for 12.8% of production time.
Not classifiable from the reportShare of planned time12.8 %Both extractors agreed
changeover time
Show verbatim quote (Section 4.2 Measure Phase)
Changeover activities during January 2025 consumed 66.63 hours, which accounted for 9.77% of total production time, a relatively high percentage attributed to the product variety.
Setup and adjustmentsShare of planned time9.77 %Both extractors agreed
changeover time
Show verbatim quote (Section 4.2 Measure Phase)
Changeover activities during January 2025 consumed 66.63 hours, which accounted for 9.77% of total production time, a relatively high percentage attributed to the product variety.
Setup and adjustmentsLost time66.6 hBoth extractors agreed
—
Show verbatim quote (Section 4.1 Define Phase)
improving Overall Equipment Effectiveness from its current level of 48% to more than 55% is crucial for enhancing productivity and achieving sustainability
noneOEE48.0 %Single extractor
total food waste
Show verbatim quote (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Not classifiable from the reportDefect rate0.420 %Single extractor
total food waste
Show verbatim quote (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Not classifiable from the reportDefect rate1.48 %Single extractor
total food waste
Show verbatim quote (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Not classifiable from the reportDefect rate85,252 kgSingle extractor
total food waste
Show verbatim quote (Section 4.2 Measure Phase)
Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production.
Not classifiable from the reportDefect rate286,724 kgSingle extractor
total food waste
Show verbatim quote (Section 4.2 Measure Phase)
Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production.
Not classifiable from the reportDefect rate1.50 %Single extractor
downtime
Show verbatim quote (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Not classifiable from the reportLost time106 hSingle extractor
downtime
Show verbatim quote (Section 4.2 Measure Phase)
total waste increased from 85,252 kg (0.42%) in 2022 to 286,723.99 kg (1.48%) in 2024, representing a 236% increase, while downtime increased from 106.26 hours to 244.17 hours, despite production levels remaining relatively stable at around 20 million units.
Not classifiable from the reportLost time244 hSingle extractor
total food waste
Show verbatim quote (Section 4.2 Measure Phase)
Over the course of ten months in 2024, the total food waste amounted to 182,539 kg.
Not classifiable from the reportDefect rate182,539 kgSingle extractor
production waste
Show verbatim quote (Section 4.2 Measure Phase)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Process defects (scrap and rework)Defect rate37.7 %Single extractor
breakdown waste
Show verbatim quote (Section 4.2 Measure Phase)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Equipment failure (breakdowns)Defect rate61.7 %Single extractor
R&D waste
Show verbatim quote (Section 4.2 Measure Phase)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Not classifiable from the reportDefect rate0.600 %Single extractor
R&D waste
Show verbatim quote (Section 4.2 Measure Phase)
R&D waste, though minor at 1,158.98 kg in January 2024, represented 6.55% of experimental activity waste in the month.
Not classifiable from the reportDefect rate1,159 kgSingle extractor
R&D waste
Show verbatim quote (Section 4.2 Measure Phase)
R&D waste, though minor at 1,158.98 kg in January 2024, represented 6.55% of experimental activity waste in the month.
Not classifiable from the reportShare of lost time6.55 %Single extractor
non-productive activities
Show verbatim quote (Section 4.2 Measure Phase)
Based on January 2025 performance, 86.5% of planned production time was used effectively, while 13.5% was lost to non-productive activities, including setup, changeover, machine downtime, and maintenance.
Not classifiable from the reportShare of planned time13.5 %Single extractor
breakdown events
Show verbatim quote (Figure 5 / Section 5.1.2)
Analysis of 200 breakdown events by shift (Day: 6 AM - 6 PM, Night: 6 PM - 6 AM), Figure 5 showed a higher concentration of incidents during the night shift, particularly in the late evening and early morning hours.
Equipment failure (breakdowns)Number of events200 eventsSingle extractor
depanning failuresdepanner
Show verbatim quote (Section 5.1.1 Food Waste)
The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution.
Process defects (scrap and rework)Defect rate46.5 %Single extractor
proofing and baking deviations
Show verbatim quote (Section 5.1.1 Food Waste)
Proofing and baking deviations, together accounting for 27% of production waste, were primarily linked to equipment malfunctions in the proofer and oven discussed earlier.
Process defects (scrap and rework)Defect rate27.0 %Single extractor
ingredient mixing errors
Show verbatim quote (Section 5.1.1 Food Waste)
Ingredient mixing errors (12.5%) were another source of loss, due to manual weighing and human variability.
Process defects (scrap and rework)Defect rate12.5 %Single extractor
topping and panning failures
Show verbatim quote (Section 5.1.1 Food Waste)
Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully.
Process defects (scrap and rework)Defect rate13.9 %Single extractor
Depannerdepanner
Show verbatim quote (Section 5.2 Improve Phase)
Analysis showed that the Imprinter caused 53% of breakdown-related waste (32.7% of total), followed by the Depanner at 17.4% and Ingredient Mixing at 12.9%.
Process defects (scrap and rework)Defect rate17.4 %Single extractor
Ingredient Mixing
Show verbatim quote (Section 5.2 Improve Phase)
Analysis showed that the Imprinter caused 53% of breakdown-related waste (32.7% of total), followed by the Depanner at 17.4% and Ingredient Mixing at 12.9%.
Process defects (scrap and rework)Defect rate12.9 %Single extractor
ImprinterImprinter
Show verbatim quote (Figure 1 / Section 4.2)
Pareto analysis (Figure 1) identified the imprinter machine as having the most significant contribution at 59,692 kg and requiring the highest level of priority for corrective action.
Equipment failure (breakdowns)Defect rate59,692 kgSingle extractor
ImprinterImprinter
Show verbatim quote (Section 5.1.1 Food Waste)
The earlier Pareto chart shown in Figure 1 identified the imprinter machine as the most critical source, contributing 53% of breakdown waste and 32.7% of total food waste.
Equipment failure (breakdowns)Defect rate53.0 %Single extractor
ImprinterImprinter
Show verbatim quote (Section 5.1.1 Food Waste)
The earlier Pareto chart shown in Figure 1 identified the imprinter machine as the most critical source, contributing 53% of breakdown waste and 32.7% of total food waste.
Equipment failure (breakdowns)Defect rate32.7 %Single extractor
ProoferProofer
Show verbatim quote (Section 5.1.1 Food Waste)
The proof was identified as the second-largest contributor to breakdown waste, generating 14,820 kg of waste due to repeated failures in its endless drive system.
Equipment failure (breakdowns)Defect rate14,820 kgSingle extractor
ProoferProofer
Show verbatim quote (Section 5.1.2 Time Waste / Figure 4)
Proofer, with a recorded 27 failures, has the longest average MTTR (121.22) and reliability at only 4.25%, underscoring its substantial impact on unplanned downtime.
Equipment failure (breakdowns)Number of events27.0 eventsSingle extractor
ovenOven
Show verbatim quote (Section 5.1.1 Food Waste)
Next, the oven, with 7,392 kg of waste, experienced frequent jamming and gas supply fluctuations, resulting in uneven baking and temperature deviations.
Equipment failure (breakdowns)Defect rate7,392 kgSingle extractor
food waste
Show verbatim quote (Section 5.2.3 Solutions Execution)
Implementation resulted in a reduction of 24.8% in food waste, from 1.5% to 1.13%, and a 7.11% increase in OEE, from 48% to 52.6%.
Not classifiable from the reportDefect rate1.13 %Single extractor
—
Show verbatim quote (Section 5.2.3 Solutions Execution)
Implementation resulted in a reduction of 24.8% in food waste, from 1.5% to 1.13%, and a 7.11% increase in OEE, from 48% to 52.6%.
noneOEE52.6 %Single extractor
food waste
Show verbatim quote (Section 5.2.3 Solutions Execution)
Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%, 5% increase in OEE, from 52.6% to 55.4%, and a 31.6% reduction in time waste, dropping from 12.8% to 8.76%, successfully meeting the project objectives.
Not classifiable from the reportDefect rate0.983 %Single extractor
—
Show verbatim quote (Section 4.2)
Total food waste in the bun production line was 286,723.99 kg in 2024, representing approximately 1.5% of total production.
Process defects (scrap and rework)Share of planned time1.50 %Single extractor
—
Show verbatim quote (Section 4.2)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Equipment failure (breakdowns)Share of lost time61.7 %Single extractor
—
Show verbatim quote (Section 4.2)
It is categorized into three primary sources: production waste at 37.7%, breakdown waste at 61.7%, and R&D waste at 0.6%.
Process defects (scrap and rework)Share of lost time37.7 %Single extractor
imprinter machineimprinter
Show verbatim quote (Section 4.2)
Pareto analysis (Figure 1) identified the imprinter machine as having the most significant contribution at 59,692 kg and requiring the highest level of priority for corrective action.
Equipment failure (breakdowns)Lost time59,692 kgSingle extractor
proofer endless drive system failuresproofer
Show verbatim quote (Section 5.1.1)
The proof was identified as the second-largest contributor to breakdown waste, generating 14,820 kg of waste due to repeated failures in its endless drive system.
Equipment failure (breakdowns)Lost time14,820 kgSingle extractor
oven jamming and gas supply fluctuationsoven
Show verbatim quote (Section 5.1.1)
Next, the oven, with 7,392 kg of waste, experienced frequent jamming and gas supply fluctuations, resulting in uneven baking and temperature deviations.
Equipment failure (breakdowns)Lost time7,392 kgSingle extractor
depanning failuresdepanner
Show verbatim quote (Section 5.1.1)
The depanning failures, representing approximately 46.5% of production waste, were identified as the most significant contribution.
Process defects (scrap and rework)Share of lost time46.5 %Single extractor
proofing and baking deviationsproofer, oven
Show verbatim quote (Section 5.1.1)
Proofing and baking deviations, together accounting for 27% of production waste, were primarily linked to equipment malfunctions in the proofer and oven
Process defects (scrap and rework)Share of lost time27.0 %Single extractor
ingredient mixing errors
Show verbatim quote (Section 5.1.1)
Ingredient mixing errors (12.5%) were another source of loss, due to manual weighing and human variability.
Process defects (scrap and rework)Share of lost time12.5 %Single extractor
panning and topping failurespanner
Show verbatim quote (Section 5.1.1)
Similarly, topping and panning failures (13.9% combined) occurred when dough balls were misaligned in pans or when glazing and sesame seeds were applied unsuccessfully.
Process defects (scrap and rework)Share of lost time13.9 %Single extractor
—
Show verbatim quote (Section 5.2.3)
In Phase 2, from April to May 2025, similar product scheduling was implemented, along with preventive maintenance and the standardization of color-coded measuring tools. Implementation led to a 13% reduction in food waste, from 1.13% to 0.983%
Process defects (scrap and rework)Share of planned time0.983 %Single extractor

Observation units

  • Bun production line (Phase 2) · Whole line or unspecified equipment · After intervention
  • Divider · Forming, moulding and depositing · Baseline
  • Proofer · Fermentation · Baseline
  • Bun production line · Whole line or unspecified equipment · Baseline
  • Imprinter · Forming, moulding and depositing · Baseline
  • Oven · Baking · Baseline
  • Bun production line (Phase 1) · Whole line or unspecified equipment · After intervention
  • Bun Production Line · Whole line or unspecified equipment · After intervention