IMPLEMENTATION OF TPM ( TOTAL PRODUCTIVE MAINTENANCE) METHOD ON FILLING LINE 4 MACHINE TO REDUCE REJECTS AND DOWNTIME AT PT.XYZ

Open source

1Bibliographic record

Authors
Khusaeri
Year
2025
Venue
JKIE (Journal Knowledge Industrial Engineering)
Country
Indonesia
Segment
Soft drinks, bottled water and juices
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
85 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
PT. XYZ is one of the manufacturing companies engaged in various kinds of cold drinks (beverages), located in Pasuruan regency.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported and at least 30 days of production (or at least 100 recorded events).2 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance.2 / 2
Is there evidence of selective reporting of favourable results?Only post-intervention or only "best period" results are reported.0 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
SIP (Sanitation In Place)
Show verbatim quote (Conclusion, point 1 / Table 4.4)
In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes .
Idling and minor stops (micro-stops)Lost time1,943 minAdjudicated
CIP (Cleaning In Place)
Show verbatim quote (Conclusion, point 1 / Table 4.4)
In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes .
Idling and minor stops (micro-stops)Lost time2,509 minAdjudicated
—filling machine
Show verbatim quote (Conclusion, point 3)
obtained mark availability of 95.05%, the value performance of 82.07% and value Quality by 92.92% so that obtained OEE value of 76.92%
noneQuality92.9 %Both extractors agreed
—filling machine
Show verbatim quote (Conclusion, point 3)
obtained mark availability of 95.05%, the value performance of 82.07% and value Quality by 92.92% so that obtained OEE value of 76.92%
nonePerformance82.1 %Both extractors agreed
—filling machine
Show verbatim quote (Conclusion, point 3)
obtained mark availability of 95.05%, the value performance of 82.07% and value Quality by 92.92% so that obtained OEE value of 76.92%
noneAvailability95.1 %Both extractors agreed
—filling machine
Show verbatim quote (Conclusion, point 3)
obtained mark availability of 95.05%, the value performance of 82.07% and value Quality by 92.92% so that obtained OEE value of 76.92% who are under mark standard international that is 85.40%.
noneOEE76.9 %Both extractors agreed
stuck stamp on trackfilling machine (stamp/cap applicator)
Show verbatim quote (Conclusion, point 1 / Table 4.4)
In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes .
Idling and minor stops (micro-stops)Lost time484 minAdjudicated
bottle stuck in the SIPA dividerSIPA divider
Show verbatim quote (Conclusion, point 1 / Table 4.4)
In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes .
Idling and minor stops (micro-stops)Lost time322 minSingle extractor
tilting was stucktilting slot
Show verbatim quote (Conclusion, point 1 / Table 4.4)
In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes .
Idling and minor stops (micro-stops)Lost time277 minSingle extractor
pallet ran out
Show verbatim quote (Conclusion, point 1 / Table 4.4)
In the month February – May 2019 recorded existence minor idling downtime stop at line 4 , namely , CIP ( Cleaning In Place ) 2,509 minutes , SIP ( Sanitation In Place ) 1,943 minutes , stuck stamp on track 484 minutes , bottle stuck in the SIPA 322 divider , tilting was stuck for 277 minutes and the pallet ran out for 93 minutes .
Idling and minor stops (micro-stops)Lost time93.0 minSingle extractor
D1 type fillingfilling machine line 4
Show verbatim quote (Conclusion, point 2)
waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs.
Process defects (scrap and rework)Number of events967 pcsSingle extractor
slanted lidfilling machine line 4
Show verbatim quote (Conclusion, point 2)
waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs.
Process defects (scrap and rework)Number of events1,586 pcsSingle extractor
folded TEfilling machine line 4
Show verbatim quote (Conclusion, point 2)
waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs.
Process defects (scrap and rework)Number of events5,204 pcsSingle extractor
closed perchedfilling machine line 4
Show verbatim quote (Conclusion, point 2)
waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs.
Process defects (scrap and rework)Number of events479 pcsSingle extractor
broken bridefilling machine line 4
Show verbatim quote (Conclusion, point 2)
waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs.
Process defects (scrap and rework)Number of events5,551 pcsSingle extractor
without closedfilling machine line 4
Show verbatim quote (Conclusion, point 2)
waste defect D1 type filling of 967 pcs, slanted lid of 1,586 pcs, folded TE of 5,204 pcs, closed perched 479 pcs, broken bride 5,551 pcs and without closed 12,279 pcs.
Process defects (scrap and rework)Number of events12,279 pcsSingle extractor
without closefilling machine line 4
Show verbatim quote (Section 4, below Table 4.1)
Example : reject without close in week 48 = 2821/11775x100%=1.938089172=1.9%
Process defects (scrap and rework)Share of loss events1.90 %Single extractor

Observation units

  • Line 4 filling machine · Filling · Baseline