IMPLEMENTATION OF TPM ( TOTAL PRODUCTIVE MAINTENANCE) METHOD ON FILLING LINE 4 MACHINE TO REDUCE REJECTS AND DOWNTIME AT PT.XYZ
1Bibliographic record
- Authors
- Khusaeri
- Year
- 2025
- Venue
- JKIE (Journal Knowledge Industrial Engineering)
- Country
- Indonesia
- Segment
- Soft drinks, bottled water and juices
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 85 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
PT. XYZ is one of the manufacturing companies engaged in various kinds of cold drinks (beverages), located in Pasuruan regency.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described. | 1 / 2 |
| Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events). | 2 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Only post-intervention or only "best period" results are reported. | 0 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
SIP (Sanitation In Place)Show verbatim quote (Conclusion, point 1 / Table 4.4)In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes . | Idling and minor stops (micro-stops) | Lost time | 1,943 min | Adjudicated |
CIP (Cleaning In Place)Show verbatim quote (Conclusion, point 1 / Table 4.4)In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes . | Idling and minor stops (micro-stops) | Lost time | 2,509 min | Adjudicated |
—filling machineShow verbatim quote (Conclusion, point 3)obtained mark availability of 95.05%, the value performance of 82.07% and value Quality by 92.92% so that obtained OEE value of 76.92% | none | Quality | 92.9 % | Both extractors agreed |
—filling machineShow verbatim quote (Conclusion, point 3)obtained mark availability of 95.05%, the value performance of 82.07% and value Quality by 92.92% so that obtained OEE value of 76.92% | none | Performance | 82.1 % | Both extractors agreed |
—filling machineShow verbatim quote (Conclusion, point 3)obtained mark availability of 95.05%, the value performance of 82.07% and value Quality by 92.92% so that obtained OEE value of 76.92% | none | Availability | 95.1 % | Both extractors agreed |
—filling machineShow verbatim quote (Conclusion, point 3)obtained mark availability of 95.05%, the value performance of 82.07% and value Quality by 92.92% so that obtained OEE value of 76.92% who are under mark standard international that is 85.40%. | none | OEE | 76.9 % | Both extractors agreed |
stuck stamp on trackfilling machine (stamp/cap applicator)Show verbatim quote (Conclusion, point 1 / Table 4.4)In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes . | Idling and minor stops (micro-stops) | Lost time | 484 min | Adjudicated |
bottle stuck in the SIPA dividerSIPA dividerShow verbatim quote (Conclusion, point 1 / Table 4.4)In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes . | Idling and minor stops (micro-stops) | Lost time | 322 min | Single extractor |
tilting was stucktilting slotShow verbatim quote (Conclusion, point 1 / Table 4.4)In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes . | Idling and minor stops (micro-stops) | Lost time | 277 min | Single extractor |
pallet ran outShow verbatim quote (Conclusion, point 1 / Table 4.4)In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes . | Idling and minor stops (micro-stops) | Lost time | 93.0 min | Single extractor |
D1 type fillingfilling machine line 4Show verbatim quote (Conclusion, point 2)waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs. | Process defects (scrap and rework) | Number of events | 967 pcs | Single extractor |
slanted lidfilling machine line 4Show verbatim quote (Conclusion, point 2)waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs. | Process defects (scrap and rework) | Number of events | 1,586 pcs | Single extractor |
folded TEfilling machine line 4Show verbatim quote (Conclusion, point 2)waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs. | Process defects (scrap and rework) | Number of events | 5,204 pcs | Single extractor |
closed perchedfilling machine line 4Show verbatim quote (Conclusion, point 2)waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs. | Process defects (scrap and rework) | Number of events | 479 pcs | Single extractor |
broken bridefilling machine line 4Show verbatim quote (Conclusion, point 2)waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs. | Process defects (scrap and rework) | Number of events | 5,551 pcs | Single extractor |
without closedfilling machine line 4Show verbatim quote (Conclusion, point 2)waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs. | Process defects (scrap and rework) | Number of events | 12,279 pcs | Single extractor |
without closefilling machine line 4Show verbatim quote (Section 4, below Table 4.1)Example : reject without close in week 48 = 2821/11775x100%=1.938089172=1.9% | Process defects (scrap and rework) | Share of loss events | 1.90 % | Single extractor |
Observation units
- Line 4 filling machine · Filling · Baseline