Pallet Supply Depletion
In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 52 % of the line's lost time. Reported by 0 of the 120 studies that could observe it (sparse evidence).
What happens
The line runs out of empty pallets available for stacking or supporting finished containers, so the filling or downstream accumulation station must halt until an operator brings in a fresh supply. This is a logistical replenishment gap rather than an equipment malfunction, typically caused by delayed material handling or insufficient buffer stock near the line.
What is done about it
Establish a minimum buffer stock of empty pallets near the end of line with a visual or automated low-level alert that triggers replenishment before depletion, and consider kanban-style or automated pallet dispensing to decouple pallet supply timing from line operation.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.3% [0.1–1.0%]
- Expected share of lost time
- 0.2% [0.0–0.5%]
- Share of lost time when present
- 52% [40–64%]
- Studies / units
- 120 / 162
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.5%]18 studies
- Soft drinks, bottled water and juices0.3% [0.0–1.3%]44 studies
- Brewing, wine and spirits0.4% [0.0–1.5%]16 studies
- Bakery and pasta0.4% [0.0–1.6%]0 studies
- Meat, poultry and seafood0.4% [0.0–1.6%]6 studies
- Fruit and vegetable processing0.4% [0.0–1.7%]4 studies
- Grain and oilseed milling0.4% [0.0–1.6%]6 studies
- Sugar and confectionery0.4% [0.0–1.5%]3 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.4%]6 studies
- Animal feed and pet food0.4% [0.0–1.6%]4 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.5%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line runs out of empty pallets available for stacking or supporting finished containers, so the filling or downstream accumulation station must halt until an operator brings in a fresh supply. This is a logistical replenishment gap rather than an equipment malfunction, typically caused by delayed material handling or insufficient buffer stock near the line.
How it looks in SCADA data
Engineering guidanceThe affected machine state shows a short idle or stop with no fault code logged, often accompanied by blocking of upstream filling or capping stations and starvation further downstream once accumulation buffers empty out. A pallet presence or low-stock sensor, if instrumented, will register an empty or low condition just before the stop event.
Countermeasure
Engineering guidanceEstablish a minimum buffer stock of empty pallets near the end of line with a visual or automated low-level alert that triggers replenishment before depletion, and consider kanban-style or automated pallet dispensing to decouple pallet supply timing from line operation.
4Sources
- IMPLEMENTATION OF TPM ( TOTAL PRODUCTIVE MAINTENANCE) METHOD ON FILLING LINE 4 MACHINE TO REDUCE REJECTS AND DOWNTIME AT PT.XYZ (2025)Open sourceLost time: 93.0 min · as reported: “pallet ran out”
Show verbatim quote
In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes .