Included study
Otomatisasi Perhitungan OEE pada Mesin Filling ILAPAK 50g Menggunakan PLC dan HMI
1Bibliographic record
- Authors
- Dhendy Zaki Ridwan, Helmy Mukti Himawan, Aditya Kurniawan
- Year
- 2024
- Venue
- ELPOSYS Jurnal Sistem Kelistrikan
- Country
- Indonesia
- Segment
- Food manufacturing (unspecified or mixed)
- Process family
- Filling and packaging line
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · 1 machines
- Observation period
- 1 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
PT. Sasa Inti merupakan pabrik yang memproduksi monosodium glutamate atau disingkat MSG. Salah satu proses penting dalam operasionalnya adalah proses filling, yaitu proses memasukkan produk akhir ke dalam wadah yang sudah disiapkan, proses ini terjadi pada mesin Filling ILAPAK 50g.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time. | 2 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Only post-intervention or only "best period" results are reported. | 0 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Planned Down TimeFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)B Planned Dow n Time mnt 0 0 39 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 0 mnt | Single extractor |
BreakdownFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)1 Breakdow n 0 0 0 | Equipment failure (breakdowns) | Lost time | 0 mnt | Single extractor |
Setup & AdjustmentFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)2 Setup & Adjustment 0 0 20 | Setup and adjustments | Lost time | 0 mnt | Single extractor |
Minor StoppagesFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)3 Minor Stoppases 0 0 87 | Idling and minor stops (micro-stops) | Lost time | 0 mnt | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)F % Equipment Availability (E/C) % 100.0 100.0 77.3 | none | Availability | 100 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)G Total Part Produced box 700 707 601 | none | Throughput | 700 box | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)I Performance Rate = (HxG)/E 93.3 88.4 99.1 | none | Performance | 93.3 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)K Quality Rates : (G-J)/G 100.0 100.0 100.0 | none | Quality | 100 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)L Overall Eq (machine) Effectiveness ( F x I x K ) 93.3 88.4 76.6 | none | OEE | 93.3 % | Single extractor |
Planned Down TimeFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)B Planned Dow n Time mnt 0 0 39 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 0 mnt | Single extractor |
BreakdownFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)1 Breakdow n 0 0 0 | Equipment failure (breakdowns) | Lost time | 0 mnt | Single extractor |
Setup & AdjustmentFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)2 Setup & Adjustment 0 0 20 | Setup and adjustments | Lost time | 0 mnt | Single extractor |
Minor StoppagesFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)3 Minor Stoppases 0 0 87 | Idling and minor stops (micro-stops) | Lost time | 0 mnt | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)F % Equipment Availability (E/C) % 100.0 100.0 77.3 | none | Availability | 100 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)G Total Part Produced box 700 707 601 | none | Throughput | 707 box | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)I Performance Rate = (HxG)/E 93.3 88.4 99.1 | none | Performance | 88.4 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)K Quality Rates : (G-J)/G 100.0 100.0 100.0 | none | Quality | 100 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)L Overall Eq (machine) Effectiveness ( F x I x K ) 93.3 88.4 76.6 | none | OEE | 88.4 % | Single extractor |
Planned Down TimeFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)B Planned Dow n Time mnt 0 0 39 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 39.0 mnt | Single extractor |
BreakdownFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)1 Breakdow n 0 0 0 | Equipment failure (breakdowns) | Lost time | 0 mnt | Single extractor |
Setup & AdjustmentFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)2 Setup & Adjustment 0 0 20 | Setup and adjustments | Lost time | 20.0 mnt | Single extractor |
Minor StoppagesFilling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)3 Minor Stoppases 0 0 87 | Idling and minor stops (micro-stops) | Lost time | 87.0 mnt | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)F % Equipment Availability (E/C) % 100.0 100.0 77.3 | none | Availability | 77.3 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)G Total Part Produced box 700 707 601 | none | Throughput | 601 box | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)I Performance Rate = (HxG)/E 93.3 88.4 99.1 | none | Performance | 99.1 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)K Quality Rates : (G-J)/G 100.0 100.0 100.0 | none | Quality | 100 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)L Overall Eq (machine) Effectiveness ( F x I x K ) 93.3 88.4 76.6 | none | OEE | 76.6 % | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Tabel 4.1 Perbandingan Manual dan PLC)Total Product 607 box 613 box | none | Throughput | 607 box | Single extractor |
BreakdownFilling ILAPAK 50gShow verbatim quote (Tabel 4.1 Perbandingan Manual dan PLC)Breakdown 0 mnt 0 mnt | Equipment failure (breakdowns) | Lost time | 0 mnt | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Tabel 4.1 Perbandingan Manual dan PLC)Total Product 607 box 613 box | none | Throughput | 613 box | Single extractor |
BreakdownFilling ILAPAK 50gShow verbatim quote (Tabel 4.1 Perbandingan Manual dan PLC)Breakdown 0 mnt 0 mnt | Equipment failure (breakdowns) | Lost time | 0 mnt | Single extractor |
—Filling ILAPAK 50gShow verbatim quote (Section 4 Kesimpulan)demonstrasi perhitungan OEE mesin pada shift 1 sebesar 86%, angka ini tidak dapat dimanipulasi berdasarkan estimasi operator. | none | OEE | 86.0 % | Single extractor |
Observation units
- Filling ILAPAK 50g - Shift Malam · Filling · Baseline
- Filling ILAPAK 50g - Shift Pagi · Filling · Baseline
- Filling ILAPAK 50g - Shift Sore · Filling · Baseline
- Filling ILAPAK 50g - Shift 1 (Perhitungan Form manual) · Filling · Baseline
- Filling ILAPAK 50g - Shift 1 (Perhitungan PLC otomatis) · Filling · After intervention