foratvise
Get Started
Included study

Otomatisasi Perhitungan OEE pada Mesin Filling ILAPAK 50g Menggunakan PLC dan HMI

Open source

1Bibliographic record

Authors
Dhendy Zaki Ridwan, Helmy Mukti Himawan, Aditya Kurniawan
Year
2024
Venue
ELPOSYS Jurnal Sistem Kelistrikan
Country
Indonesia
Segment
Food manufacturing (unspecified or mixed)
Process family
Filling and packaging line
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · 1 machines
Observation period
1 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
PT. Sasa Inti merupakan pabrik yang memproduksi monosodium glutamate atau disingkat MSG. Salah satu proses penting dalam operasionalnya adalah proses filling, yaitu proses memasukkan produk akhir ke dalam wadah yang sudah disiapkan, proses ini terjadi pada mesin Filling ILAPAK 50g.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 8Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?Formulae or definitions are given for the reported metrics, including what counts as planned time.2 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Only post-intervention or only "best period" results are reported.0 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
Planned Down TimeFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
B Planned Dow n Time mnt 0 0 39
Planned downtime (scheduled maintenance, breaks, no demand)Lost time0 mntSingle extractor
BreakdownFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
1 Breakdow n 0 0 0
Equipment failure (breakdowns)Lost time0 mntSingle extractor
Setup & AdjustmentFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
2 Setup & Adjustment 0 0 20
Setup and adjustmentsLost time0 mntSingle extractor
Minor StoppagesFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
3 Minor Stoppases 0 0 87
Idling and minor stops (micro-stops)Lost time0 mntSingle extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
F % Equipment Availability (E/C) % 100.0 100.0 77.3
noneAvailability100 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
G Total Part Produced box 700 707 601
noneThroughput700 boxSingle extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
I Performance Rate = (HxG)/E 93.3 88.4 99.1
nonePerformance93.3 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
K Quality Rates : (G-J)/G 100.0 100.0 100.0
noneQuality100 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
L Overall Eq (machine) Effectiveness ( F x I x K ) 93.3 88.4 76.6
noneOEE93.3 %Single extractor
Planned Down TimeFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
B Planned Dow n Time mnt 0 0 39
Planned downtime (scheduled maintenance, breaks, no demand)Lost time0 mntSingle extractor
BreakdownFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
1 Breakdow n 0 0 0
Equipment failure (breakdowns)Lost time0 mntSingle extractor
Setup & AdjustmentFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
2 Setup & Adjustment 0 0 20
Setup and adjustmentsLost time0 mntSingle extractor
Minor StoppagesFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
3 Minor Stoppases 0 0 87
Idling and minor stops (micro-stops)Lost time0 mntSingle extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
F % Equipment Availability (E/C) % 100.0 100.0 77.3
noneAvailability100 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
G Total Part Produced box 700 707 601
noneThroughput707 boxSingle extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
I Performance Rate = (HxG)/E 93.3 88.4 99.1
nonePerformance88.4 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
K Quality Rates : (G-J)/G 100.0 100.0 100.0
noneQuality100 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
L Overall Eq (machine) Effectiveness ( F x I x K ) 93.3 88.4 76.6
noneOEE88.4 %Single extractor
Planned Down TimeFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
B Planned Dow n Time mnt 0 0 39
Planned downtime (scheduled maintenance, breaks, no demand)Lost time39.0 mntSingle extractor
BreakdownFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
1 Breakdow n 0 0 0
Equipment failure (breakdowns)Lost time0 mntSingle extractor
Setup & AdjustmentFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
2 Setup & Adjustment 0 0 20
Setup and adjustmentsLost time20.0 mntSingle extractor
Minor StoppagesFilling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
3 Minor Stoppases 0 0 87
Idling and minor stops (micro-stops)Lost time87.0 mntSingle extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
F % Equipment Availability (E/C) % 100.0 100.0 77.3
noneAvailability77.3 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
G Total Part Produced box 700 707 601
noneThroughput601 boxSingle extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
I Performance Rate = (HxG)/E 93.3 88.4 99.1
nonePerformance99.1 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
K Quality Rates : (G-J)/G 100.0 100.0 100.0
noneQuality100 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Gambar 2.3 Form Manual Perhitungan OEE)
L Overall Eq (machine) Effectiveness ( F x I x K ) 93.3 88.4 76.6
noneOEE76.6 %Single extractor
—Filling ILAPAK 50g
Show verbatim quote (Tabel 4.1 Perbandingan Manual dan PLC)
Total Product 607 box 613 box
noneThroughput607 boxSingle extractor
BreakdownFilling ILAPAK 50g
Show verbatim quote (Tabel 4.1 Perbandingan Manual dan PLC)
Breakdown 0 mnt 0 mnt
Equipment failure (breakdowns)Lost time0 mntSingle extractor
—Filling ILAPAK 50g
Show verbatim quote (Tabel 4.1 Perbandingan Manual dan PLC)
Total Product 607 box 613 box
noneThroughput613 boxSingle extractor
BreakdownFilling ILAPAK 50g
Show verbatim quote (Tabel 4.1 Perbandingan Manual dan PLC)
Breakdown 0 mnt 0 mnt
Equipment failure (breakdowns)Lost time0 mntSingle extractor
—Filling ILAPAK 50g
Show verbatim quote (Section 4 Kesimpulan)
demonstrasi perhitungan OEE mesin pada shift 1 sebesar 86%, angka ini tidak dapat dimanipulasi berdasarkan estimasi operator.
noneOEE86.0 %Single extractor

Observation units

  • Filling ILAPAK 50g - Shift Malam · Filling · Baseline
  • Filling ILAPAK 50g - Shift Pagi · Filling · Baseline
  • Filling ILAPAK 50g - Shift Sore · Filling · Baseline
  • Filling ILAPAK 50g - Shift 1 (Perhitungan Form manual) · Filling · Baseline
  • Filling ILAPAK 50g - Shift 1 (Perhitungan PLC otomatis) · Filling · After intervention