Machine start-up and shutdown procedure time
In short
It appears in about 1 of every 100 lines studied.
When it appears, it takes on average about 56 % of the line's lost time. Reported by 1 of the 31 studies that could observe it (sparse evidence).
What happens
Before production can begin or after it ends, the mixing machine must go through a sequence of preparation, warm-up or cool-down, and controlled stop steps that are not part of actual product throughput. This includes positioning tooling, purging or priming systems, verifying settings, and bringing the equipment to a safe idle or off state, all of which hold the line out of productive operation.
What is done about it
Standardize and document start-up and shutdown checklists, pre-stage tooling and settings before the scheduled window, and automate sequential steps (purge, warm-up, parameter loading) where feasible to shorten the non-productive interval. Track these intervals separately from faults to monitor and progressively reduce their duration.
Practical guidance written from engineering knowledge; it is not a statistical estimate.
1Probability and evidence
- Probability of presence
- 0.8% [0.1–2.7%]
- Expected share of lost time
- 0.5% [0.1–1.5%]
- Share of lost time when present
- 56% [44–67%]
- Studies / units
- 31 / 40
- Evidence grade
- D
Grade D: 0 or 1 study; the estimate is driven by partial pooling and priors, and the wide interval is the result.
2Probability by segment
- Dairy products1.0% [0.1–3.8%]6 studies
- Soft drinks, bottled water and juices1.0% [0.1–4.0%]2 studies
- Brewing, wine and spirits1.0% [0.1–4.3%]0 studies
- Bakery and pasta1.4% [0.1–5.5%]2 studies
- Meat, poultry and seafood1.0% [0.1–4.3%]1 study
- Fruit and vegetable processing1.0% [0.1–3.9%]2 studies
- Grain and oilseed milling1.0% [0.1–4.2%]0 studies
- Sugar and confectionery1.0% [0.1–3.9%]3 studies
- Snacks, coffee, tea and other foods1.0% [0.1–3.9%]3 studies
- Animal feed and pet food1.0% [0.1–3.8%]5 studies
- Food manufacturing (unspecified or mixed)0.9% [0.1–3.5%]7 studies
3Mechanism, SCADA signature and countermeasure
Mechanism
Engineering guidanceBefore production can begin or after it ends, the mixing machine must go through a sequence of preparation, warm-up or cool-down, and controlled stop steps that are not part of actual product throughput. This includes positioning tooling, purging or priming systems, verifying settings, and bringing the equipment to a safe idle or off state, all of which hold the line out of productive operation.
How it looks in SCADA data
Engineering guidanceMES/SCADA logs show a distinct machine state (preparation, start-up or shutdown) bounded by operator or recipe triggers, with no output counter increment during this interval. Repeated occurrences align with shift boundaries, order changes or planned stop events rather than random fault alarms.
Countermeasure
Engineering guidanceStandardize and document start-up and shutdown checklists, pre-stage tooling and settings before the scheduled window, and automate sequential steps (purge, warm-up, parameter loading) where feasible to shorten the non-productive interval. Track these intervals separately from faults to monitor and progressively reduce their duration.
4Sources
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceMean event duration: 0.130 min · as reported: “Stop machine”
Show verbatim quote
Stop machine Operator 1 DRY Operator 1 DRY Internal Internal 0.13 0.17
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceMean event duration: 2.80 min · as reported: “Machine prep for operation”
Show verbatim quote
Machine prep for operation Operator 2 DRY Operator 2 DRY Internal Internal 2.80 2.80
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceMean event duration: 0.930 min · as reported: “Start the machine”
Show verbatim quote
Start the machine Operator 1 DRY Operator 1 DRY Internal Internal 0.93 0.93
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceMean event duration: 0.170 min · as reported: “Stop machine”
Show verbatim quote
Stop machine Operator 1 DRY Operator 1 DRY Internal Internal 0.13 0.17
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceMean event duration: 2.80 min · as reported: “Machine prep for operation”
Show verbatim quote
Machine prep for operation Operator 2 DRY Operator 2 DRY Internal Internal 2.80 2.80
- Productivity Improvement in a Bakery and Pastry Premix Company by Applying Preventive Maintenance, SMED and 5´S (2026)Open sourceMean event duration: 0.930 min · as reported: “Start the machine”
Show verbatim quote
Start the machine Operator 1 DRY Operator 1 DRY Internal Internal 0.93 0.93