In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 3 of the 120 studies that could observe it (sparse evidence).

What happens

The filler is deliberately stopped as part of the production schedule, for reasons such as scheduled maintenance, breaks, shift changes or lack of demand, rather than due to any equipment malfunction or product issue. No output is expected during this interval because the line is intentionally taken out of operation.

What is done about it

Confirm the stop against the production and maintenance schedule so it is correctly excluded from availability losses, and ensure the operator logs the planned reason code consistently. Optimize the schedule itself (maintenance windows, break timing, shift handover) to minimize unnecessary idle time without affecting the OEE loss accounting.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.6% [0.1–1.6%]
Expected share of lost time
0.3% [0.1–0.9%]
Share of lost time when present
57% [45–68%]
Studies / units
120 / 162
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.7% [0.1–2.3%]18 studies
  • Soft drinks, bottled water and juices
    0.5% [0.1–1.7%]44 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.2%]16 studies
  • Bakery and pasta
    0.7% [0.1–2.6%]0 studies
  • Meat, poultry and seafood
    0.7% [0.1–2.4%]6 studies
  • Fruit and vegetable processing
    0.7% [0.1–2.7%]4 studies
  • Grain and oilseed milling
    0.7% [0.1–2.5%]6 studies
  • Sugar and confectionery
    0.7% [0.1–2.7%]3 studies
  • Snacks, coffee, tea and other foods
    0.7% [0.1–2.5%]6 studies
  • Animal feed and pet food
    0.7% [0.1–2.7%]4 studies
  • Food manufacturing (unspecified or mixed)
    1.0% [0.1–3.6%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

The filler is deliberately stopped as part of the production schedule, for reasons such as scheduled maintenance, breaks, shift changes or lack of demand, rather than due to any equipment malfunction or product issue. No output is expected during this interval because the line is intentionally taken out of operation.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows the filler state transitioning to a dedicated planned-stop or standby code aligned with the shift calendar, with no associated fault or alarm codes. The stop duration matches scheduled maintenance or break windows and upstream/downstream equipment typically shows the same planned-state pattern simultaneously.

Countermeasure

Engineering guidance

Confirm the stop against the production and maintenance schedule so it is correctly excluded from availability losses, and ensure the operator logs the planned reason code consistently. Optimize the schedule itself (maintenance windows, break timing, shift handover) to minimize unnecessary idle time without affecting the OEE loss accounting.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 0 mnt · as reported: “Planned Down Time”
    Show verbatim quote
    B Planned Dow n Time mnt 0 0 39
  2. Lost time: 0 mnt · as reported: “Planned Down Time”
    Show verbatim quote
    B Planned Dow n Time mnt 0 0 39
  3. Lost time: 39.0 mnt · as reported: “Planned Down Time”
    Show verbatim quote
    B Planned Dow n Time mnt 0 0 39