In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 43 studies that could observe it (sparse evidence).

What happens

A disorganized and dirty work area around the milling equipment forces operators to spend time locating tools, spare parts or cleaning materials, and obstructs access to machine panels, chutes and controls. This organizational deficiency is not a direct equipment failure but an underlying condition that slows down normal operation, response to stoppages and routine servicing, and can also increase contamination or safety risks.

What is done about it

Implement a structured housekeeping and workplace organization program (such as a five-S approach) around the milling area, with designated storage locations for tools and materials, visual management, and scheduled cleanliness audits integrated into the standard work routine.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.9% [0.2–2.7%]
Expected share of lost time
0.5% [0.1–1.6%]
Share of lost time when present
56% [45–67%]
Studies / units
43 / 48
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.1% [0.1–4.4%]5 studies
  • Soft drinks, bottled water and juices
    1.1% [0.1–4.5%]1 study
  • Brewing, wine and spirits
    1.1% [0.1–4.3%]0 studies
  • Bakery and pasta
    1.1% [0.1–4.3%]0 studies
  • Meat, poultry and seafood
    1.1% [0.1–4.4%]0 studies
  • Fruit and vegetable processing
    1.1% [0.1–4.3%]2 studies
  • Grain and oilseed milling
    1.0% [0.1–4.0%]7 studies
  • Sugar and confectionery
    1.0% [0.1–3.9%]10 studies
  • Snacks, coffee, tea and other foods
    1.0% [0.1–3.9%]5 studies
  • Animal feed and pet food
    1.5% [0.1–6.0%]6 studies
  • Food manufacturing (unspecified or mixed)
    1.1% [0.1–4.4%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

A disorganized and dirty work area around the milling equipment forces operators to spend time locating tools, spare parts or cleaning materials, and obstructs access to machine panels, chutes and controls. This organizational deficiency is not a direct equipment failure but an underlying condition that slows down normal operation, response to stoppages and routine servicing, and can also increase contamination or safety risks.

How it looks in SCADA data

Engineering guidance

There is no direct sensor signature in the SCADA/MES system for this cause; it typically appears indirectly as longer-than-expected intervention or changeover durations, recurring manual stop codes classified as organizational or external, and inconsistent operator comments in shift logs that reference searching for tools or clearing obstructed access points.

Countermeasure

Engineering guidance

Implement a structured housekeeping and workplace organization program (such as a five-S approach) around the milling area, with designated storage locations for tools and materials, visual management, and scheduled cleanliness audits integrated into the standard work routine.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 21.0 % · as reported: “lack of order and cleanliness in the facility”
    Show verbatim quote
    On the other hand, operator failures were linked to a lack of order and cleanliness in the facility (21%).