Raw material supply interruption causing filler readjustment

organizational externalFilling

In short

It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 57 % of the line's lost time. Reported by 1 of the 120 studies that could observe it (sparse evidence).

What happens

An upstream break or shortfall in the flow of product to be filled (raw material, bulk product, or component) halts the vacuum filler; once supply resumes, the equipment has to be readjusted (vacuum level, dosing parameters, nozzle timing) before stable filling can continue. The stoppage itself originates outside the filler, but the recovery requires a manual equipment adjustment.

What is done about it

Maintain buffer stock or intermediate storage of the material feeding the filler, improve coordination and scheduling with upstream suppliers or processes, and implement standardized restart procedures with pre-set parameters to shorten the readjustment time after a supply break.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.6% [0.1–1.6%]
Expected share of lost time
0.3% [0.1–0.9%]
Share of lost time when present
57% [45–67%]
Studies / units
120 / 162
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    0.6% [0.1–2.3%]18 studies
  • Soft drinks, bottled water and juices
    0.5% [0.1–1.8%]44 studies
  • Brewing, wine and spirits
    0.6% [0.1–2.3%]16 studies
  • Bakery and pasta
    0.7% [0.1–2.8%]0 studies
  • Meat, poultry and seafood
    1.0% [0.1–3.7%]6 studies
  • Fruit and vegetable processing
    0.7% [0.1–2.6%]4 studies
  • Grain and oilseed milling
    0.7% [0.1–2.5%]6 studies
  • Sugar and confectionery
    0.7% [0.1–2.5%]3 studies
  • Snacks, coffee, tea and other foods
    0.7% [0.1–2.5%]6 studies
  • Animal feed and pet food
    0.7% [0.1–2.6%]4 studies
  • Food manufacturing (unspecified or mixed)
    0.6% [0.1–2.4%]13 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

An upstream break or shortfall in the flow of product to be filled (raw material, bulk product, or component) halts the vacuum filler; once supply resumes, the equipment has to be readjusted (vacuum level, dosing parameters, nozzle timing) before stable filling can continue. The stoppage itself originates outside the filler, but the recovery requires a manual equipment adjustment.

How it looks in SCADA data

Engineering guidance

Upstream flow or level sensors show loss of material feed while the filler state transitions to idle or starved; the stop is followed by an extended non-production interval during which setpoints are modified and the machine cycles through manual or adjustment mode before returning to automatic run. Repeated short runs with parameter changes logged around each restart are typical.

Countermeasure

Engineering guidance

Maintain buffer stock or intermediate storage of the material feeding the filler, improve coordination and scheduling with upstream suppliers or processes, and implement standardized restart procedures with pre-set parameters to shorten the readjustment time after a supply break.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Lost time: 82.0 min · as reported: “Readjustment of equipment; Interruptions in the supply of raw materials”
    Show verbatim quote
    Downtime (Dt) – ПР = 82 min.: Readjustment of equipment; Interruptions in the supply of raw materials.