In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 120 studies that could observe it (sparse evidence).
What happens
The filling line is deliberately stopped for short, pre-scheduled operator breaks (rest periods, shift handover pauses) that are built into the production plan rather than arising from any equipment or process fault.
What is done about it
Stagger or rotate operator breaks using relief personnel so the vacuum filler can keep running, or synchronize breaks with other already-planned stoppages to avoid adding extra downtime to the line.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.6% [0.1–1.5%]
- Expected share of lost time
- 0.3% [0.1–0.9%]
- Share of lost time when present
- 56% [44–67%]
- Studies / units
- 120 / 162
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.6% [0.1–2.4%]18 studies
- Soft drinks, bottled water and juices0.5% [0.1–1.7%]44 studies
- Brewing, wine and spirits0.6% [0.1–2.3%]16 studies
- Bakery and pasta0.7% [0.1–2.6%]0 studies
- Meat, poultry and seafood1.0% [0.1–3.4%]6 studies
- Fruit and vegetable processing0.7% [0.1–2.6%]4 studies
- Grain and oilseed milling0.7% [0.1–2.7%]6 studies
- Sugar and confectionery0.7% [0.1–2.6%]3 studies
- Snacks, coffee, tea and other foods0.7% [0.1–2.4%]6 studies
- Animal feed and pet food0.7% [0.1–2.6%]4 studies
- Food manufacturing (unspecified or mixed)0.7% [0.1–2.4%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceThe filling line is deliberately stopped for short, pre-scheduled operator breaks (rest periods, shift handover pauses) that are built into the production plan rather than arising from any equipment or process fault.
How it looks in SCADA data
Engineering guidanceSCADA/MES logs show the filler entering a planned idle or standby state with no active alarms, at regular intervals that match the break schedule, with clean stop and restart commands typically issued or acknowledged by an operator.
Countermeasure
Engineering guidanceStagger or rotate operator breaks using relief personnel so the vacuum filler can keep running, or synchronize breaks with other already-planned stoppages to avoid adding extra downtime to the line.
4Sources
- Lost time: 30.0 min · as reported: “Short breaks”
Show verbatim quote
Short breaks (ShB) 2 times per 15 min. – 30 min.