Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S
1Bibliographic record
- Authors
- Edgar Manuel Chávez Calle, Steven Alexander Guzmán Rodríguez, Carlos Alberto Gálvez Zárate, Paul Angello Daniel Sanchez Soto
- Year
- 2026
- Venue
- International Conference on Industrial Engineering and Operations Management (IEOM)
- Country
- Peru
- Segment
- Bakery and pasta
- Process family
- Mixing and formulation
- Study type
- Before/after intervention
- Extraction scope
- Full text
- Size
- 1 plants · 1 lines · — machines
- Observation period
- —
- Data collection
- maintenance_records
- Intervention
Show the setting as described by the study
Our research has a quasi-experimental methodological design, using real data from a company that produces bread and pastry mixes.
2Risk of bias
Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
| Item | Score |
|---|---|
| Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described. | 2 / 2 |
| Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given. | 1 / 2 |
| How were loss data collected?Manual logs or maintenance records with unknown completeness. | 1 / 2 |
| Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown. | 1 / 2 |
| Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed. | 1 / 2 |
| Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method. | 1 / 2 |
| Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked. | 1 / 2 |
| Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result. | 2 / 2 |
3Extracted data
Each datum with its classification and the verbatim quote that states it.
| Reported cause | Loss category | Metric | Value | Extraction |
|---|---|---|---|---|
mechanical failure (corrective intervention)automatic sewing machineShow verbatim quote (Table 4 / Results section)The baseline Mean Time Between Failures (MTBF) was 22.61 hours with a standard deviation of 10.91 hours; average corrective intervention time was 11.69 hours (see Table 4). | Equipment failure (breakdowns) | Time between events | 22.6 h | Both extractors agreed |
mechanical failure (corrective intervention)automatic sewing machineShow verbatim quote (Table 4 / Results section)The baseline Mean Time Between Failures (MTBF) was 22.61 hours with a standard deviation of 10.91 hours; average corrective intervention time was 11.69 hours (see Table 4). | Equipment failure (breakdowns) | Mean event duration | 11.7 h | Both extractors agreed |
WeighingShow verbatim quote (Table 1)Weighing 23.49 21.62 8% | Idling and minor stops (micro-stops) | Mean event duration | 23.5 min | Single extractor |
TransferShow verbatim quote (Table 1)Transfer 3.02 2.96 2% | Idling and minor stops (micro-stops) | Mean event duration | 3.02 min | Single extractor |
WeighingShow verbatim quote (Table 1)Weighing 23.49 21.62 8% | Idling and minor stops (micro-stops) | Mean event duration | 21.6 min | Single extractor |
TransferShow verbatim quote (Table 1)Transfer 3.02 2.96 2% | Idling and minor stops (micro-stops) | Mean event duration | 2.96 min | Single extractor |
Total TimeShow verbatim quote (Table 2)Total Time 27.25 18.22 9.04 | Setup and adjustments | Mean event duration | 27.3 min | Single extractor |
Stop machineDRY line machineShow verbatim quote (Table 2)Stop machine Operator 1 DRY Operator 1 DRY Internal Internal 0.13 0.17 | Setup and adjustments | Mean event duration | 0.130 min | Single extractor |
Bring torch for cleaning of 2nd levelShow verbatim quote (Table 2)Bring torch for cleaning of 2nd level Operator 2 DRY Operator 2 DRY External External 0.22 0.25 | Setup and adjustments | Mean event duration | 0.220 min | Single extractor |
Weigh raw materialsShow verbatim quote (Table 2)Weigh raw materials Weighing operators Weighing operators External External 0.96 0.96 | Setup and adjustments | Mean event duration | 0.960 min | Single extractor |
Clean bag breakerbag breakerShow verbatim quote (Table 2)Clean bag breaker Operator 1 DRY Operator 1 DRY Internal Internal 5.50 5.50 | Setup and adjustments | Mean event duration | 5.50 min | Single extractor |
Move raw material from weighing to 3rd levelShow verbatim quote (Table 2)Move raw material from weighing to 3rd level Operator 2 DRY / Weighing operators Operator 2 DRY / Weighing operators Internal External 2.30 3.00 | Setup and adjustments | Mean event duration | 2.30 min | Single extractor |
Clean 3rd level with broom and vacuum3rd levelShow verbatim quote (Table 2)Clean 3rd level with broom and vacuum Operator 2 DRY Operator 2 DRY Internal Internal 4.50 2.60 | Setup and adjustments | Mean event duration | 4.50 min | Single extractor |
Machine prep for operationDRY line machineShow verbatim quote (Table 2)Machine prep for operation Operator 2 DRY Operator 2 DRY Internal Internal 2.80 2.80 | Setup and adjustments | Mean event duration | 2.80 min | Single extractor |
Clean mixer at 2nd level with broom and airmixerShow verbatim quote (Table 2)Clean mixer at 2nd level with broom and air Operator 1 DRY Operator 1 DRY Internal Internal 16.00 7.80 | Setup and adjustments | Mean event duration | 16.0 min | Single extractor |
Move pallets from elevator cabin to 3rd level machineShow verbatim quote (Table 2)Move pallets from elevator cabin to 3rd level machine Operator 2 DRY Operator 2 DRY Internal Internal 0.80 0.80 | Setup and adjustments | Mean event duration | 0.800 min | Single extractor |
Relocate leftover inputs on a separate palletShow verbatim quote (Table 2)Relocate leftover inputs on a separate pallet Operator 2 DRY Operator 2 DRY Internal Internal 0.97 0.97 | Setup and adjustments | Mean event duration | 0.970 min | Single extractor |
Verify inputs match production planningShow verbatim quote (Table 2)Verify inputs match production planning Operator 1 & 2 DRY Operator 2 DRY Internal Internal 3.82 3.82 | Setup and adjustments | Mean event duration | 3.82 min | Single extractor |
Check expiration date of inputsShow verbatim quote (Table 2)Check expiration date of inputs Quality operator Quality operator Internal Internal 0.87 0 | Setup and adjustments | Mean event duration | 0.870 min | Single extractor |
Start the machineDRY line machineShow verbatim quote (Table 2)Start the machine Operator 1 DRY Operator 1 DRY Internal Internal 0.93 0.93 | Setup and adjustments | Mean event duration | 0.930 min | Single extractor |
Total TimeShow verbatim quote (Table 2)Total Time 27.25 18.22 9.04 | Setup and adjustments | Mean event duration | 18.2 min | Single extractor |
Stop machineDRY line machineShow verbatim quote (Table 2)Stop machine Operator 1 DRY Operator 1 DRY Internal Internal 0.13 0.17 | Setup and adjustments | Mean event duration | 0.170 min | Single extractor |
Bring torch for cleaning of 2nd levelShow verbatim quote (Table 2)Bring torch for cleaning of 2nd level Operator 2 DRY Operator 2 DRY External External 0.22 0.25 | Setup and adjustments | Mean event duration | 0.250 min | Single extractor |
Weigh raw materialsShow verbatim quote (Table 2)Weigh raw materials Weighing operators Weighing operators External External 0.96 0.96 | Setup and adjustments | Mean event duration | 0.960 min | Single extractor |
Clean bag breakerbag breakerShow verbatim quote (Table 2)Clean bag breaker Operator 1 DRY Operator 1 DRY Internal Internal 5.50 5.50 | Setup and adjustments | Mean event duration | 5.50 min | Single extractor |
Move raw material from weighing to 3rd levelShow verbatim quote (Table 2)Move raw material from weighing to 3rd level Operator 2 DRY / Weighing operators Operator 2 DRY / Weighing operators Internal External 2.30 3.00 | Setup and adjustments | Mean event duration | 3.00 min | Single extractor |
Clean 3rd level with broom and vacuum3rd levelShow verbatim quote (Table 2)Clean 3rd level with broom and vacuum Operator 2 DRY Operator 2 DRY Internal Internal 4.50 2.60 | Setup and adjustments | Mean event duration | 2.60 min | Single extractor |
Machine prep for operationDRY line machineShow verbatim quote (Table 2)Machine prep for operation Operator 2 DRY Operator 2 DRY Internal Internal 2.80 2.80 | Setup and adjustments | Mean event duration | 2.80 min | Single extractor |
Clean mixer at 2nd level with broom and airmixerShow verbatim quote (Table 2)Clean mixer at 2nd level with broom and air Operator 1 DRY Operator 1 DRY Internal Internal 16.00 7.80 | Setup and adjustments | Mean event duration | 7.80 min | Single extractor |
Move pallets from elevator cabin to 3rd level machineShow verbatim quote (Table 2)Move pallets from elevator cabin to 3rd level machine Operator 2 DRY Operator 2 DRY Internal Internal 0.80 0.80 | Setup and adjustments | Mean event duration | 0.800 min | Single extractor |
Relocate leftover inputs on a separate palletShow verbatim quote (Table 2)Relocate leftover inputs on a separate pallet Operator 2 DRY Operator 2 DRY Internal Internal 0.97 0.97 | Setup and adjustments | Mean event duration | 0.970 min | Single extractor |
Verify inputs match production planningShow verbatim quote (Table 2)Verify inputs match production planning Operator 1 & 2 DRY Operator 2 DRY Internal Internal 3.82 3.82 | Setup and adjustments | Mean event duration | 3.82 min | Single extractor |
Check expiration date of inputsShow verbatim quote (Table 2)Check expiration date of inputs Quality operator Quality operator Internal Internal 0.87 0 | Setup and adjustments | Mean event duration | 0 min | Single extractor |
Start the machineDRY line machineShow verbatim quote (Table 2)Start the machine Operator 1 DRY Operator 1 DRY Internal Internal 0.93 0.93 | Setup and adjustments | Mean event duration | 0.930 min | Single extractor |
Changeover (SKU average)Show verbatim quote (Table 3)1 - 5 24.91 16.66 33.1% | Setup and adjustments | Mean event duration | 24.9 min | Single extractor |
Changeover (SKU average)Show verbatim quote (Table 3)1 - 5 24.91 16.66 33.1% | Setup and adjustments | Mean event duration | 16.7 min | Single extractor |
mechanical failureautomatic sewing machineShow verbatim quote (Results section (Table 3 reference))on the 3rd of that month, 32 hours of operation were recorded until intervention, while on the 29th of the same month, only 6.25 hours were reached before maintenance was required. | Equipment failure (breakdowns) | Time between events | 32.0 h | Single extractor |
mechanical failureautomatic sewing machineShow verbatim quote (Results section (Table 3 reference))on the 3rd of that month, 32 hours of operation were recorded until intervention, while on the 29th of the same month, only 6.25 hours were reached before maintenance was required. | Equipment failure (breakdowns) | Time between events | 6.25 h | Single extractor |
mechanical failuresShow verbatim quote (Abstract)the number of mechanical failures, which averaged 7 per month, was reduced to 1 failure per machine | Equipment failure (breakdowns) | Number of events | 7.00 failures/month | Single extractor |
Weighing (search and material location time)weighing areaShow verbatim quote (Table 1. Times before and after the implementation of 5S in the weighing and transfer activity)Weighing | 23.49 | Idling and minor stops (micro-stops) | Lost time | 23.5 min | Single extractor |
Transfer (intermediate staging and handoff delays)Show verbatim quote (Table 1)Transfer | 3.02 | Idling and minor stops (micro-stops) | Lost time | 3.02 min | Single extractor |
Observation units
- Automatic sewing machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
- Weighing and transfer activity · Whole line or unspecified equipment · Baseline
- Weighing and transfer activity · Whole line or unspecified equipment · After intervention
- DRY line format changeover (SMED breakdown) · Mixing and blending · Baseline
- DRY line format changeover (SMED breakdown) · Mixing and blending · After intervention
- SMED changeover - average across 5 SKUs · Mixing and blending · Baseline
- SMED changeover - average across 5 SKUs · Mixing and blending · After intervention
- Production line machines (plant-wide) · Whole line or unspecified equipment · Baseline
- Production line · Whole line or unspecified equipment · Baseline