It appears in about 1 of every 100 lines studied.

When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 31 studies that could observe it (sparse evidence).

What happens

Before a mixing batch can start, operators must manually weigh out the raw materials according to the formulation and physically carry or hoist them to the level or hopper where the mixer is charged. This preparatory handling is sequential with respect to the mixer and adds non-productive time to the changeover or batch-start window, especially when materials must be moved between floors or storage areas.

What is done about it

Pre-weigh and stage raw materials in advance during the running time of the previous batch, and use automated or semi-automated dosing/batching systems with pneumatic or mechanical conveying to the mixing level to eliminate manual carrying. Kitting of materials and parallel preparation activities reduce the sequential dependency and shorten the changeover or batch-start interval.

Practical guidance written from engineering knowledge; it is not a statistical estimate.

1Probability and evidence

Pooled over all segments. A wide interval is a result: it states how much the evidence allows us to know.
Probability of presence
0.8% [0.1–2.7%]
Expected share of lost time
0.5% [0.1–1.5%]
Share of lost time when present
56% [43–68%]
Studies / units
31 / 40
Evidence grade
D

Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.

2Probability by segment

Partially pooled estimates for each industry segment.
  • Dairy products
    1.0% [0.1–3.9%]6 studies
  • Soft drinks, bottled water and juices
    1.0% [0.1–3.8%]2 studies
  • Brewing, wine and spirits
    1.0% [0.1–4.0%]0 studies
  • Bakery and pasta
    1.4% [0.1–5.5%]2 studies
  • Meat, poultry and seafood
    1.0% [0.1–4.1%]1 study
  • Fruit and vegetable processing
    1.0% [0.1–3.9%]2 studies
  • Grain and oilseed milling
    1.0% [0.1–4.4%]0 studies
  • Sugar and confectionery
    1.0% [0.1–4.1%]3 studies
  • Snacks, coffee, tea and other foods
    0.9% [0.1–3.5%]3 studies
  • Animal feed and pet food
    1.0% [0.1–3.6%]5 studies
  • Food manufacturing (unspecified or mixed)
    1.0% [0.1–3.9%]7 studies

3Mechanism, SCADA signature and countermeasure

Engineering guidance that helps recognise and address the cause; it is not part of the statistical estimate.

Mechanism

Engineering guidance

Before a mixing batch can start, operators must manually weigh out the raw materials according to the formulation and physically carry or hoist them to the level or hopper where the mixer is charged. This preparatory handling is sequential with respect to the mixer and adds non-productive time to the changeover or batch-start window, especially when materials must be moved between floors or storage areas.

How it looks in SCADA data

Engineering guidance

The mixer remains in an idle or waiting-for-material state with no agitation or feed signal active, preceded by a gap in which no weighing or charging event is logged in the MES/batch record. Operator or material-handling activity (weighing station use, hoist or elevator cycles) is recorded outside the mixer's run-state log, creating a visible dead time between end of previous batch and start of mixing.

Countermeasure

Engineering guidance

Pre-weigh and stage raw materials in advance during the running time of the previous batch, and use automated or semi-automated dosing/batching systems with pneumatic or mechanical conveying to the mixing level to eliminate manual carrying. Kitting of materials and parallel preparation activities reduce the sequential dependency and shorten the changeover or batch-start interval.

4Sources

Every extracted datum with its study, value and verbatim quote.
  1. Mean event duration: 0.960 min · as reported: “Weigh raw materials”
    Show verbatim quote
    Weigh raw materials Weighing operators Weighing operators External External 0.96 0.96
  2. Mean event duration: 2.30 min · as reported: “Move raw material from weighing to 3rd level”
    Show verbatim quote
    Move raw material from weighing to 3rd level Operator 2 DRY / Weighing operators Operator 2 DRY / Weighing operators Internal External 2.30 3.00
  3. Mean event duration: 0.960 min · as reported: “Weigh raw materials”
    Show verbatim quote
    Weigh raw materials Weighing operators Weighing operators External External 0.96 0.96
  4. Mean event duration: 3.00 min · as reported: “Move raw material from weighing to 3rd level”
    Show verbatim quote
    Move raw material from weighing to 3rd level Operator 2 DRY / Weighing operators Operator 2 DRY / Weighing operators Internal External 2.30 3.00