Start-up losses (reduced yield)

Product damage during restart after maintenance

In short

It appears in fewer than 1 of every 100 lines studied.

When it appears, it takes on average about 47 % of the line's lost time. Reported by 1 of the 112 studies that could observe it (sparse evidence).

What happens

After a maintenance intervention, mechanical settings, guides, seals or timing are not yet fully stabilized, so the first units processed through the packaging equipment are crushed, misaligned, scratched or otherwise damaged before the machine settles back into normal operating condition. The loss arises because restart after repair skips or shortens the warm-up and fine-adjustment steps needed to re-establish correct contact pressures, clearances or synchronization between moving parts.

What is done about it

Introduce a controlled post-maintenance verification and warm-up sequence that checks critical settings, clearances and alignments before resuming full-speed production, running a short batch of scrap-tolerant trial units first. Standardize maintenance procedures with checklists and position/torque reference values so machines are returned to validated setpoints rather than restarted from memory.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.5% [0.1–1.4%]
Expected share of lost time
0.2% [0.0–0.7%]
Share of lost time when present
47% [29–66%]
Studies / units
112 / 155
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.5% [0.1–2.1%]14 studies
  • Soft drinks, bottled water and juices
    0.5% [0.1–1.6%]33 studies
  • Brewing, wine and spirits
    0.5% [0.1–1.9%]14 studies
  • Bakery and pasta
    0.6% [0.1–2.2%]6 studies
  • Meat, poultry and seafood
    0.5% [0.1–2.1%]6 studies
  • Fruit and vegetable processing
    0.6% [0.1–2.2%]4 studies
  • Grain and oilseed milling
    0.6% [0.1–2.2%]4 studies
  • Sugar and confectionery
    0.6% [0.1–2.2%]4 studies
  • Snacks, coffee, tea and other foods
    0.6% [0.1–2.1%]8 studies
  • Animal feed and pet food
    0.6% [0.1–2.2%]5 studies
  • Food manufacturing (unspecified or mixed)
    0.8% [0.1–3.1%]14 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

After a maintenance intervention, mechanical settings, guides, seals or timing are not yet fully stabilized, so the first units processed through the packaging equipment are crushed, misaligned, scratched or otherwise damaged before the machine settles back into normal operating condition. The loss arises because restart after repair skips or shortens the warm-up and fine-adjustment steps needed to re-establish correct contact pressures, clearances or synchronization between moving parts.

How it looks in SCADA data

Engineering guidance

SCADA/MES shows a maintenance state transitioning directly into running state with an immediate spike in reject or downgrade counters on the packaging station, often coinciding with the first cycles after the maintenance stop. Quality or vision inspection systems log a short burst of defect alarms limited to the units processed right after the machine-state change, followed by a return to baseline reject rates.

Countermeasure

Engineering guidance

Introduce a controlled post-maintenance verification and warm-up sequence that checks critical settings, clearances and alignments before resuming full-speed production, running a short batch of scrap-tolerant trial units first. Standardize maintenance procedures with checklists and position/torque reference values so machines are returned to validated setpoints rather than restarted from memory.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Share of lost time: 6.03 % · as reported: “Damage product after maintenance activity”
    Show verbatim quote
    Damage product after maintenance activity 6.03% 6.29% 5.97%
  2. Share of lost time: 5.97 % · as reported: “Damage product after maintenance activity”
    Show verbatim quote
    Damage product after maintenance activity 6.03% 6.29% 5.97%