Included study
Implementing Lean and TPM for Machine Availability Enhancement: A Case Study in the Peruvian Food Processing Industry
1Bibliographic record
- Authors
- Luis Mauricio Mariluz-Cuadros, Brandon Minaya-Sanchez, Alberto Flores-Pérez
- Year
- 2025
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Animal feed and pet food
- Process family
- Milling, extraction and separation
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- not_reported
- Intervention
Show the setting as described by the study
The validation scenario was conducted in a case study of an agricultural production company specializing in the manufacturing of protein flours derived from animal by-products through the process known as rendering.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 7High risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period not reported. | 0 / 2 |
| How were loss data collected?Interviews, estimates, or method not reported. | 0 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Authors are employees of the plant or of an equipment/software vendor; no declaration. | 1 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
—milling machineShow verbatim quote (Section 4.3 Autonomous Maintenance)Similarly, the mean time between failures (MTBF) increased from 27.27 hours to 39.30 hours, indicating a substantial enhancement in equipment reliability. | Equipment failure (breakdowns) | Time between events | 39.3 hours | Adjudicated |
—milling machineShow verbatim quote (Section 4.3 Autonomous Maintenance)The mean time to repair (MTTR) was reduced from 2.36 hours to 1.84 hours, reflecting a 43.96% improvement. | Equipment failure (breakdowns) | Mean event duration | 1.84 hours | Adjudicated |
—milling machineShow verbatim quote (Section 4.3 Autonomous Maintenance)Similarly, the mean time between failures (MTBF) increased from 27.27 hours to 39.30 hours, indicating a substantial enhancement in equipment reliability. | Equipment failure (breakdowns) | Time between events | 27.3 hours | Adjudicated |
—milling machineShow verbatim quote (Section 4.3 Autonomous Maintenance)The mean time to repair (MTTR) was reduced from 2.36 hours to 1.84 hours, reflecting a 43.96% improvement. | Equipment failure (breakdowns) | Mean event duration | 2.36 hours | Adjudicated |
—milling machineShow verbatim quote (Table 1)Availability Rate % 77.01% 90% 82.00% 6.48% | none | Availability | 82.0 % | Both extractors agreed |
—milling machineShow verbatim quote (Table 1)Availability Rate % 77.01% 90% 82.00% 6.48% | none | Availability | 77.0 % | Both extractors agreed |
setup time (total)milling machineShow verbatim quote (Table 1)Time to set up minute 303.54 195 210.02 -30.81% | Setup and adjustments | Lost time | 210 minute | Both extractors agreed |
setup time (total)milling machineShow verbatim quote (Table 1)Time to set up minute 303.54 195 210.02 -30.81% | Setup and adjustments | Lost time | 304 minute | Both extractors agreed |
faultsmilling machineShow verbatim quote (Table 1)Number of faults times 243 120 175 -27.98% | Equipment failure (breakdowns) | Number of events | 175 times | Both extractors agreed |
faultsmilling machineShow verbatim quote (Table 1)Number of faults times 243 120 175 -27.98% | Equipment failure (breakdowns) | Number of events | 243 times | Both extractors agreed |
—milling machineShow verbatim quote (Table 1)MTTR (Average repair time) minute 2.36 1.5 1.84 -22.03% | none | Mean event duration | 2.36 minute | Single extractor |
—milling machineShow verbatim quote (Table 1)MTBF (Mean time between failures) minute 27.23 45 39.3 44.33% | none | Time between events | 27.2 minute | Single extractor |
setup time (total)milling machineShow verbatim quote (Section 4.3 SMED)As a result, the total setup time decreased from 301.28 minutes to 210.02 minutes, representing a 30.81% improvement. | Setup and adjustments | Lost time | 301 minutes | Single extractor |
internal setup activitiesmilling machineShow verbatim quote (Section 4.3 SMED / Figure 4)The total time for internal activities was reduced from 301.28 minutes to 225.21 minutes, representing a 25.63% reduction in downtime, while external tasks remained stable or were improved slightly. | Setup and adjustments | Lost time | 301 minutes | Single extractor |
high unproductive timesmilling machineShow verbatim quote (Section 4.2 / Figure 2)At Level 1 of the analysis, the primary causes were identified as high unproductive times (75%) and frequent operator failures (25%). | Not classifiable from the report | Share of lost time | 75.0 % | Single extractor |
frequent operator failuresmilling machineShow verbatim quote (Section 4.2 / Figure 2)At Level 1 of the analysis, the primary causes were identified as high unproductive times (75%) and frequent operator failures (25%). | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 25.0 % | Single extractor |
high machine shutdowns due to failuremilling machineShow verbatim quote (Section 4.2)At Level 2, the root causes of unproductive times were mainly attributed to high machine shutdowns due to failure (45.98%) and frequent setup stops (29.02%). | Equipment failure (breakdowns) | Share of lost time | 46.0 % | Single extractor |
frequent setup stopsmilling machineShow verbatim quote (Section 4.2)At Level 2, the root causes of unproductive times were mainly attributed to high machine shutdowns due to failure (45.98%) and frequent setup stops (29.02%). | Setup and adjustments | Share of lost time | 29.0 % | Single extractor |
lack of order and cleanliness in the facilitymilling machineShow verbatim quote (Section 4.2)On the other hand, operator failures were linked to a lack of order and cleanliness in the facility (21%). | Organizational or external stops (material or personnel shortage, utilities outage) | Share of lost time | 21.0 % | Single extractor |
—milling machineShow verbatim quote (Table 1)MTTR (Average repair time) minute 2.36 1.5 1.84 -22.03% | none | Mean event duration | 1.84 minute | Single extractor |
—milling machineShow verbatim quote (Table 1)MTBF (Mean time between failures) minute 27.23 45 39.3 44.33% | none | Time between events | 39.3 minute | Single extractor |
internal setup activitiesmilling machineShow verbatim quote (Section 4.3 SMED / Figure 4)The total time for internal activities was reduced from 301.28 minutes to 225.21 minutes, representing a 25.63% reduction in downtime, while external tasks remained stable or were improved slightly. | Setup and adjustments | Lost time | 225 minutes | Single extractor |
Observation units
- Milling machines · Milling and grinding · After intervention
- Milling machines · Milling and grinding · Baseline