Raw material staging congestion (frequent pallet relocation)
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 127 studies that could observe it (sparse evidence).
What happens
Insufficient or poorly organized staging space in the raw material holding or thawing area forces operators to repeatedly move pallets to free access routes, maintain rotation order or make room for incoming lots. This non value adding handling consumes labor and forklift capacity and delays the availability of thawed or staged material for the line, creating an organizational bottleneck upstream of production rather than an equipment fault.
What is done about it
Redesign the staging or thawing area layout with dedicated FIFO lanes sized to real buffer needs, define fixed pallet slotting rules and clear access aisles, and schedule incoming lots to minimize double handling, so that material reaches the line without unnecessary intermediate relocations.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.5% [0.1–1.4%]
- Expected share of lost time
- 0.3% [0.1–0.8%]
- Share of lost time when present
- 57% [45–67%]
- Studies / units
- 127 / 161
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.3%]13 studies
- Soft drinks, bottled water and juices0.6% [0.1–1.9%]26 studies
- Brewing, wine and spirits0.6% [0.1–2.2%]11 studies
- Bakery and pasta0.6% [0.1–2.0%]24 studies
- Meat, poultry and seafood0.9% [0.1–3.3%]9 studies
- Fruit and vegetable processing0.6% [0.1–2.2%]7 studies
- Grain and oilseed milling0.6% [0.1–2.4%]6 studies
- Sugar and confectionery0.6% [0.1–2.3%]9 studies
- Snacks, coffee, tea and other foods0.6% [0.1–2.3%]5 studies
- Animal feed and pet food0.6% [0.1–2.4%]7 studies
- Food manufacturing (unspecified or mixed)0.6% [0.1–2.3%]10 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceInsufficient or poorly organized staging space in the raw material holding or thawing area forces operators to repeatedly move pallets to free access routes, maintain rotation order or make room for incoming lots. This non value adding handling consumes labor and forklift capacity and delays the availability of thawed or staged material for the line, creating an organizational bottleneck upstream of production rather than an equipment fault.
How it looks in SCADA data
Engineering guidanceRarely captured directly by SCADA since it occurs outside the controlled process area; it appears indirectly as material starvation or shortage stops logged at the first production machine, extended intervals between material request and material arrival in MES logistics modules, and elevated forklift or warehouse management system movement counts without corresponding production output.
Countermeasure
Engineering guidanceRedesign the staging or thawing area layout with dedicated FIFO lanes sized to real buffer needs, define fixed pallet slotting rules and clear access aisles, and schedule incoming lots to minimize double handling, so that material reaches the line without unnecessary intermediate relocations.
4Sources
- Exploring Lean Manufacturing Integration and Performance Evaluation for Process Optimization in the Food Processing Industry (2026)Open sourceShare of loss events: 18.0 % · as reported: “frequent relocation of raw material pallets within the thawing area”
Show verbatim quote
Additionally, the frequent relocation of raw material pallets within the thawing area represents 18% of waste and the requirement for a 25-minute cleaning cycle of the tamping machine before each batch contributes 14.4%.

