Implementing Lean and TPM for Machine Availability Enhancement: A Case Study in the Peruvian Food Processing Industry

Open source

1Bibliographic record

Authors
Luis Mauricio Mariluz-Cuadros, Brandon Minaya-Sanchez, Alberto Flores-Pérez
Year
2025
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Animal feed and pet food
Process family
Milling, extraction and separation
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
not_reported
Intervention
Show the setting as described by the study
The validation scenario was conducted in a case study of an agricultural production company specializing in the manufacturing of protein flours derived from animal by-products through the process known as rendering.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period not reported.0 / 2
How were loss data collected?Interviews, estimates, or method not reported.0 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration.1 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—milling machine
Show verbatim quote (Section 4.3 Autonomous Maintenance)
Similarly, the mean time between failures (MTBF) increased from 27.27 hours to 39.30 hours, indicating a substantial enhancement in equipment reliability.
Equipment failure (breakdowns)Time between events39.3 hoursAdjudicated
—milling machine
Show verbatim quote (Section 4.3 Autonomous Maintenance)
The mean time to repair (MTTR) was reduced from 2.36 hours to 1.84 hours, reflecting a 43.96% improvement.
Equipment failure (breakdowns)Mean event duration1.84 hoursAdjudicated
—milling machine
Show verbatim quote (Section 4.3 Autonomous Maintenance)
Similarly, the mean time between failures (MTBF) increased from 27.27 hours to 39.30 hours, indicating a substantial enhancement in equipment reliability.
Equipment failure (breakdowns)Time between events27.3 hoursAdjudicated
—milling machine
Show verbatim quote (Section 4.3 Autonomous Maintenance)
The mean time to repair (MTTR) was reduced from 2.36 hours to 1.84 hours, reflecting a 43.96% improvement.
Equipment failure (breakdowns)Mean event duration2.36 hoursAdjudicated
—milling machine
Show verbatim quote (Table 1)
Availability Rate % 77.01% 90% 82.00% 6.48%
noneAvailability82.0 %Both extractors agreed
—milling machine
Show verbatim quote (Table 1)
Availability Rate % 77.01% 90% 82.00% 6.48%
noneAvailability77.0 %Both extractors agreed
setup time (total)milling machine
Show verbatim quote (Table 1)
Time to set up minute 303.54 195 210.02 -30.81%
Setup and adjustmentsLost time210 minuteBoth extractors agreed
setup time (total)milling machine
Show verbatim quote (Table 1)
Time to set up minute 303.54 195 210.02 -30.81%
Setup and adjustmentsLost time304 minuteBoth extractors agreed
faultsmilling machine
Show verbatim quote (Table 1)
Number of faults times 243 120 175 -27.98%
Equipment failure (breakdowns)Number of events175 timesBoth extractors agreed
faultsmilling machine
Show verbatim quote (Table 1)
Number of faults times 243 120 175 -27.98%
Equipment failure (breakdowns)Number of events243 timesBoth extractors agreed
—milling machine
Show verbatim quote (Table 1)
MTTR (Average repair time) minute 2.36 1.5 1.84 -22.03%
noneMean event duration2.36 minuteSingle extractor
—milling machine
Show verbatim quote (Table 1)
MTBF (Mean time between failures) minute 27.23 45 39.3 44.33%
noneTime between events27.2 minuteSingle extractor
setup time (total)milling machine
Show verbatim quote (Section 4.3 SMED)
As a result, the total setup time decreased from 301.28 minutes to 210.02 minutes, representing a 30.81% improvement.
Setup and adjustmentsLost time301 minutesSingle extractor
internal setup activitiesmilling machine
Show verbatim quote (Section 4.3 SMED / Figure 4)
The total time for internal activities was reduced from 301.28 minutes to 225.21 minutes, representing a 25.63% reduction in downtime, while external tasks remained stable or were improved slightly.
Setup and adjustmentsLost time301 minutesSingle extractor
high unproductive timesmilling machine
Show verbatim quote (Section 4.2 / Figure 2)
At Level 1 of the analysis, the primary causes were identified as high unproductive times (75%) and frequent operator failures (25%).
Not classifiable from the reportShare of lost time75.0 %Single extractor
frequent operator failuresmilling machine
Show verbatim quote (Section 4.2 / Figure 2)
At Level 1 of the analysis, the primary causes were identified as high unproductive times (75%) and frequent operator failures (25%).
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time25.0 %Single extractor
high machine shutdowns due to failuremilling machine
Show verbatim quote (Section 4.2)
At Level 2, the root causes of unproductive times were mainly attributed to high machine shutdowns due to failure (45.98%) and frequent setup stops (29.02%).
Equipment failure (breakdowns)Share of lost time46.0 %Single extractor
frequent setup stopsmilling machine
Show verbatim quote (Section 4.2)
At Level 2, the root causes of unproductive times were mainly attributed to high machine shutdowns due to failure (45.98%) and frequent setup stops (29.02%).
Setup and adjustmentsShare of lost time29.0 %Single extractor
lack of order and cleanliness in the facilitymilling machine
Show verbatim quote (Section 4.2)
On the other hand, operator failures were linked to a lack of order and cleanliness in the facility (21%).
Organizational or external stops (material or personnel shortage, utilities outage)Share of lost time21.0 %Single extractor
—milling machine
Show verbatim quote (Table 1)
MTTR (Average repair time) minute 2.36 1.5 1.84 -22.03%
noneMean event duration1.84 minuteSingle extractor
—milling machine
Show verbatim quote (Table 1)
MTBF (Mean time between failures) minute 27.23 45 39.3 44.33%
noneTime between events39.3 minuteSingle extractor
internal setup activitiesmilling machine
Show verbatim quote (Section 4.3 SMED / Figure 4)
The total time for internal activities was reduced from 301.28 minutes to 225.21 minutes, representing a 25.63% reduction in downtime, while external tasks remained stable or were improved slightly.
Setup and adjustmentsLost time225 minutesSingle extractor

Observation units

  • Milling machines · Milling and grinding · After intervention
  • Milling machines · Milling and grinding · Baseline