Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S

Open source

1Bibliographic record

Authors
Edgar Manuel Chávez Calle, Steven Alexander Guzmán Rodríguez, Carlos Alberto Gálvez Zárate, Paul Angello Daniel Sanchez Soto
Year
2026
Venue
International Conference on Industrial Engineering and Operations Management (IEOM)
Country
Peru
Segment
Bakery and pasta
Process family
Mixing and formulation
Study type
Before/after intervention
Extraction scope
Full text
Size
1 plants · 1 lines · — machines
Observation period
—
Data collection
maintenance_records
Intervention
Show the setting as described by the study
Our research has a quasi-experimental methodological design, using real data from a company that produces bread and pastry mixes.

2Risk of bias

Scored with the rubric of the protocol: 2 low concern, 1 some concerns, 0 high concern.
Total score 10Moderate risk
ItemScore
Is the observed line, machine or plant described well enough to classify its segment, process and equipment?Product, process and equipment are all described.2 / 2
Is the observation period long enough and reported?Period reported but shorter than 30 days, or only the number of shifts is given.1 / 2
How were loss data collected?Manual logs or maintenance records with unknown completeness.1 / 2
Are OEE, loading time and the loss categories defined explicitly?A standard definition is cited but its application is not shown.1 / 2
Does the loss breakdown account for the total loss it claims to explain?Only the top causes are reported and the unexplained remainder can be computed.1 / 2
Is there evidence of selective reporting of favourable results?Intervention study in which baseline and post-intervention periods differ in length or method.1 / 2
Are the reported numbers internally consistent?Small inconsistencies (2 to 10 percentage points) or values that cannot be cross-checked.1 / 2
Could conflicts of interest or the source of the data bias the result?Academic or independent study, or conflicts declared and unrelated to the result.2 / 2

3Extracted data

Each datum with its classification and the verbatim quote that states it.
Reported causeLoss categoryMetricValueExtraction
mechanical failure (corrective intervention)automatic sewing machine
Show verbatim quote (Table 4 / Results section)
The baseline Mean Time Between Failures (MTBF) was 22.61 hours with a standard deviation of 10.91 hours; average corrective intervention time was 11.69 hours (see Table 4).
Equipment failure (breakdowns)Time between events22.6 hBoth extractors agreed
mechanical failure (corrective intervention)automatic sewing machine
Show verbatim quote (Table 4 / Results section)
The baseline Mean Time Between Failures (MTBF) was 22.61 hours with a standard deviation of 10.91 hours; average corrective intervention time was 11.69 hours (see Table 4).
Equipment failure (breakdowns)Mean event duration11.7 hBoth extractors agreed
Weighing
Show verbatim quote (Table 1)
Weighing 23.49 21.62 8%
Idling and minor stops (micro-stops)Mean event duration23.5 minSingle extractor
Transfer
Show verbatim quote (Table 1)
Transfer 3.02 2.96 2%
Idling and minor stops (micro-stops)Mean event duration3.02 minSingle extractor
Weighing
Show verbatim quote (Table 1)
Weighing 23.49 21.62 8%
Idling and minor stops (micro-stops)Mean event duration21.6 minSingle extractor
Transfer
Show verbatim quote (Table 1)
Transfer 3.02 2.96 2%
Idling and minor stops (micro-stops)Mean event duration2.96 minSingle extractor
Total Time
Show verbatim quote (Table 2)
Total Time 27.25 18.22 9.04
Setup and adjustmentsMean event duration27.3 minSingle extractor
Stop machineDRY line machine
Show verbatim quote (Table 2)
Stop machine Operator 1 DRY Operator 1 DRY Internal Internal 0.13 0.17
Setup and adjustmentsMean event duration0.130 minSingle extractor
Bring torch for cleaning of 2nd level
Show verbatim quote (Table 2)
Bring torch for cleaning of 2nd level Operator 2 DRY Operator 2 DRY External External 0.22 0.25
Setup and adjustmentsMean event duration0.220 minSingle extractor
Weigh raw materials
Show verbatim quote (Table 2)
Weigh raw materials Weighing operators Weighing operators External External 0.96 0.96
Setup and adjustmentsMean event duration0.960 minSingle extractor
Clean bag breakerbag breaker
Show verbatim quote (Table 2)
Clean bag breaker Operator 1 DRY Operator 1 DRY Internal Internal 5.50 5.50
Setup and adjustmentsMean event duration5.50 minSingle extractor
Move raw material from weighing to 3rd level
Show verbatim quote (Table 2)
Move raw material from weighing to 3rd level Operator 2 DRY / Weighing operators Operator 2 DRY / Weighing operators Internal External 2.30 3.00
Setup and adjustmentsMean event duration2.30 minSingle extractor
Clean 3rd level with broom and vacuum3rd level
Show verbatim quote (Table 2)
Clean 3rd level with broom and vacuum Operator 2 DRY Operator 2 DRY Internal Internal 4.50 2.60
Setup and adjustmentsMean event duration4.50 minSingle extractor
Machine prep for operationDRY line machine
Show verbatim quote (Table 2)
Machine prep for operation Operator 2 DRY Operator 2 DRY Internal Internal 2.80 2.80
Setup and adjustmentsMean event duration2.80 minSingle extractor
Clean mixer at 2nd level with broom and airmixer
Show verbatim quote (Table 2)
Clean mixer at 2nd level with broom and air Operator 1 DRY Operator 1 DRY Internal Internal 16.00 7.80
Setup and adjustmentsMean event duration16.0 minSingle extractor
Move pallets from elevator cabin to 3rd level machine
Show verbatim quote (Table 2)
Move pallets from elevator cabin to 3rd level machine Operator 2 DRY Operator 2 DRY Internal Internal 0.80 0.80
Setup and adjustmentsMean event duration0.800 minSingle extractor
Relocate leftover inputs on a separate pallet
Show verbatim quote (Table 2)
Relocate leftover inputs on a separate pallet Operator 2 DRY Operator 2 DRY Internal Internal 0.97 0.97
Setup and adjustmentsMean event duration0.970 minSingle extractor
Verify inputs match production planning
Show verbatim quote (Table 2)
Verify inputs match production planning Operator 1 & 2 DRY Operator 2 DRY Internal Internal 3.82 3.82
Setup and adjustmentsMean event duration3.82 minSingle extractor
Check expiration date of inputs
Show verbatim quote (Table 2)
Check expiration date of inputs Quality operator Quality operator Internal Internal 0.87 0
Setup and adjustmentsMean event duration0.870 minSingle extractor
Start the machineDRY line machine
Show verbatim quote (Table 2)
Start the machine Operator 1 DRY Operator 1 DRY Internal Internal 0.93 0.93
Setup and adjustmentsMean event duration0.930 minSingle extractor
Total Time
Show verbatim quote (Table 2)
Total Time 27.25 18.22 9.04
Setup and adjustmentsMean event duration18.2 minSingle extractor
Stop machineDRY line machine
Show verbatim quote (Table 2)
Stop machine Operator 1 DRY Operator 1 DRY Internal Internal 0.13 0.17
Setup and adjustmentsMean event duration0.170 minSingle extractor
Bring torch for cleaning of 2nd level
Show verbatim quote (Table 2)
Bring torch for cleaning of 2nd level Operator 2 DRY Operator 2 DRY External External 0.22 0.25
Setup and adjustmentsMean event duration0.250 minSingle extractor
Weigh raw materials
Show verbatim quote (Table 2)
Weigh raw materials Weighing operators Weighing operators External External 0.96 0.96
Setup and adjustmentsMean event duration0.960 minSingle extractor
Clean bag breakerbag breaker
Show verbatim quote (Table 2)
Clean bag breaker Operator 1 DRY Operator 1 DRY Internal Internal 5.50 5.50
Setup and adjustmentsMean event duration5.50 minSingle extractor
Move raw material from weighing to 3rd level
Show verbatim quote (Table 2)
Move raw material from weighing to 3rd level Operator 2 DRY / Weighing operators Operator 2 DRY / Weighing operators Internal External 2.30 3.00
Setup and adjustmentsMean event duration3.00 minSingle extractor
Clean 3rd level with broom and vacuum3rd level
Show verbatim quote (Table 2)
Clean 3rd level with broom and vacuum Operator 2 DRY Operator 2 DRY Internal Internal 4.50 2.60
Setup and adjustmentsMean event duration2.60 minSingle extractor
Machine prep for operationDRY line machine
Show verbatim quote (Table 2)
Machine prep for operation Operator 2 DRY Operator 2 DRY Internal Internal 2.80 2.80
Setup and adjustmentsMean event duration2.80 minSingle extractor
Clean mixer at 2nd level with broom and airmixer
Show verbatim quote (Table 2)
Clean mixer at 2nd level with broom and air Operator 1 DRY Operator 1 DRY Internal Internal 16.00 7.80
Setup and adjustmentsMean event duration7.80 minSingle extractor
Move pallets from elevator cabin to 3rd level machine
Show verbatim quote (Table 2)
Move pallets from elevator cabin to 3rd level machine Operator 2 DRY Operator 2 DRY Internal Internal 0.80 0.80
Setup and adjustmentsMean event duration0.800 minSingle extractor
Relocate leftover inputs on a separate pallet
Show verbatim quote (Table 2)
Relocate leftover inputs on a separate pallet Operator 2 DRY Operator 2 DRY Internal Internal 0.97 0.97
Setup and adjustmentsMean event duration0.970 minSingle extractor
Verify inputs match production planning
Show verbatim quote (Table 2)
Verify inputs match production planning Operator 1 & 2 DRY Operator 2 DRY Internal Internal 3.82 3.82
Setup and adjustmentsMean event duration3.82 minSingle extractor
Check expiration date of inputs
Show verbatim quote (Table 2)
Check expiration date of inputs Quality operator Quality operator Internal Internal 0.87 0
Setup and adjustmentsMean event duration0 minSingle extractor
Start the machineDRY line machine
Show verbatim quote (Table 2)
Start the machine Operator 1 DRY Operator 1 DRY Internal Internal 0.93 0.93
Setup and adjustmentsMean event duration0.930 minSingle extractor
Changeover (SKU average)
Show verbatim quote (Table 3)
1 - 5 24.91 16.66 33.1%
Setup and adjustmentsMean event duration24.9 minSingle extractor
Changeover (SKU average)
Show verbatim quote (Table 3)
1 - 5 24.91 16.66 33.1%
Setup and adjustmentsMean event duration16.7 minSingle extractor
mechanical failureautomatic sewing machine
Show verbatim quote (Results section (Table 3 reference))
on the 3rd of that month, 32 hours of operation were recorded until intervention, while on the 29th of the same month, only 6.25 hours were reached before maintenance was required.
Equipment failure (breakdowns)Time between events32.0 hSingle extractor
mechanical failureautomatic sewing machine
Show verbatim quote (Results section (Table 3 reference))
on the 3rd of that month, 32 hours of operation were recorded until intervention, while on the 29th of the same month, only 6.25 hours were reached before maintenance was required.
Equipment failure (breakdowns)Time between events6.25 hSingle extractor
mechanical failures
Show verbatim quote (Abstract)
the number of mechanical failures, which averaged 7 per month, was reduced to 1 failure per machine
Equipment failure (breakdowns)Number of events7.00 failures/monthSingle extractor
Weighing (search and material location time)weighing area
Show verbatim quote (Table 1. Times before and after the implementation of 5S in the weighing and transfer activity)
Weighing | 23.49
Idling and minor stops (micro-stops)Lost time23.5 minSingle extractor
Transfer (intermediate staging and handoff delays)
Show verbatim quote (Table 1)
Transfer | 3.02
Idling and minor stops (micro-stops)Lost time3.02 minSingle extractor

Observation units

  • Automatic sewing machine · Packaging (forming, sealing, wrapping, case packing, palletizing) · Baseline
  • Weighing and transfer activity · Whole line or unspecified equipment · Baseline
  • Weighing and transfer activity · Whole line or unspecified equipment · After intervention
  • DRY line format changeover (SMED breakdown) · Mixing and blending · Baseline
  • DRY line format changeover (SMED breakdown) · Mixing and blending · After intervention
  • SMED changeover - average across 5 SKUs · Mixing and blending · Baseline
  • SMED changeover - average across 5 SKUs · Mixing and blending · After intervention
  • Production line machines (plant-wide) · Whole line or unspecified equipment · Baseline
  • Production line · Whole line or unspecified equipment · Baseline