In short
It appears in fewer than 1 of every 100 lines studied.
When it appears, it takes on average about 57 % of the line's lost time. Reported by 0 of the 120 studies that could observe it (sparse evidence).
What happens
At the change of shift the outgoing and incoming operators must review, complete and sign off the handover log (line status, open issues, in-progress batch data) before the new crew resumes production, which holds the filler idle beyond the pure mechanical restart time. This administrative dead time is treated as part of the changeover/adjustment window even though no equipment fault exists.
What is done about it
Standardize a concise digital handover template that is pre-filled during the previous shift and reviewed on an overlapping crew window so the line does not need to stay stopped while paperwork is completed, and train operators to execute the handover in parallel with other changeover tasks rather than sequentially.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.3% [0.1–1.0%]
- Expected share of lost time
- 0.2% [0.0–0.6%]
- Share of lost time when present
- 57% [44–67%]
- Studies / units
- 120 / 162
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products0.4% [0.0–1.5%]18 studies
- Soft drinks, bottled water and juices0.3% [0.0–1.2%]44 studies
- Brewing, wine and spirits0.4% [0.0–1.5%]16 studies
- Bakery and pasta0.4% [0.0–1.8%]0 studies
- Meat, poultry and seafood0.4% [0.0–1.6%]6 studies
- Fruit and vegetable processing0.4% [0.0–1.6%]4 studies
- Grain and oilseed milling0.4% [0.0–1.5%]6 studies
- Sugar and confectionery0.4% [0.0–1.6%]3 studies
- Snacks, coffee, tea and other foods0.4% [0.0–1.7%]6 studies
- Animal feed and pet food0.4% [0.0–1.6%]4 studies
- Food manufacturing (unspecified or mixed)0.4% [0.0–1.5%]13 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceAt the change of shift the outgoing and incoming operators must review, complete and sign off the handover log (line status, open issues, in-progress batch data) before the new crew resumes production, which holds the filler idle beyond the pure mechanical restart time. This administrative dead time is treated as part of the changeover/adjustment window even though no equipment fault exists.
How it looks in SCADA data
Engineering guidanceSCADA/MES shows the filler in an idle or manual state coinciding with scheduled shift-change times, with no fault code active and zero output counts during the window; the stop reason log is typically coded as administrative or changeover rather than a mechanical alarm, and the duration is fairly repeatable across shifts.
Countermeasure
Engineering guidanceStandardize a concise digital handover template that is pre-filled during the previous shift and reviewed on an overlapping crew window so the line does not need to stay stopped while paperwork is completed, and train operators to execute the handover in parallel with other changeover tasks rather than sequentially.
4Sources
- Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study (2021)Open sourceLost time: 3.00 min · as reported: “SHO Update”
Show verbatim quote
SHO Update 0:31:00 0:34:00 0:03:00