Raw material queuing/waiting delay (staging or weighing)
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).
What happens
The line or a workstation stops or idles because raw material batches must wait in a queue before being staged, chilled or weighed, since the upstream supply, transport or scheduling of material cannot keep pace with the consumption rate of the process. The bottleneck is organizational and logistical rather than a mechanical or control fault in the equipment itself.
What is done about it
Improve material flow planning and scheduling by synchronizing upstream supply, transport and batching with consumption rate, increasing buffer capacity or staging ahead of the constrained station, and coordinating weighing/chilling operations with production pacing to avoid queue formation.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.6% [0.1–1.4%]
- Expected share of lost time
- 0.3% [0.1–0.9%]
- Share of lost time when present
- 57% [45–68%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.2%]13 studies
- Soft drinks, bottled water and juices0.6% [0.1–1.9%]26 studies
- Brewing, wine and spirits0.6% [0.1–2.4%]11 studies
- Bakery and pasta0.6% [0.1–2.0%]24 studies
- Meat, poultry and seafood0.6% [0.1–2.2%]9 studies
- Fruit and vegetable processing0.9% [0.1–3.5%]7 studies
- Grain and oilseed milling0.6% [0.1–2.3%]6 studies
- Sugar and confectionery0.6% [0.1–2.3%]9 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.2%]5 studies
- Animal feed and pet food0.6% [0.1–2.3%]7 studies
- Food manufacturing (unspecified or mixed)0.6% [0.1–2.4%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe line or a workstation stops or idles because raw material batches must wait in a queue before being staged, chilled or weighed, since the upstream supply, transport or scheduling of material cannot keep pace with the consumption rate of the process. The bottleneck is organizational and logistical rather than a mechanical or control fault in the equipment itself.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show the downstream station or line in a starved/idle state with no equipment fault alarm active, often preceded by low or empty buffer/inventory counters at the chiller or weighing station and repeated short-to-medium wait states aligned with material arrival or batching schedules.
Countermeasure
Engineering guidanceImprove material flow planning and scheduling by synchronizing upstream supply, transport and batching with consumption rate, increasing buffer capacity or staging ahead of the constrained station, and coordinating weighing/chilling operations with production pacing to avoid queue formation.
4Sources
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 310 menit · as reported: “Antrian bahan baku di MSA”
Show verbatim quote
Antrian bahan baku di MSA chiller 309,6 ✔ NVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 33.4 menit · as reported: “antrian timbang”
Show verbatim quote
antrian timbang 33,44 ✔ NVA
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 11.1 min · as reported: “Antrian timbang”
Show verbatim quote
Antrian timbang 11,14
- Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT (2022)Open sourceLost time: 160 min · as reported: “Antrian bahan baku di MSA”
Show verbatim quote
MSA lead time (menit) 309,6 159,84 48,37 %