Exploring Lean Manufacturing Integration and Performance Evaluation for Process Optimization in the Food Processing Industry

Open source

1Bibliographic record

Authors
Reema Al-Dalain
Year
2026
Venue
Production Engineering Archives
Country
Jordan
Segment
Meat, poultry and seafood
Process family
Slaughter, cutting and primary processing
Study type
Single case study
Extraction scope
Full text
Size
1 plants · 1 lines · 6 machines
Observation period
6 days
Data collection
manual_logs
Intervention
Show the setting as described by the study
The framework is applied as a case study in a frozen food production line characterized by six sequential processing stages exhibiting wide ranging process reliability and significant change over time variability, providing an empirically rich context for examining how probabilistic analysis complement deterministic lean tools.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 9Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product or sector is given but the equipment or process is only partly described.1 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?No definition; metrics are reported as bare numbers.0 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Observational study, or intervention study that reports baseline and post-intervention data with the same method.2 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
The process begins with Thawing, which takes approximately 85 minutes of cycle time and an additional 42 minutes for changeovers, operating at a low 11% uptime, indicating substantial inefficiencies.
Setup and adjustmentsLost time42.0 minSingle extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
The process begins with Thawing, which takes approximately 85 minutes of cycle time and an additional 42 minutes for changeovers, operating at a low 11% uptime, indicating substantial inefficiencies.
noneAvailability11.0 %Single extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
Next, materials proceed to Marinating, with a 20-minute cycle time, 14-minute changeover, and an uptime of 70%, still reflecting limited operational effectiveness.
Setup and adjustmentsLost time14.0 minSingle extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
Next, materials proceed to Marinating, with a 20-minute cycle time, 14-minute changeover, and an uptime of 70%, still reflecting limited operational effectiveness.
noneAvailability70.0 %Single extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
The Compressing stage follows, requiring 25 minutes per cycle, 22 minutes for changeovers, and achieving 80% uptime.
Setup and adjustmentsLost time22.0 minSingle extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
The Compressing stage follows, requiring 25 minutes per cycle, 22 minutes for changeovers, and achieving 80% uptime.
noneAvailability80.0 %Single extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
In the Portioning (Trimming) process, performance improves, with a 55-minute cycle, 11-minute changeover, and a 90% uptime, marking a relatively stable operation.
Setup and adjustmentsLost time11.0 minSingle extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
In the Portioning (Trimming) process, performance improves, with a 55-minute cycle, 11-minute changeover, and a 90% uptime, marking a relatively stable operation.
noneAvailability90.0 %Single extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
The Shock Freeze stage is more efficient, with a 95-minute cycle, 9-minute changeover, and 95% uptime.
Setup and adjustmentsLost time9.00 minSingle extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
The Shock Freeze stage is more efficient, with a 95-minute cycle, 9-minute changeover, and 95% uptime.
noneAvailability95.0 %Single extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
Finally, in Packing, the process takes 85 minutes per cycle, 8 minutes for changeovers, and operates at 94% uptime before products are shipped.
Setup and adjustmentsLost time8.00 minSingle extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
Finally, in Packing, the process takes 85 minutes per cycle, 8 minutes for changeovers, and operates at 94% uptime before products are shipped.
noneAvailability94.0 %Single extractor
—
Show verbatim quote (Section 3.4 Value Stream Mapping)
The weighted average up-time of 73% across all stages masks the severity of the Thawing bottleneck, which operates at only 11% effective availability, implying 89% downtime that cascades delays throughout the entire value stream.
noneAvailability73.0 %Single extractor
excess stock of raw food awaiting processing
Show verbatim quote (Section 3.3 Pareto Analysis / Fig. 1)
The graph indicates that excess stock of raw food awaiting processing accounts for approximately 22% of total waste, while frequent miscommunication between operators contributes around 20%.
Organizational or external stops (material or personnel shortage, utilities outage)Share of loss events22.0 %Single extractor
frequent miscommunication between operators
Show verbatim quote (Section 3.3 Pareto Analysis / Fig. 1)
The graph indicates that excess stock of raw food awaiting processing accounts for approximately 22% of total waste, while frequent miscommunication between operators contributes around 20%.
Organizational or external stops (material or personnel shortage, utilities outage)Share of loss events20.0 %Single extractor
frequent relocation of raw material pallets within the thawing area
Show verbatim quote (Section 3.3 Pareto Analysis / Fig. 1)
Additionally, the frequent relocation of raw material pallets within the thawing area represents 18% of waste and the requirement for a 25-minute cleaning cycle of the tamping machine before each batch contributes 14.4%.
Organizational or external stops (material or personnel shortage, utilities outage)Share of loss events18.0 %Single extractor
25-minute cleaning cycle of the tamping machine before each batchtamping machine
Show verbatim quote (Section 3.3 Pareto Analysis / Fig. 1)
Additionally, the frequent relocation of raw material pallets within the thawing area represents 18% of waste and the requirement for a 25-minute cleaning cycle of the tamping machine before each batch contributes 14.4%.
Setup and adjustmentsShare of loss events14.4 %Single extractor

Observation units

  • Thawing · Refrigeration and freezing · Baseline
  • Marinating · Mixing and blending · Baseline
  • Compressing · Forming, moulding and depositing · Baseline
  • Portioning (Trimming) · Cutting, slicing and deboning · Baseline
  • Shock Freeze · Refrigeration and freezing · Baseline
  • Packing · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Whole line · Whole line or unspecified equipment · Baseline