Penerapan value stream mapping untuk peningkatan produktivitas produksi okra beku di PT. MDT
1Bibliographic record
- Authors
- Ida Bagus Suryaningrat, Bambang Herry Purnomo, Fatimah Fatimah
- Year
- 2022
- Venue
- Agrointek
- Country
- Indonesia
- Segment
- Fruit and vegetable processing
- Process family
- Whole plant or unspecified
- Study type
- Single case study
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- 90 days
- Data collection
- manual_logs
- Intervention
Show the setting as described by the study
Salah satu perusahaan yang bergerak di pengolahan hasil pertanian sayuran beku adalah PT. MDT, dengan produk unggulannya berupa okra beku.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers. | 0 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?The reported causes or categories sum to at least 90% of the stated total, or an explicit "other" class closes the balance. | 2 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
Antrian bahan baku di MSAchillerShow verbatim quote (Tabel 2)Antrian bahan baku di MSA chiller 309,6 ✔ NVA | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 310 menit | Both extractors agreed |
antrian proses ke sortasi & potongShow verbatim quote (Tabel 2)antrian proses ke sortasi & potong 6,34 ✔ NVA | Idling and minor stops (micro-stops) | Lost time | 6.34 menit | Adjudicated |
menunggu pengirimanShow verbatim quote (Tabel 2)menunggu pengiriman 180 ✔ NVA | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 180 menit | Adjudicated |
proses sortasi terhentiShow verbatim quote (Tabel 2)proses sortasi terhenti 14,03 ✔ NVA | Equipment failure (breakdowns) | Lost time | 14.0 menit | Adjudicated |
antrian timbangShow verbatim quote (Tabel 2)antrian timbang 33,44 ✔ NVA | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 33.4 menit | Adjudicated |
QC raw materialShow verbatim quote (Tabel 2)QC raw material 10,96 1 ✔ NNVA | Not classifiable from the report | Lost time | 11.0 menit | Single extractor |
transportasi ke sortasi & potongShow verbatim quote (Tabel 2)transportasi ke sortasi & potong 0,42 2 ✔ NNVA | Not classifiable from the report | Lost time | 0.420 menit | Single extractor |
transportasi ke pengecekanShow verbatim quote (Tabel 2)transportasi ke pengecekan 0,25 1 ✔ NNVA | Not classifiable from the report | Lost time | 0.250 menit | Single extractor |
QC sortasi dan potongShow verbatim quote (Tabel 2)QC sortasi dan potong 1,94 1 ✔ NNVA | Not classifiable from the report | Lost time | 1.94 menit | Single extractor |
pengiriman ke sortasitrollyShow verbatim quote (Tabel 2)pengiriman ke sortasi trolly 0,37 2 ✔ NNVA | Not classifiable from the report | Lost time | 0.370 menit | Single extractor |
QC IQFShow verbatim quote (Tabel 2)QC IQF 0,73 ✔ NNVA | Not classifiable from the report | Lost time | 0.730 menit | Single extractor |
transportasi ke sortasi finaltrollyShow verbatim quote (Tabel 2)transportasi ke sortasi final trolly 5,00 2 ✔ NNVA | Not classifiable from the report | Lost time | 5.00 menit | Single extractor |
QC sortasi finalShow verbatim quote (Tabel 2)QC sortasi final 2,24 1 ✔ NNVA | Not classifiable from the report | Lost time | 2.24 menit | Single extractor |
transportasi ke packingTrollyShow verbatim quote (Tabel 2)transportasi ke packing Trolly 5,00 2 ✔ NNVA | Not classifiable from the report | Lost time | 5.00 menit | Single extractor |
—Show verbatim quote (Tabel 2)NVA 543,41 | Not classifiable from the report | Lost time | 543 menit | Single extractor |
—Show verbatim quote (Tabel 2)NNVA 26,99 | Not classifiable from the report | Lost time | 27.0 menit | Single extractor |
Antrian proses ke sortasi & potongShow verbatim quote (Table 9, Row 5)Antrian proses ke sortasi & potong 6,34 | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 6.34 min | Single extractor |
Antrian timbangShow verbatim quote (Table 9, Row 10)Antrian timbang 11,14 | Idling and minor stops (micro-stops) | Lost time | 11.1 min | Single extractor |
Antrian bahan baku di MSAchillerShow verbatim quote (Table 10)MSA lead time (menit) 309,6 159,84 48,37 % | Organizational or external stops (material or personnel shortage, utilities outage) | Lost time | 160 min | Single extractor |
Proses sortasi terhentiShow verbatim quote (Table 9, Row 17)Proses sortasi terhenti 14,03 | Not classifiable from the report | Lost time | 14.0 min | Single extractor |
Menunggu pengirimanShow verbatim quote (Table 9, Row 32)Menunggu pengiriman 180 | Planned downtime (scheduled maintenance, breaks, no demand) | Lost time | 180 min | Single extractor |
Observation units
- Okra whole production line (PT. MDT, current state) · Whole line or unspecified equipment · Baseline
- Okra production line · Whole line or unspecified equipment · After intervention